NOTICE OF VIOLATION Tennessee Valley Authority Browns Ferry Nuclear Plant Docket Nos.
50-259, 50-260, and 50-296 License Nos.
DPR-33, DPR-52, and DPR-68 During. an NRC inspection conducted on August 21-25, and September 11-14,
- 1995, a violation of NRC requirements was identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"
10 CFR Part 2, Appendix C, the violation is listed below:
10 CFR 50, Appendix 8, Criterion V, requires that activities affec'ting quality shall be prescribed by instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures or drawings.
Paragraph
- 6. 1. 1 of Modifications and Addition Instruction MAI 3.9, Installation of Cable Tray Supports and Cable Tray Covers, requires that cable tray supports be fabricated and installed according to the applicable design documents.
Contrary to the above, flare level welds on the vertical interfaces of bill of,material item numbers three and four for support number 319092-15-81102-38 were not completed as required by drawing number DCA W17473-300 and DCN F26704A AA-04.
This is a Severity Level IV violation (Supplement I) (Applicable for Unit 3 only).
Pursuant to the provisions of 10 CFR 2.201, is hereby required to submit a
written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN:
,Document Control
- Desk, Washington, D.C.
20555 with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).
This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation:
(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results
- achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
Your response may reference or include previous docketed correspondence if the correspondence adequately addresses the required response.
If an adequate reply is not received within the time specified in this Notice, an order or Demand:for Information may be issued as to why the license should not be
- modified, suspended, or revoked, or why such other action as may be proper should not be taken.
Where good cause is shown, consideration will be given to extending the response time.
Dated't Atlanta, Georgia this 12th day of October 1995 Enclosure 1