ACCELERATED DOCUMENT DISTRIBUTIONSYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9306020055 DOC.DATE: 93/05/20 NOTARIZED: NO DOCKET ¹ "ACIL:50-~259 Browns Ferry Nuclear 'Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH.NAME AUTHOR AFFILIATION SALAS,P.
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Responds to NRC concerns re configuration control drawings delineated in Insp Repts 50-259/93-08,50-260/93-08 50-296/93-08.Encl site bulletin issued informing site personnel of types of drawings in use at facilities.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
D RECIPIENT ID CODE/NAME PD2-4-PD WILLIAMSiJ.
INTERNAL: ACRS AEOD/DSP/TPAB t
DEDRO NRR/DRCH/HHFB NRR/DRSS/PEPB NRR/PMAS/ILPB2 OE DIR EG F~10 02 GN2 FILE Ol EXTERNAL: EG&G/BRYCEgJ.H.
NSIC COPIES LTTR ENCL 1
1 1
1 2
2 1
1 1
1 1
1.
1 1
1 1
1 1
1 1
1 1
1 1
1 1
-RECIPIENT ID CODE/NAME ROSS,T.
AEOD/DEIB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPBl NUDOCS-ABSTRACT OGC/HDS3 RES MORISSEAU,D NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 D
D
,R D
NOTE TO ALL"RIDS" RECIPIENTS:
tL PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
Tennessee Valfey Autronty, Post Ofhce Box 2000, Decatur, Alabama 35609 NAY 20 1993 U.S. Nuclear Regulatory Commission ATTN:.
Document Control Desk Washington, D.C.
20555 Gentlemen:-
In the Matter of Tennessee Valley Authority
)
Docket Nos.
50-259
)
50-260 50-29 6 BROWNS FERRY NUCLEAR PLANT (BFN)
RESPONSE
TO NRC INSPECTION REPORT (IR) 93-08, ADMINISTRATIVE DRAWING REVISIONS In IR 93-08, NRC requested that TVA respond to the concerns related to configuration control drawings (CCD) at BFN.
NRC's concerns involve the revision of CCDs under the administrative drawing change process and the reliability of the CCDs at BFN.
TVA shares NRC's concerns with respect to issues involving configuration control at BFN.
In response to these
- concerns, TVA issued a site bulletin (enclosed) informing site personnel of the types of drawings in use at BFN, including CCDs, and the processes used to revise and maintain these drawings.
TVA believes the enclosure addresses NRC's concerns and ensures plant personnel are aware of the types of drawings in use at BFN and the processes used to revise these drawings.
Should you have any questions, please telephone me at (205) 729-2636.
Sincerely, Pedro Salas Manager of Site Licensing Enclosure cc:
See page 2
P.dll7 g7 9306020055 930520 PDR ADOCK 05000259 Q
Q
~
U.S. Nuclear Regulatory Commission
~N 20 1993 Enclosure cc (Enclosure):
NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35611 Mr. Thierry M. Ross, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
I Q i
l e
o I 'I o
e
~
JF a
s 6
9
~r at'c; cecoveijrj7if'ait.j'it'ideaed spec'aticaghet" <<eA'mdetstaadjjh@PBf;'dcesias)%<++.
P.
':Wr'eject*.1atcstcactic'a'89-06'~
s)8a"0teade60oata9i>>
288
.c.~.Mt'Mk
.~J' t
~ ~,
~ c
~
6 o
8 c
~yp M t~ 's s..
'ali
\\
6 o
c s
e.
P~
o 9'j, 't
~ ~,,
4' 8
Cgpg~<gpg +p~C~QIss iP 4, '
N Y 'It>
2.
As-Constructed Drawing A drawing depicting the as-built configuration of a component, system, or structure at a point in time as indicated by the date of issue as shown 9n the revision block.
The type of drawing is annotated "as-constructed" below the.title block and may have the statement, "this drawing is under functional Configuration Control."
3.
As-Designed
{AD) Drawing - A drawing depicting the changes required to be implemented by the DCN.
1.
Equipment Management System (EMS) A computerized systemwhich contains equipment related information for the following design output documents:
Q-List, Instrument Tabulations
{the I-Tab drawings are being voided and replaced by EMS on a system-by-system basis),
Valve Tabulations (the V-Tabs have been voided and replaced by EMS), Fuse Tabulations, Environmental Qualification List.
2.
Document Control Change Management (DCCM) A computerized system used to track, control, and report status of activities for DCNs from initiation to closure.
This includes the status of change paper tracked against drawings.
l.
Updated when DCNs are processed.
2.
Revised by Administrative Changes for "documentation only" changes.
Some examples are:
- a. Incorporation of verified change paper.
- b. Correction and addition of Unique Identification Numbers (UNIDs) in EMS.
- c. Correction of drafting errors.
- d. Correction of reference, continuation, or companion drawings.
- e. Drawing unitization and incorporation, title block format changes, and color-code incorporation.
The drawing information including both drawings and unincorporated change paper
("UNC" status) is tracked in DCCM in accordance with SSP 2.8.
This information can be accessed from any mainframe terminal and should be checked prior to using a drawing.
1.
Primary, Critical, and Essential Secondary drawings are updated prior to system Return to Operation.
2.
Other secondary drawings have unincorporated change paper statused "UNC" in DCCM when the DCN is installed and verified, and drawings are updated on a priority basis.
3.
Valve tabulation information is contained in EMS.
4.
Instrument tabulation information is being transferred from drawings to EMS on a system basis.