Notifies of Unit 2,Cycle 6 ISI of Inaccessible RHR Penetration Welds
ML18037A392
Person / Time
Site: Browns Ferry 
Issue date: 07/30/1993
From: Salas P
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9308050232
Download: ML18037A392 (6)


Text

ACCEI ERAT DOCUMENT DIST TION SYSTEM REGULAT INFORMATION DISTRIBUTION-SYSTEM (RIDS)

ACCESSIOA"NBR:9308050232 DOC.DATE: 93/07/30 NOTARIZED:

NO DOCKET FACIL:50-,260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH.NAME AUTHOR AFFILIATION SALAS,P.

Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Notifies of Unit 2,Cycle 6 ISI of inaccessible RHR penetration welds.

DISTRIBUTION CODE: 0047D COPIES RECEIVED:LTR ENCL 8 SIZE: gk TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code NOTES:

RECIPIENT ID CODE/NAME PD2-4 ROSS,T.

INTERNAL: ACRS NRR/DE/EMEB NUDOCS-ABSTRACT OGC/HDS3 RES/DSIR/EIB EXTERNAL EGGG BROWN P B NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-4-PD AEOD/DSP/ROAB NRR/EMCB OC/LFDCB E;gE~~B 01 EG&G RANSOMEPC NSIC COPIES LTTR ENCL D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

D TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL

il I

Tennessee Valley Authority, Post Office Box 2000. Decatur, Alabama 35609 JUL 30 l993 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

In the Matter of

)

Tennessee Valley Authority

)

Docket No. 50-260 BROWNS FERRY NUCLEAR PLANT (BFN)

UNIT 2 i CYCLE 6 INSERVICE INSPECTION OF THE INACCESSIBLE RESIDUAL HEAT REMOVAL (RHR)

PENETRATION WELDS

References:

1.

Letter from TVA to NRC dated August 1,

1988, BFN-Response to Generic Letter 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping dated January 25, 1988 2.

Letter from TVA to NRC dated November 25,

1992, BFN Request for NRC Approval of Alternate Methods for the Reactor Water Cleanup (RWCU) and Residual Heat Removal (RHR) Inservice Inspections Required by Generic Letter 88-01 This letter provides notification that the BFN Unit 2, Cycle 6 inservice inspections of the RHR inaccessible penetration welds are complete.

In Reference 1,

TVA made the following commitment:

During the Unit 2, Cycle 6 outage, the inaccessible welds in the RHR penetrations will either be removed, be clad with corrosion resistant material, or have local leak detection applied.

9308050232 930730 PDR ADOCK 050002h0 8

PDR

i+[

~1

U.S. Nuclear Regulatory Commission Page 2

JUL 30 1993 In a subsequent letter (Reference 2),

BFN revised its commitment as follows:

Each refueling outage, a visual inspection of the process piping'ill be made from the drywell by examining,,the surrounding area (the penetration and the inaccessible weld area)- for evidence of leakage.

This inspect'ion was performed.during the Cycle 6 outage and no leakage was detected;"

'BFN surveillance instructions (SIs) contain the procedural controls to ensure the inspections are performed during subsequent BFN Unit 2 outages.

There are no commitments containedin,this letter. If you have n

estions, please telephone.

me at (205) 729-2636.

Pedro alas Manager of Site Licensing cc:

Mr. R. V. Crlenjak, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637

Athens, Alabama 35611 Mr. Thierry M. Ross, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852.

~I Igi

~L

~

!fg

I