ACCEI ERATgiQ DOCUMENT DIST UTION SYSTEM
~
'EGULATO~ INFORMATXON DISTRIBUTION STEM (RIDS)
"\\
ACCESSION NBR:9212300100 DOC.DATE: 92/12/23 NOTARIZED: YES FACX'L:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee AUTH.NAME AUTHOR AFFILIATION SCALICE,J.A.
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET N
05000260 R
SUBJECT:
Application for amend to license DPR-52,consisting of change TVA-BFN-TS-329,adding requirements for four new temp switches being added in RWCU heat exchanger room.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR t ENCL /
SIZE:
TITLE: OR Submittal: General Distribution NOTES:
'D RECIPIENT ID CODE/NAME SANDERS,M.
ROSS,T.
INTERNAL: ACRS NRR/DOEA/OTSB11 NRR/DST/SICB8H7 NUDOCS-ABSTRACT OGC/HDS3 RES/DSIR/EIB I
EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 2
2 6
6 1
1 1
1 1
1 1
0 1
1 1
1 RECIPIENT ID CODE/NAME HEBDON,F NRR/DET/ESGB NRR/DST/SELB 7E NRR/DST/SRXB 8E OC B
EG FIL 01 NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1'
1 1
1 1
D D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T HEED!
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 20
g rj rI
Tennessee Valley Authority, Post Olfice Box 2000, Decatur, Alabama 35609.2000 O. J. "Ike" Zeringue Vice President, Browns Perry Nuclear Plant December 23, 1992 TVA-BFN-TS-329 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter Of
)
Tennessee Valley Authority
)
Docket No. 50-260 BROWNS FERRY NUCLEAR PLANT (BFN) TVA BFN TECHNICAL SPECIFICATION (TS)
NO.
329 REACTOR WATER CLEANUP (RWCU)
SYSTEM TEMPERATURE SWITCHES UNIT 2 In accordance with the provisions of 10 CFR 50.4 and 50.90, we are submitting a request for an amendment (TS-329) to license DPR-52 to change the BFN TS for Unit 2 (Enclosure 1).
The proposed change for Unit 2 will add requirements for four new temperature switches being added in the RWCU Heat Exchanger Room.
A description and justification in support of the proposed change is provided as Enclosure 2.
A proposed determination of no significant hazards is provided in Enclosure 3.
We request that these specifications be made effective 30 days after issuance.
OOb 92i230Oi00 921223
'PDR ADOCK 05000260 P
U.S. Nuclear Regulatory Commission December 23, 1992 If there are any questions about these changesg please telephone G.
D. Pierce, Interim Site Licensing Manager, at (205) 729-7566.
Sincerely, Scalice Plant Manager In the absence of O.J.
Zeringue Vice President, Browns Ferry Operations Enclosures cc:
See page 3
Subscribed and sworn to before me on this~ day ofQ~ 1992.
Notary Public My. Commission Expires LD-3O 5
U. S. Nuclear Regulatory Commission December 23, 1992 cc (Enclosures):
American Nuclear Znsur'ers Town Center, Suite 300S 29 South Main Street West Hartford, Connecticut 06107-2445 Mr. Johnny Black, Chairman Limestone County Commission 310 Washington Street
- Athens, Alabama 35611 Dr. C. E. Fox State Health Officer State Department of Public Health State Office Building Montgomery, Alabama 36194 Mr. J.
E. Jones General Electric Company 735 Broad Street Suite 1108 James Building Chattanooga, Tennessee 37402 NRC Resident Znspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35611 Mr. Thierry M. Ross, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region ZZ 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
ENCLOSURE '1 PROPOSED TECHNICAL SPECIFICATION CHANGE BROWNS FERRY NUCLEAR PLANT UNIT 2 (TVA BFN TECHNICAL SPECIFICATION NO. 329)