ACCELERATED DILUTION DEMONS+TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM'RIDS)
ACCESSION NBR:9201300051 DOC.DATE: 92/01/24 NOTARIZED: YES FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION ZERINGUE,O.J.
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 05000259 05000260 05000296 R
SUBJECT:
Withdraws proposed TS Request 172 re operation at reduced power w/single recirculation loop in svc due to extensive time delay since initiation of request
& current operational priorities at plant.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR
( ENCL + SIZE:
TITLE: OR Submittal:
General Distribution NOTES D
RECIPIENT ID CODE/NAME SANDERS,M.
ROSS,T.
INTERNAL: ACRS NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB8H7 NUDOCS-ABSTRACT OGC/HDS 3 RES/DSIR/EIB EXTERNAL: NRC PDR COPIES LTTR ENCL 'ECIPIENT ID CODE/NAME HEBDON,F WILLIAMS,J.
NRR/DET/ECMB 7D NRR/DOEA/OTSB11 NRR/DST/SELB 7E NRR/DST/SRXB 8E OC/LFMB REG NSIC COPIES LTTR ENCL D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 26 ENCL
o
Tennessee Valley Authority, Post Off'ce Box 2000, Decatur,'Alabama 35609 O. J. 'Ike'eringue Vice President. Browns Ferry Operations JAN 34
>sgz TVA-BFN-TS-172 10 CFR 50 ~ 90 U.S. Nuclear Regulatory Commission ATTN:
Document, Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of Tennessee Valley Authority Docket Nos.
50-259 50-260 59-296 BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 WITHDRAWAL OF PROPOSED TECHNICAL SPECIFICATION CHANGE (TS) NO.
172
References:
1.
Letter from NRC to TVA dated July 12, 1984, "Single Loop Operation BFN Units 1, 2, and 3" 2.
Letter from TVA to NRC dated October 11, 1984 3.
Letter from John Hutton, Director of Nuclear Services to W. C. Bibb, Site Director, BFN dated March 12, 1986, "Status of Browns Ferry Stability Issue" By letter dated March 4, 1982, TVA submitted a proposed TS amendment, to permit operation at reduced power with a single recirculation loop in service.
Reference 1 requested TVA to provide additional information regarding intent and planned schedule for performing a single-loop test.
Also, an intent and planned schedule for submitting additional TS revisions to address stability aspects of natural circulation, single-loop and dual-loop operation was requested by Reference 1.
Reference 2 stated TVA did not intend to submit TS revisions with regard to the stability aspect of natural circulation single-loop and dual-loop operation until after TVA has evaluated the results of the single-loop operation test.
The Single-loop Stability tests were performed February 9,
- 1985, on BFN Unit 1.
Reference 3 documents the analysis of the data results.
GOL 3
'tt201300051 920124 PDR ADOCK 05000259 P
2
P.S.
Nuclear Regulatory Commission (JAN 34
)ggg Due to the extensive time delay since initiation of the proposed TS change and the-current operational priorities at BFN, TVA hereby withdraws the subject proposed TS change request.
If you have any questions,'please telephone R. R. Baron, extension
'(205) 729-7566.
Sincerely,
- 0. J. Zeringue cc:
See page 3
/+~
-i Subscribe/
and sworn to before me
,~~. on:this SR~
day of 1992.
~su
': Notary Public My Commission Expires 4 I'
II 4
il N
3 U..S. Nuclear Regulatory Commission 34 1992 cco American Nuclear Insurers Attention:
Librarian The Exchange, Suite 245 270 Farmington Avenue Farmington, Connecticut 06032 Mr. Johnny Black, Chairman Limestone County Commission 310 Washington Street
- Athens, Alabama 35611 Dr. C. E. Fox State Health Officer State Department of Public Health State Office Building Montgomery, Alabama 36194 Mr. J. E. Jones General Electric Company 735 Broad Street Suite 1108 James Building Chattanooga, Tennessee 37402 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35611 Mr. Thierry M. Ross, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
0