Enclosure - Generic Letter (GL) 2015-1 Correspondence
ML18036A104
Person / Time
Issue date: 03/28/2018
From: Margie Kotzalas
Programmatic Oversight and Regional Support Branch
To: Craig Erlanger
Division of Fuel Cycle Safety, Safeguards, and Environmental Review
Marcano J
Shared Package
ML18036A091 List:
References
GL-15-001
Download: ML18036A104 (3)


Text

Enclosure Generic Letter (GL) 2015-01 Correspondence Licensee Name Inspection Report for Temporary Inspection (TI) 2600/016 GL-2015-01

Response

Request for Supplemental Information (RSI)

RSI

Response

Staff Evaluation Closeout Inspection Report Closeout Letter Global Nuclear Fuels-Americas (GNF-A)

ML12209A276 ML15203A018 (Licensee Extension Request)

ML15222A002 (NRC RSI to Extension Request)

ML15265A315 (Licensee Response to RSI on Extension Request)

ML15268A326 (NRC Letter Approving Extension)

ML16029A143 (Licensee Response)

ML16218A255 (1st RSI)

ML17044A038 (2nd RSI)

ML17146A543 (Review of Response to 2nd RSI)

ML16258A259 (Response to 1st RSI)

ML16288A778 (Natural Phenomena Hazard Screening and Fuel Manufacturing Operation Building Evaluation)

ML17115A097 (Response to 2nd RSI)

ML16305A316 (Masonry Wall Evaluation)

ML17258B209 ML17354A197 ML17353A019 Westinghouse Electric Co.

ML12122A083 ML15239A314 (Licensee Response)

ML16005A112 ML16173A375 ML16180A423 ML16225A386 ML16251A030 (Closure Letter)

ML16188A426 (Licensee Phone Call)

ML16189A005 (Licensee Commitment)

2 Nuclear Fuel Services ML12122A186 ML15266A186 (Licensee Response)

ML15289A193 (Licensee Response)

ML15348A029 (1st RSI)

ML16327A031 (2nd RSI)

ML16172A098 (Response to 1st RSI)

ML16088A246 (Seismic Evaluation)

ML17135A193 (Response to 2nd RSI)

ML17184A048 ML17216A146 ML17222A185 BWX Technologies (B&W)

ML12121A574 ML15272A314 (Licensee Response)

ML16160A204 ML16258A338 (Response to RSI, Seismic Evaluation, Tornado Missile Evaluation)

ML16202A043 (Response to

RSI, Geotechnical
Reports, Structural Screening Checklist)

ML17087A252 ML17233A035 ML17222A540 AREVA, INC.

Richland ML12122A094 ML15295A011 (Licensee Response)

ML15266A160 (Licensee Response)

ML16036A105 ML16103A503 ML16223A687 ML16274A172 ML16277A610 Louisiana Energy Services N/A1 ML15265A033 None N/A ML16256A072 ML17128A111 ML17164A226 1 The licensee was not inspected during the initial inspection preformed under TI 2600/016 because the licensees facility was recently constructed and was required to meet the baseline design criteria from 10 CR 70.64(a).

3 Honeywell Metropolis ML12222A1632 ML15273A241 (Licensee

Response, Licensee Flooding Analysis)

None N/A None2 N/A2 ML16252A096 CB&I AREVA MOX Services N/A3 ML15252A072 (Licensee Response)

None N/A None3 N/A3 ML16251A280 American Centrifuge Lead Cascade and American Centrifuge Plant N/A4 ML15271A156 None N/A None4 N/A4 ML17187A084 AREVA Enrichment Services (AES)

N/A4 ML15266A160 (Licensee Response)

None N/A None4 N/A4 ML17187A124 Global Laser Enrichment N/A4 ML15338A039 (Licensee Response)

None N/A None4 N/A4 ML17241A064 International Isotopes, Inc.

N/A4 ML15313A047 (Licensee Response)

None N/A None4 N/A4 ML17187A188 Global Laser Enrichment N/A4 ML15338A039 None N/A None4 N/A4 ML17241A064 2 The NRC staff did not conduct inspections specific to GL-2015-01 because the results from previous natural phenomena hazards (NPH) inspections, following activities associated with Confirmatory Order (CO) NRC-2012-0244, were sufficient. The NRC staff closed GL-2015-01 for this licensee based on the results of the inspections associated with CO NRC-2012-0244 and the similarity of the licensees response to GL-2015-01 with the previously accepted NPH assessments submitted as part of the activities associated with CO NRC-2012-0244.

3 The NRC staff did not conduct inspections related to GL-2015-01 because the licensees facility remains under construction. The NRC staff closed GL-2015-01 for this licensee based on assurances from the facilitys existing construction inspection program and the similarity of the licensees response to GL-2015-01 with the previously accepted NPH assessment for initial licensing.

4 The NRC staff did not conduct inspections related to GL-2015-01 because no significant construction activities have occurred at this licensees facility. The NRC staff closed GL-2015-01 for this licensee based on the assurance that, once complete, the facility will be inspected according to NRC Inspection Manual Chapter 2694 and the similarity of the licensees response to GL-2015-01 with the previously accepted NPH assessment for initial licensing.