Notifies of Implementation of Commitment for Installation of Upgraded Process Computer & Enhanced Sequence of Events Recording Capability,Per Generic Ltr 83-28,Item 1.2
ML18037A558
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 11/09/1993
From: Salas P
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-GTECI-075, REF-GTECI-NI, TASK-075, TASK-75, TASK-OR GL-83-28, NUDOCS 9311160302
Download: ML18037A558 (8)


Text

=+CCEI.ERATE DOCUMENT DISTRIBVTIONSYSTEM REGULATO INFORMATION DISTRIBUTION TEM (RIDE)

ACCESS(OQ iqBR:9311160302 DOC.DATE: 93/ll/09 NOTARIZED: NO DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH.NAME AUTHOR AFFILIATION SALAS,P.

Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

D NOTES:

SUBJECT:

Notifies of implementation of commitment for installation I

of upgraded process computer 6 enhanced sequence of events recording capability.

DISTRIBUTION CODE:

A016D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Generic Ltr 90-03, Relaxation of Staff Position in GL-83-28, Item 2.2 RECIPIENT ID CODE/NAME TRIMBLE,D INTERNAL: ACRS NRR/DORS/OGCB NRR/DRPW NRR/PD11-4 OGC/HDS3 EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA E

C@FDC~

EG &I=L~

01 NSIC COPIES LTTR ENCL D

~

S D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR IS ENCL (g

D

Ol

<<V I,

Tennessee Valley Authority, Post Office Box 2000. Decatur. Alabama 35609 MOV 09 1993 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of Tennessee Valley Authority Docket No. 50-260 BROWNS FERRY NUCLEAR PLANT (BFN)

COMPLETION OF UNIT 2 COMMITMENT FOR GENERIC LETTER 83-28i ITEM 1 2 - POST-TRIP REVIEW - DATA AND INFORMATION CAPABILITY (GSI 75 / MPA B-085)

References:

1)

TVA letter to NRC, dated May 24,

1993, Completion of Commitments for Unit 2 Cycle 6

Outage and Response to Related Issues 2)

TVA letter to NRC, dated November 7, 1983 3)

NRC letter to TVA, dated June 12,

1985, Safety Evaluation for Generic Letter 83-28, Item 1.2, Post Trip Review (Data and Information Capability)

This letter notifies NRC that TVA has implemented its commitment for the installation of an upgraded process computer and an enhanced sequence of events recording capability.

At-power testing has been completed and the system declared operable.

@Ann 9322260302 932209 PDR ADOCK 05000260

.P PDR

41

U.S. Nuclear Regulatory Commission NOV 09 1993 TVA committed to provide this notification as part of the Unit 2 Cycle 6 outage completion letter (Reference 1).

TVA made this commitment in response to Generic Letter 83-28, Required Actions Based on Generic Implications of Salem ATWS

Events, Item 1.2, Post-Trip Review Data and Information Capability (Reference 2).

TVA's response was accepted in the NRC's Safety Evaluation (Reference 3).

Since the time of the original TVA submittal, the previously described upgrade to a Digital VAX 11/750 process computer system was accomplished using a Digital VAX 6000 system.

The functions previously performed by the sequence of events and time history recorder are now accomplished using the process computer system.

However,: the guidance, contained in the Generic Letter and the requirements'of the:Safety.

Evaluation 'continue to be met.

There are no commitments contained in this letter. If you have any questions, please telephone me at (205) 729-2636.

Sincere Pedro Salas Manager of Site Licensing cc:

See page 3

0

~i r

4 C.

U.S. Nuclear Regulatory Commission NOV 00 1993 Mr. R': V,.'.Crlenjak, Project Chief.

U.S. Nucl'ear Regulatory Commission.

Region, II 101 Marietta Street, NW,. Suite 2900 Atlanta, Georgia 30323 i

NRC Res'ident Inspector Browns Ferry Nuclear Plant Route 12, Box 637

Athens, Alabama "'35611 Mr. J.

F. Wi;lliams, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland

20852, Mr. D.

C. Trimble, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852

!i 4i C

A8

, ~