Forwards Amend 9 to Updated FSAR for Browns Ferry Nuclear Plant.Commitments Completed in Amend 9 Include,Fsar Logic Diagrams.Diagrams Updated,As Necessary
ML18036A778
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 07/22/1992
From: Zeringue O
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18036A779 List:
References
NUDOCS 9207240212
Download: ML18036A778 (9)


Text

ACCELERATED DISTjUBUTION DEMONSTjRATION SYSTEM

~ er REGUDAT'0 INFORMAT ON DISTRIBUTIONWi'STEM (RIDE)

ACCESSiON NBR:9207240212 DOC.DATE: 92/07/22 NOTARIZED: NO DOCKET N FACIAL".50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH. NAME AUTHOR AFFILIATION ZERINGUE,O.J. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Amend 9 to updated FSAR for Browns Ferry Nuclear Plant. Commitments completed in Amend 9 include,FSAR logic diagrams. Diagrams updated, as necessary.

DISTRIBUTION CODE: A053D TITLE: OR Submittal: Updated COPIES RECEIVED:LTR PS J ENCL (50.71) and Amendments JJ SIZE:

NOTES: 8&65@ P/QPPg REClPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL SANDERS,M. 1 0 HEBDON,F 1 0 ROSS,T. 1 1 WILLIAMS,J. 1 1 INTERNAI". ACRS 2 2 AEO ~A+ B 01 1

1 1

1 NRR/DST SE2 1 0 G RGN2 1 1 EXTERNAL: IHS 1 1 NRC PDR 1 1 NSIC 1 1 SAIC ATEFI,B. 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WAFK! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISI'RIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPlES REQUIRED: LTTR 14 ENCL 11

0 Tennessee Valley Authority, Post Office Box 2000, Decatur. Alabama 35609 O. J. 'Ike'eringue Vice President, Browns Ferry Operations Jot 32 1992 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter Of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) UPDATED FINAL SAFETY ANALYSIS REPORT (UFSAR), AMENDMENT 9

Reference:

TVA letter dated July 17, 1991, Updated Final Safety Analysis Report (FSAR), Amendment 8 As required by 10 CFR 50.71, enclosed is one signed original and ten copies of Amendmen't. 9 of the BFN Updated FSAR. A list of commitments is also enclosed.

Amendment 9 is a one year update from Amendment 8 submitted in 1991.,'Significant improvements continue to be made in the clarity of-.the drawings, figures and tables. The figures contained:,~n Amendment 9 were updated consistent with TVA's configuration control process.

pvo(i v 2 92072402 05000259 PDR ADOCK PDR K

f U.S. Nuclear Regulatory Commission JUL 82 1992 TVA made three commitments in the above reference to be completed for Amendment 9. TVA has completed its review of the FSAR logic diagrams and updated as necessary. The revised logic diagrams are being submitted in Amendment 9.

The FSAR verification program has been completed. However, not all of the results of the program have been included in Amendment 9, due to an ongoing review and rewrite of Chapter 12, "Structures and Shielding", and Appendix Cg Structural Qualification of Subsystems and Components." The remainder of the FSAR verification results will be included in Amendment 10. TVA has reevaluated its commitment to label the entire Appendix C, "Structural Qualification of Subsystems and Components" as "historical". Insteadg TVA will identify in Appendix C those sections that should be considered as "historical" and will add sections reflecting the revised BFN design basis negotiated with NRC prior to the restart'of BFN unit 2. This will be completed for Amendment 10 and will provide a more comprehensive and useful document.

Enclosure 1 to this letter provides the revised TVA commitments. Enclosure 2 to this letter provides the original and 10 copies of Amendment 9 of the BFN FSAR.

I certify that I am a duly authorized officer of TVA, and that, to the best of my knowledge and belief, the information contained herein accurately presents changes made since the previous submittal, necessary to reflect information and analysis submitted to the commission or prepared pursuant to Commission requirement.

If you have any questions, contact R. R. Baron, Manager of Site Licensing, at (205) 729-7566.

Sincerely, J. Zeringue Enclosures cc: See page 3

U.S. Nuclear Regulatory Commission JOL 88 )992 Enclosures cc (Enclosures):

NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 Mr.Thierry M. Ross, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101'Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

ri ENCLOSURE 1 BROWNS FERRY NUCLEAR PLANT UPDATED FINAL SAFETY ANALYSIS REPORT AMENDMENT 9 LIST OF COMMITMENTS TVA will include the remainder of the Final Safety Analysis Report (FSAR) verification program results in Amendment 10.

TVA will identify appropriate sections of the Updated Final Safety Analysis Report Appendix C, Structural Qualification of Subsystems and Components as "historical" and add sections reflecting the revised BFN design basis negotiated with NRC prior to the restart of BFN unit 2. This item will be completed for inclusion in Amendment 10.

~ \ g ~

ENCLOSURE 2 BROWNS FERRY NUCLEAR PLANT UPDATED FINAL SAFETY ANALYSIS REPORT AMENDMENT 9 This enclosure provides the original and 10 copies of Amendment 9 of the BFN UFSAR.