iJ
~
~
PR.I(3 R.l EY 1
ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS)
ACCESSION NQR:9410270063 DOC.DATE: 94/10/18 NOTARIZED: NO DOCKET FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, ennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, ennessee 0 000296 AUTH.NAME AUTHOR AFFXLIATION P
SALAS,P.
Tennessee Valley Auttority gQ5' fg /lf RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document C ntrol esk)
SUBJECT:
Submits requirements of 10CFR50,App E,Section V,to provide NRC w/EPXP revs:EPIP index 6 EPIP 13 Rev 5.
DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR J ENCL J SIZE:
TITLE: OR Submittal:
- Plans, Implement'g Pr cedures, C
NOTES 0
RECIPIENT XD CODE/NAME PD2-4-PD INTERNAL: 'ENTEQ 01 UDOCS"=A'BSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME WILLIAMS,J.
NRR/DRSS/PEPB NRC PDR COPIES LTTR ENCL 1
1 1
1 C
U NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE KVKSTE!CONTACT'I'I.IEDOCL'CLIENTCONTROL DESK, ROOKI P I -37 (EXT. 504-0083 ) TO F LIA!INKTE YOI.'Ri AML' ROTI DISTRIBUTIONLISTS I'OR DOCL'MEN'I'SYO!.'ON"I'lED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 7
ENCL 7
Tennessee Valley Authority, Post Office Box 2000, Decatur. Alabama 35609 October 18, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Gentleman:
In the Matter of Tennessee Valley Authority Docket Nos.
50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT - UNITS 1 2I and 3 - EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP)
REVISIONS TVA is submitting this notification in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, to provide NRC with the following EPIP revisions:
(1)
- Index, and (2)
EPIP 13 Revision 5.
The effective date of the revisions is September 20, 1994.
TVA requests that your controlled copies be updated within 30 days of the effective date as noted on the correction transmittal.
The enclosed information is being sent by certified mail.
The signed receipt signifies that you have received this information and appropriate steps will be taken to update your controlled copies, and destroy superseded material.
If you have any questions, please telephone me at (205) 729-2636.
Sincerely, o Salas Manager of Site Licensing Enclosure cc:
See page 2
94f02700b3 94fpfg PDR ADGCK pg0002g9 F
PDR fir )
U.S. Nuclear Regulatory Commission Page 2
October 18, 1994 cc (Enclosure):
NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
Mr. Mark S. Lesser, Section Chief (Enclosure-2 copies)
U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. J.
F. Williams, Project Manager (w/o Enclosure)
U.
S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852
GENERAL REVISION GENERIC FILING INSTRUCTION File Documents listed on Receipt Acknowledgement Transmittal as follows:
RENOVE INSERT
08-08-94 Proc No EHERGENCY PLAN IHPLEHENTING PROCEDURES A=Active(APPROVED)
Rev Title Status Lvl PAGE 1
EPIP-1 EPI P-2 P-3 EPI EPIP-5 EPIP-6 EPIP<<7 EPIP-8 EPI P-10 EPIP-11 E PIP-13 EPI P-14 EPIP-15 E PIP-16 EPIP-17 EPIP-19 EPIP-20 EPIP-21 18 records listed.
16 14 17 16 18 14 13 13 6
4 4
2 15 E
GENCY A
2 A
7 0
EHERGENCY PLAN CLASSIFICATION LOGIC A
NOTIFICATION OF UNUSUAL EVENT A
ALERT A
SITE AREA EHERGENCY A
GENERAL EHERGENCY A
ACTIVATION AND OPERATION OF THE A
TECHNICAL SUPPORT CENTER (TSC)
ACTIVATION AND OPERATION OF THE A
OPERATIONS SUPPORT CENTER (OSC)
PERSONNEL ACCOUNTABILITYAND A
EVACUATION HEDICAL EHERGENCY PROCEDURE A
URITY AND ACCESS CONTROL A
RAD EHICAL LABORATORY PROCEDURE A
RADIOLO AL CONTROL PROCEDURES A
EHERGENCY SURE A
DEESCALIATION RECOVERY PROCEDURE A
EHERGENCY EgUIPHE 0 SUPPLIES (INVENTORY AND OPERAB TY PROCEDURE)
COHHUNICATIONS SYSTEHS NOTIFICATION LIST PLANT DATA FIRE EHERGE ROCEDURE 0244998732 BFNP EPIP EPIP INDEXIFIL INST 080890
0,
Tennessee Valley Au ty Drowns Ferry Nuclear ant Site Director Standard Practice Form Page 1 of 1
Form SDSP-1 SDSP-2. 11 Procedure No FORH SDSP 1
PROCEDURE AND, INSTRUCTION REVIEH AND APPROVAL COVER SHEET Tracking No.
Titie (for SP use mlxl Rev. No.
~>>
~ I It, Or db es Temporary change Anti.cipated duration (date ar condition):
SP LIS pages foams.affected wa cessing.
(For TCs list marked pages):
CHECK AS APPROPRIATE:
]
New Procedure Permanent Change.
Two Year Review per 25~? ~Y Cancellation Pages reissued far pagination only:
ORIGINATOR:
(PRINl'our name)
Date Organization 4
Phone ~~~
Name of sponsibl ~ 0 iz ian RPC 5
ature
~8dt 3 Phone Oa e
Pe
~'I t
nr Plant Hanager Pro)ect Centrals 4 Financial Svcs Hgr ZZ Site Support Hanager Site Licensing Si te Programs Hanager Pro]ect Engineering (PE)
Hadificatian (HODS)
Haterials T Procurement Hanager
..(vl~
ization:
~o Organization:
ZZ Organiz tm C
Organization ZI Organi zati an:
ZI Organization:
ZZ Organization:
0 zation:
/023
'ite'Ouality Assurance Date Sit racedures Res
~ Organization Supervisar Date Principal
- ager, and Site Director, if applicable.
r'ign ll required signatures except PORC; 1
)
~ ~
~ >>o
~
Principal Hanager
- Yes,
(, ]dNo-No.
