pe REGS
+4 Po Cy
~
~c 0O Ith9 ~
~O
~+**+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 ENNESSE A
Y UT DOCK T NO. 50-259 BROMNS FERRY NUC EAR PLANT UNIT 1
MENDMENT TO FACILITY OPERATING ICENS Amendment No. 217 License No.
DPR-33 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Tennessee Valley Authority (the licensee) dated September 29, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in-'compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of.',the Commis'sion's regulations and all applicable requirements have been~- satisfied.
9503030044 950208 PDR ADQCK 05000259 P
0
~,
2.,
3.
Accordingly; the license is amended by changes to the Technical Specifications as indicated in the attachment to this 'l~icense amendment and paragraph 2.'C.(2) of Facil;ity Operating License: No.
DPR-33 is hereby
- amended to read as: fol.lows:
(2) ~hi 1>>
if'he Technical,'Specifications contained in, Appendices A and 8, as revised through Amendment 'No.
- 217, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifi'cations.
This li'cense amendment is effective as of its date of issuance,and shall be.implemented within 30 days from the date of issuance.,
FOR THE NUCLEAR REGULATORY COMMISSION Frederick J.
H don, Director Project Directorate II-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
Peb~~
28, 1995
I'
ATTACHHENT TO LICENSE'HENDHENT NO. 217 FACILITY OPERATING 'LICENSE NO. 'DPR-33 DOCKET NO. 50-259 Revise the Appendix A Technical, Specifications by removing. the pages identi.fied below and inserting the enclosed pages.
The revised pages are identi;fied by the captioned.
amendment number.and contain marginal lines indicating the area of change.
Overleaf* page is provided to maintain document completeness.
REHOV 3.4/4.4-3 3.4/4,4'-4 INSER 3.4/4.4-3 3.4/4.4-4*
II 0
II f
oil
4'4 4 3.4.B.
w 4.4.B.
w t 1.
From and after the date that a redundant component is made or found to be inoperable, Specification 3.4.A.1 shall be considered fulfilled and continued operation permitted provided that the component is returned to an operable condition within seven days.
1.
When a component is found to be inoperable, its redundant component shall be demonstrated to be operable immediately and daily thereafter until the inoperable component is repaired.
3.4.C t
t'.4.C At all times when the Standby Liquid Control System is required to be OPERABLE, the following conditions shall be met:
The following tests shall be performed to verify the availability of the Liquid Control Solution:
l.
At least 186 pounds Boron-10 must be stored in the Standby Liquid Control'olution Tank and be available for injection.
2.
The sodium pentaborate solution concentration must be equal to or less than 9.2X by weight.
1.
Volume:
Check at least once per day.
2.
Sodium Pentaborate Concentration check at least once per month.
Also check concentration within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> anytime water or boron is added to the solution.
3.
Boron-10 Quantity:
At least once per month, calculate and record the quantity of Boron-10 stored in the Standby Liquid Control Solution Tank.
4.
Boron-10 Enrichment:
At least once per 18 months and following each addition of boron to the Standby Liquid Control Solution Tank:
BFN Unit 1 3.4/4.4-3 AEfENDHENT NO.. 217
0
4.4 a.
Calculate the enrich-ment within 24
'hours'.
'Verify by analysis within 30 days.
I 34D '~d 4.4.D Rhand~i.qu.isLC~al The Standby Liqui'd Control System conditions must. satisfy the following equation.
g 1
(13 wt.X)(86,gpm) (19.8.atom%)
- where, Verify'that the equation given in Specification 3.4.D is satisfied at least once per month and within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> anytime water or boron. is added to,the solution.
C = sodium pentaborate solution concentration (weight percent')
Determined by the most recent performance of the surveillance, instruction required by Specification 4.4.C.2.
Q = pump flow rate (gpm)
Determined, by the'ost recent performance of the survei'llance instruction required by Specification 4.4.A.2.b.
E = Boron-10 enrichment (atom percent Boron-10)
Determined by the most recent performance of the surveillance instruction required by Specification '4.4.C.4.
If Specification 3.4.A through-3.4.D cannot be met, make at least one subsystem OPERABLE within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or the reactor shall 'be placed in a SHUTDOWN CONDITION with all operable control rods fully.inserted within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
1.
No additional surveillance required.
