ML18033B025
| ML18033B025 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 10/31/1989 |
| From: | Michael Ray TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8911090007 | |
| Download: ML18033B025 (6) | |
Text
ACCELERATED DISTRIBUTION DEMONSTFMTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
~
~
CESSION NBR:8911090007
,DOC.DATE: 89/10/31 NOTARIZED: NO DOCKET ACIL:50-259 Browns Ferry Nuclear Power Station,.Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH.NAME
'UTHOR AFFILIATION RAY,M.J.
Tennessee Valley -Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Responds to violations noted in Insp Repts 50-259,260 296/89-28 re commitment to replace fire wall..
DISTRIBUTION CODE:
IEOID COPIES RECEIVED:LTR
(
ENCL L SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:1 Copy each to: B.Wilson,D.M.Crutchfield,B.D.Liaw,S.Black R.Pierson, 1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw,
.R.Pierson,B.Wilson 1 Copy each to:
S. Black,D.M.Crutchfield,B.D.Liaw, R.Pierson,B.Wilson 05000259 05000260 05000296 RECIPIENT ID. CODE/NAME PD RNAL: ACRS AEOD/DEIIB DEDRO NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB 10 NRR/PMAS/ILRB12 B
N,J 02 RGN2 FILE 01 EXTERNAL: LPDR NSIC NOTES:
COPIES LTTR ENCL 1
1 2.
2 1
1 1
1 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 5
5 RECIPIENT ID CODE/NAME GEARS,G AEOD AEOD/TPAD NRR SHANKMAN,S NRR/DLPQ/PEB NRR/DREP/EPB
- 10 NRR/DRIS/DIR NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAUiD NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
-1 1
1 1
1 1
1 1.
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US 10 REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 3%79'O ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
'OTAL NUMBER OF COPIES REQUIRED:
LTTR 31 ENCL 31
l
e TENNESSEE VALLEYAUTHORITY CHATTANOOGA, TENNESSEE 37aot 5N 1578 Lookout Place 00T 31 569 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Hashington, D.C.
20555 Gentlemen:
In the Matter of Tennessee Valley Authority Docket No. 50-260
.the walls separating the battery, battery board and DC equipment rooms for each Unit (Fire Areas 17, 18 and
- 19) from the control building (Fire Area 16) do not appear to meet the required fire rating.
These walls are 20 gauge sheet metal panels with a resin-impregnated kraft paper honeycomb core that has been covered. with 5/8" fire code type gypsum board on each side of the panels.
The combustible core'of these panels reduces the fire resistance rating of the panels to an unacceptable level.
TVA has agreed to install additional layers of gypsum wall board on the corridor side of the wall panels.
This modification would increase the fire resistance rating of these walls.
The NRC inspection team determined that this modification would be acceptable.
Because of the lo<< fuel loading, existing detection and existing suppression in the affected
- areas, the inspection team also determined that the actual physical modification would not have to be completed until the end of the next refueling outage for Unit 2.
TVA will, however, be required to commit to modification of the existing walls, and to propose additional compensatory measu'res to be maintained until the modification is completed.
The formal commitment to modify the wall and proposal of compensatory measures will be required before unit 2 restart.
This item is identified as Unresolved Item 50-259/89-28-01, 50-260/89-28-01 and 50-296/89-28-01."
)
BROHNS FERRY NUCLEAR PLANT (BFN)
COMMITMENT TO REPLACE FIRE HALL This letter will satisfy unresolved item 50-259/89-28-01, 50-260/89-28-01, and 50-296/89-28-01 as identified in NRC Inspection Report 50-259/89-28, 50-260/89-28, 50-296/89-28.
NRC Inspection Report 89-28 stated:
This situation was identified to NRC in telephone calls to NRC prior to the inspection.
TVA has evaluated this situation and has determined it will be advantageous to implement the modification before restart rather than use compensatory measures.
TVA will add additional layers of gypsum wall board on the corridor side of the wall panels prior to restart of Unit 2.
This modification will achieve a
one hour fire rating for the wall which will provide adequate compartmentation in accordance with the BFN Fire Hazards Analysis.
The completion of this mcdification will satisfy the unresolved item contained in NRC Inspection Repo~ t 89-28.
Tne comi itment contained in this letter is listed in the enclosure.
R~~g ~A~~ar.'>'>7
~~:~ilr>"~J I="i!h ADOb,-':0.:)02. g U
PIC An Equal Opportunity Employer
U.S. Nuclear Regulatory Commission o~T Bi SSS If you have any questions, please telephone Patrick P. Carier at (205) 729-3570.
P Very truly yours, TENNESSEE VALLEY AUTHORITY cc (Enclosure):,
Ms.
S:
C. Black, Assistant Director for Projects TVA Projects Division U.S.
Nuclear Regulatory Commission One White Flint, Nor.th 11555 Rockville Pike Rockville, Maryland 20852 Mr.
B. A. Wilson, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35609-2000 I
y Manag,r, Nucl ar. Licens ing and Regu1 a tory Affairs
ENCLOSURE Browns Ferry Nuclear Plant Appendix R Fire Nail Commitment Contained in Letter TVA will add additional layers of gypsum wall board on the corridor 'side of the wall panels prior to restart of Unit 2.