Responds to NRC Re Deviation Noted in Insp Repts 50-259/89-49,50-260/89-49 & 50-296/89-49.Corrective Actions: Ltr Transmitted to NRC Informing of Changes in Senior Mgt & Organization
ML18033B115
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/08/1990
From: Michael Ray
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9001120277
Download: ML18033B115 (8)


Text

~SUL hJBKN DPAhNNVkZN 9 ACCESSION NBR:9001120277 DOC.DATE: 90/01/08 NOTARIZED: NO DOCKET ACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH.NAME AUTHOR AFFILIATION Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 891207 ltr re deviation noted in Insp Repts 50-259/89-49,50-260/89-49

&, 50-296/89-49.

DISTRIBUTION CODE:

IEOID COPIES RECEIVED:LTR Q ENCL J

SIZE:

l TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response I

D NOTES:1 Copy each to: B.Wilson,D.M.Crutchfield,B.D.Liaw,S.Black R.Pierson, 1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw, R.Pierson,B.Wilson 1 Copy each to:

S. Black,D.M.Crutchfield,B.D.Liaw, R.Pierson,B.Wilson 05000259 05000260 i 05000296 D

RECIPIENT ID CODE/NAME PD INTERNAL: ACRS t

AEOD/DEIIB DEDRO NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DRIS/DIR NRR/PMAS/ILRB12

'E

.J EG FILE RGN2 FILE 01 EXTERNAL: LPDR NSIC NOTES:

COPIES

.LTTR ENCL 1

1 2

2 1

1 1

1 1

1-1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

5 5

RECIPIENT ID CODE/NAME GEARSpG AEOD AEOD/TPAD NRR SHANKMANPS NRR/DOEA DIR 11 NRR/DREP/PRPB11 NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAUPD NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 D

S R

I D

S/

D NOXE 'IO ALL 'KIDS" RECIPIBGS'IZASE HELP US 'IO BEDlDCB KLSTB!

. COHZACT 'IHE DOCGMEÃZ CDNTROL DESK LISTS PGR DOCUMEHZB YOU DCSERT NEED) 0 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 31'NCL 31

TENNESSEE VALLEYAUTHORITY CHATTANOOGA, TENNESSEE 37401 6N 38A Lookout Place JAN 08 19SO U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555

'entlemen:

)

Docket Nos.

50-259

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT <BFN) UNITS 1, 2, AND 3 NRC INSPECTION REPORT NOS. 50-259/89-49, 50-260/89-49, AND 50-296/89-49

RESPONSE

TO DEVIATION This letter provides TVA's response to the deviation transmitted by letter from Bruce Wilson to Oliver D. Kingsley, Jr.

dated December 7,

1989.

The report cited TVA with a deviation for failure to notify NRC at the earliest possible time of TVA senior management changes as committed in TVA's Nuclear Performance, Plan (NPP)

Volume 1, Revision 6.

Enclosed is TVA's response to the deviation.

No new commitments are identified'n this submittal, As discussed in the enclosure, TVA believes. the original need for this requirement no longer exists and we request NRC approval for discontinuing the formal notification of senior management changes.

If you have any questions, please telephone Patrick P. Carier, BFN, at (205) 729-3570.

Very truly yours, TENNESSEE VALLEY AUTHORITY o~

Hanageir, Nuclear (Licensing and Regulatory Affairs Enclosure cc:

See page 2

.0 9001120277, 900108 PDR ADOCN: 05000259 8,.

PNU An Equal Opportunity Employer

U.S. Nuclear Regulatory Commission

'JAN 08 1990 cc (Enclosure):

Ms.

S.

C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II.

101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637

Athens, Alabama 35609-2000

0,

ENCLOSURE

RESPONSE

NRC INSPECTION REPORT NOS. 50-259/89-49, 50-260/89-49, AND 50-296/89-49 LETTER FROM BRUCE WILSON TO OLIVER D.

KINGSLEY, JR.

DATED DECEMBER 7, 1989 DEVIATION 259 260 296/89-49-02 NUREG-1232, Volume 1, Safety Evaluation Report on Tennessee Valley Authority:

Revised Corporate Nuclear Performance Plan, July 1987, stated that "TVA was requested to notify the NRC at least 30 days before making any permanent change in their organization or permanent replacement of senior managers."

The Revised Corporate Nuclear Performance

Plan, Volume I, Revision 6, states in Section III, A.l, that it is not always possible to notify the NRC at least thirty days prior to a permanent change in senior management but TVA will keep the NRC advised of changes at the earliest possible time.

Senior Managers include the Chairman, Nuclear Safety Review Board and the Manager of Nuclear Training.

Contrary to the above, on October 23,

1989, TVA appointed a new NSRB Chairman; and in early November 1989; a replacement was named for the departed Manager of Nuclear Training.

Both of these senior management changes were made without formal or informal notification of the NRC either before or within a reasonable time after the changes.

TVA's senior management changes without notification of the NRC at the earliest possible time are considered a

Deviation from NPP, Volume I commitments to the NRC.

RESPONSE

TO DEVIATION Reason For Deviation The reason for the deviation was a failure of TVA to implement a commitment made in an October 16, 1987 submittal from S.

A. White to James G. Keppler and subsequently included in Revision 6 to the Corporate Nuclear Performance Plan.

Corrective Ste s Which Have Been Taken On November 20,

1989, a letter was transmitted from O.

D. Kingsley, Jr, to Dennis M. Crutchfield informing NRC of changes in senior management and organization.

Among these changes were the replacements of the Nuclear Safety Review Board Chairman and the Manager of Nuclear Training.

In addition, this November 20, 1989 submittal provided an updated list of Nuclear Power Senior Managers.

When NRC requested, in their July 1987 Safety Evaluation Report, that they be notified before TVA made permanent changes in the organization or permanent replacement of senior managers, including Site Directors, many of the TVA senior managers were loaned employees.

Additionally, TVA was still in the process of implementing programmatic and organizational changes as committed in the revised Corporate Nuclear Performance

Plan, Volume l.

Since that time, significant changes have been made in the organization structure and TVA no longer has loaned senior managers.

TVA has also submitted to NRC the Nuclear Power Organization Description topical report for approval.

This topical report will be revised as necessary to reflect major organizational changes and at least annually in accordance with the requirements of 10 CFR 50.71.

The original need for notifying NRC of senior management and organization changes no longer exists, and with NRC approval, TVA will therefore begin to function as other utilities and discontinue the formal notification of these changes.

Date When Corrective Actions Will Be Com leted No further corrective actions are necessary.