BPN Unit 1
3.4/4.'4-4 AMEttDMEHT NO. 2 1 3
0 I
gIE 8 ASCII'o O
I O
4~
~O
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&0001 TENNESSEE VALLEY AUTHORITY
~E'E BROWNS F
R NUC AR P ANT UNIT 2 MENDMENT TO FACILITY OPERATING LICENSE Amendment No. 233 License No.
DPR-52 The Nuclear Regulatory.
Commission (the Commission) has found that:
A.
The application for amendment by Tennessee Valley Authority (the licensee) dated September 29,
- 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will'perate in conformity with the application, the provisions of the Act,, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and '(ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations.
and all applicable requirements have been satisfied.
0 0
2.
Accordingl'y, the license is amended;by changes to the Technical Specifications
.as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facil.ity 'Operating License No.
DPR-52.is hereby
- amended to read as follows:
'3.
,(2) echnical S ecifications The Technical. Specifications contained in Appendices A and 8, as revised through 'Amendment No.. 233, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
This license amendment is effective as of its date of issuance, and shall be implemented within 30 days from the date of issuance.
FOR THE NUCL'EAR REGULATORY COMMISSION Frederi'ck J.
He don, Director Project Directorate, II-4 Division of Reactor, Projects I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
February 28, 1995
I 41 4l
ATTACHMENT TO LICENSE AMENDMENT NO; 2
FACILITY OPERATING LIC NSE NO.
DPR-52 DOCKET O. 50-260 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed: pages.
The revised pages are
.identi.fied by the captioned amendment number and contain marginal; lines indicating the area of change.
Overleaf~ page is provided.to maintain document completeness.
REMOVE
, 3.4/4.4-3'.4/4.4-4 INSERT 3.4/4.4-3 3.4/4.4-4*
gt I~
41
.4 '4.4 I
G 3.4.B.
w 4.4.B.
w From and after the date that a redundant component is made or found to be inoperable, Specification 3.4.A.1 shall be considered fulfilled and continued operation permitted provided that the component is returned to an operable condition within seven days.
1.
When a component is found to be inoperable, its redundant component shall be demonstrated to be operable immediately and daily thereafter until the inoperable component is repaired.
3.4.C 4.4.C At all times when the Standby Liquid Control System is required to be OPERABLE, the following conditions shall'e met:
The following tests shall be performed to verify the availability of the Liquid Control Solution:
1.
At least 186 pounds Boron-10 must be stored in the Standby Liquid Control Solution Tank and be available for injection.
2.
The sodium pentaborate solution concentration must be equal to or less than 9.2X by weight.
i.
Volume:
Check at least once per day.
2.
Sodium Pentaborate Concentration check at least once per month.
Also check concentration within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> anytime water or boron is added to the solution.
3'.
Boron-10 Quantity:
At least once per month, calculate and record the quantity of Boron-10 stored in the Standby Liquid Control Solution Tank.
4.
Boron-10 Enrichment:
At least once per 18 months and following each addition of boron to the Standby Liquid Control Solution Tank:
BPN Unit 2 3.4/4.4-3
&EEIG)IIENT NO.
233
kP Il
a.
Calculate the enrich-ment within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
Verify by analysis within 30 days.
3.4.D-E
~
L 4.4.D The Standby Liquid Control System conditions must satisfy the following equation.
2 1
(1'3 wt.X)(86 gpm)(19.8 atom%)
- where, Verify that the equation given 'in Specification 3.4.D is satisfied at least once per month and within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> anytime water or boron is added to the solution.
C = sodium pentaborate solution concentration (weight percent)
Determined by the most recent performance of the surveillance instruction required by Specification 4.4.C.2.
Q = pump flow. rate (gpm)
Determined by the most recent performance of the surveillance instruction required by Specification 4.4.A.2.b.
E = Boron-10 enrichment (atom percent Boron-10)
Determined by the most recent performance of the surveillance instruction required by Specification 4.4.C.4.
- 1. If Specification 3.4.A through 3.4.D cannot be met, make at least one subsystem OPERABLE within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or the reactor shall be placed in a SHUTDOWN CONDITION with all OPERABLE control rods fully inserted within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
1.
No additional
)
surveillance required.