No>>
Retention Period:
Lifetime Responsibility:
OCRH 0705R
Title:
PORC. Review required PORC a rman or R
inutes Plant ager or PORC Hinutes (Required sicpature for standard practices 9',
Date except if Pnncipal Hanager is the Plant Hanager, then mark "NA" here and check Plant Hanager at bottom left.
~
~
~
~
r
~
~
rz'ite.Director (SDSPs only)
Date at Date released fram Administrative Hold (SP completes, if applicable)
Effective Date ~P ~ +J (SP completes)
Validation Date~
(SP oeepleteal
vent teak k a
A A 4
Ad's Au
. aaP
~
~
BFN EPIP13.
Page 1 of 1 HISTORY OF REVISION/REVIEW REV.
NO.
DATE REVISED PAGES REASON FOR CURRENT REVISION 0
09/25/87 ALL 10/27/87 ALL 08/27/88 1%2 New procedure, this procedure supersedes IP-25.
To correct instruction number to the radiological sampling instruction.
To correct deficiencies in the procedure which were identified during the 1988 REP dress rehersal.
REASON FOR URGENCY:
This procedure must be corrected prior to the 1988 annual REP exercise.
10/27/89 ALL Procedure change to put into correct format.
Make oranizational title changes.'dd PREAS step.
REASON FOR URGENCY:
Must be in place before exercise.
To PORC by 10/24/89.
1028v 12
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT MRGENCY PLAN IOPLBHTING PROCEDURE EPIP-13 RADIOCHEMICAL LABORATORY PROCEDURE REVISION 4 PREPARED BY:
TIMOTHY W.
CORNELIUS PHONE:
2038 RESPONSIBLE ORGANIZATION:
EMERGENCY PREPAREDNESS APPROVED BY:
J.
SCALICE DATE:
09/07/91 EFFECTIVE DATE:
09/10/91 VALIDATIONDATE: NOT REQUIRED QUALITY-RELATED
(6S3)
REVISION LOG Procedure Number:
EPIP-13 Pages Affected:
2 Description of Change:
Revision Number:
4 Procedure revised to update procedure reference upgrades.
~EV
~oo4 Page 1
BFN-EPIP-13 RADIOCHEMICAL LABORATORY PROCEDURE 1.0 PURPOSE This procedure provides guidance to Chemistry personnel during a Radiological Emergency.
2.0 SCOPE This procedure outlines the actions to be followed by Radiochemical Laboratory Analysts (RLAS) and other chemistry personnel during a radiological emergency.
This procedure describes those Radiochemical Laboratory actions required during an emergency involving radiochemical problems.
NOTE:
Shift Operations Supervisor's clerk will initiate EPIP-13 by calling the Radiochemical Laboratory Shift Supervisor.
3.0 INSTRUCTIONS 3.1 Notification of Unusual Event 3.1.1 No offsite radiochemical problems are postulated during a NOTIFICATION OF UNUSUAL EVENT.
This situation should not have any major impact on the Radiochemical Laboratory.
3.1.2 Although the lab will not automatically be called, should assistance be needed, RLAS will follow standard practices and procedures during any response work.
0254p
3.2 Alert REV 0004 Page 2
BEN-'EPIP-13 Initials Time
- s 3.2.1 Card into PREAS in the RADCON lab.
3.2.2 All RLAS report to the Radiochemical Lab Shift Supervisor.
3.2.3 Prepare to implement CI-900 Radiological Emergency Sampling and Analysis Procedures.
3.2.4 Verify proper operation of laboratory assigned survey instruments.
3.2.5 An ALERT may require the evacuation of a certain plant area and/or building.
If the lab must be evacuated, see Section 3.6.
3.3 Site Area Emergency 3.3.1 RLAS report to the Radiochemical Lab Shift Supervisor.
3.3.2 3.3.3 3.3.4 3.3.5 Prepare'o implement CI-900 Radiological Emergency Sampling and Analysis Procedures.
.p
'erify proper operation of laboratory assigned survey instruments.
I If a site evacuation is ordered, see Section 3.5.
If the Radiochemical Laboratory must be evacuated, see Section 3.6.
3.4 General Emergency 3.4.1 RLAS report to the Radiochemical Lab Shift Supervisor.
3.4.2 Prepare to implement Cl-900 Radiological Emergency and Sampling Procedures.
3.4.3 Verify proper response of laboratory assigned survey instruments.
3.4.4 If a site evacuation is ordered, see Section 3.5.
3.4.5 If the Radiochemical Laboratory must be evacuated, see Section 3.6.
503p
3.5 Site Evacuation R EV 0004 Page 3
BFN-EPIP-13 Initials Time 3.5.1 RLAS proceed to lab, if habitable report to Radiochemical Shift Supervisor.
If uninhabitable, see Section 3.6.
3.6 Radiochemical Laboratory Uninhabitable 3.6.1 Move equipment as shown in CI-1308 to establish a
laboratory at the intake at the designated area.
This area will be equipped with all the necessary gamma counting instrumentation needed to perform a minimum of radiochemistry analyses required during an emergency.
3.6.2 Report to Chemistry OSC Manager.
4.0 ATTACHMENTS None LAST PAGE 0254p