BED Unit 2 3.4/4.4-4 AMENOMEgr NO. 2 2 g
Ol
.h 4
(41P,R REC0
~o Op ClO I
ch Q
~O
++*,*+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-296 BROWNS FERRY NUCLEAR PLANT UNIT 3 AMENDM NT TO FAC TY OPERATING ICENSE Amendment No.
191 License No.
DPR-68 The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Tennessee Valley Authority (the licensee) dated September 29,
- 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
.and the Commission's rules and regulations set forth in 10 CFR Chapter I; 1
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of-the Commission; C.
There is reasonable assurance (i) that the activiti'es authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of'he Commission's regulations and all'pplicable requirements have been satisfied.
1,
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2),of Facility Operating 'License No.
DPR-68 is hereby amended to read as follows:
3.
(2) echnical S ecifications The Technical Specifications conta'ined in Appendices
'A and B,
as revised through Amendment No. 191, are hereby incorporated in the license.
The licensee shall opera'te the facility in accordance with the Technical Specifications.
This license amendment, is effective as of its date of issuance and shall be implemented within.30 days from the date of issuance.
I'OR THE NUCLEAR,REGULATORY COMMISSION Frederick J.,
He on, Director Project Directorate II-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical
'Specifications.
Date of Issuance:
Pebruary 28, 1995
ATTACHMENT TO LICENSE 'AMENDMENT NO.
1 1
FACI ITY OPERATI G
ICENSE NO.
DPR-68'OCKET NO. 50-296 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages.
The revi'sed pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.
Overleaf" page is provided to maintain document completeness.
REMOVE 3.4/4.4-3 3.4/4.4-4 INSERT 3.4/4.4-3 3.4/4.4-4*
4l
4'4 4
3.4.B.
4.4.B.
w 1.
From and after the date that a redundant component is made or found to be inoperable, Specification 3.4.A.l shall be considered fulfilled and continued operation permitted provided that the component is returned to an operable condition within seven days.
1.
When a component is found to be inoperable, its redundant component shall be demonstrated to be operable immediately and daily thereafter until the inoperable component is repaired.
3.4.C t
t'.4.C t
t't all times when the Standby Liquid Control System, is required to be OPERABLE, the following conditions shall be met:
The following tests shall be performed to verify the availability of the Liquid Control Solution:
1.
At least 186 pounds Boron-10 must be stored in the Standby Liquid Control Solution Tank and be available for injection.
2.
The sodium pentaborate solution concentration must be equal to or less than 9.2X by weight.
1.
Volume:
Check at least once per day.
2.
Sodium Pentaborate Concentration check at least once per month.
Also check concentration within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> anytime water or boron is added to the solution.
3.
Boron-10 Quantity:
At least once per month, calculate and record the quantity of Boron-10 stored in the Standby Liquid Control Solution Tank.
4.
Boron-10 Enrichment:
At least once per 18 months and following each addition of boron to the Standby Liquid Control Solution Tank:
BFN Unit 3 3.4/4.4-3 fJfZNDHEITT NO. 191
4i I
J 4g '
a
.4 4.4 L
a.
Calculate the enrich-ment within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
Verify by analysis, within 30 days..
l34D 4.4.D 2
1 (13 wt.X)(86 gpm) (19.8 atomX)
- where, The Standby Liquid Contxol System conditions must satisfy the following equation.
E Veri'fy that the equation given in Specification 3.4.D is satisfied at least once per month and within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> anytime water or boron is added to the solution.
C = sodium pentaborate solution concentration (weight percent)
Determined: by the"most, recent performance of 'the surveill'ance instruction required'y Specification 4.4.C.2.
Q = pump-flow rate (gpm)
Determined'y the most recent performance of the surveillance instruction required by Specification 4.4.A.'2.b.
E = Boron-10 enrichment
.(atom percent Boron-10)
Determined by the most recent performance of the surveillance instruction required by Specification 4 '.C.4.
1.
If Specification 3.4.A through 3.4.D cannot be met, make at least one subsystem OPERABLE within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or the reactor.
shal'1 be placed in a SHUTDOWN CONDITION 'with all OPERABLE control rods. fully inserted within the -'foll'owing 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
1.
No additional surveillance required.
BEN Unit 3 3.4/4.4-4'MENOMEÃl'5. I'9 g
41 H I