gc t:<~RATH)
DlSTR1BUTJ 05 DE)d 04 STKKT10N sYFTEM S
05000259 NOTES:1 Copy each to: B.Wilson,D.M.Crutchfield,B.D.Liaw,S.Black R.Pierson, 1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw, R.Pierson,B..Wilson 1 Copy each to:
S. Black,D.M.Crutchfield,B.D.Liaw, R.Pierson,B.Wilson 05000260 05000296 D
tt REGULATORY INFORMATION DISTRXBUTXON SYSTEM (RIDS)
ACCESSION NBR:8910030142 DOC ~ DATE: 89/09/25 NOTARIZED-NO DOCKET CIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH.NAME AUTHOR AFFILIATION MEDFORD,M.O.
- Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATXON Document Control Branch (Document Control Desk)
SUBJECT:
Responds to NRC 890824 ltr re violations noted in Insp Repts 50-259/89-33,50-260/89-33 8 50-296/89-33.Corrective actions:
DISTRIBUTION CODE:
ZEOZD COPIES RECEIVED:LTR g ENCL g SIZE:
TITLE: General (50 Dkt)-Znsp Rept/Notice of Violation Response RECIPIENT ID CODE/NAME PD COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME GEARSPG COPIES LTTR ENCL 1
1 EXTERNAL:
NOTES:
ACRS AEOD/DEIIB DEDRO NRR/DEST DIR NRR/DOEA DXR 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT OGC/HDS2 RES MORXSSEAUPD LPDR NSIC 2
2 1
1 1
1 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 5
5 NUZE XO ALL RIDS" RZCIPIEÃIS:
AEOD AEOD/TPAD NRR SHANKMANPS NRR/DLPQ/PEB NRR/DREP/EPB 10 NRR/PMAS/XLRB12 QEMIEB RMAN,J REG ILE 02 GN~
E Ol NRC PDR 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 R
I 5
S h
D D
S PXZASE HELP US XO RECCE %ASTER CCNTACX'HE DOCUMENT CGNXBDL DESK RXH P1-37 (EXT. 20079)
%0 EIZMQCGR YOUR MME PKN DISTRIBUTION LISTS MR DOCRtENIB YOU DOHPT NEED)
TOTAL NUMBER OF COPIES REQUIRED: LTTR 30 ENCL 30
0
TENNESSEE VALLEYAUTHORITY CHATTANOOGA. TENNESSEE 37401 6N 38A Lookout Place SEP 25 'l888 U.S. Nuclear Regulatory Comm) ssion ATTN:
Document Control Desk Hashington, D.C.
20555 Gentlemen:
In the Hatter of Tennessee Valley Authority Docket Nos.
50-259 50-260 50-296 BROHNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 NRC INSPECTION REPORT NOS. 50-259/89-33, 50-260/89-33, AND 50-269/89 RESPONSE TO NOTICE OF VIOLATION This letter provides TVA's response to the notice of violation transmitted by letter from B. A. Nilson to O.
D. Kingsley, Jr.
dated August 24, 1989.
The report cited TVA=with two violations.
The first violation had two examples for failure to comply with procedures during the performance and review of a Surveillance Instruction (SI).
TVA admitted the first example of the violation; however, TVA denied the second example since it was performed within the required timeframe.
TVA admitted to the second violation.
The fact that TVA is denying one example of the violation cited for failure to follow procedures should not be construed as a
TVA lack of concern in that area.
The denial is based on very specific details as noted in the attached response.
TVA shares the NRC concerns and has been working to correct the problem.
A meeting is currently scheduled for September 28, 1989 between TVA and NRC representatives to brief NRC on the status of procedures in general.
Enclosure 1 provides background information and TVA's response to the violations in the subject report.
All corrective actions wi 11 be performed by October 15, 1989 and are listed in Enclosure 2.
If you have any questions, please telephone Patrick P. Carier, BFN, at (205) 729-3570.
Enclosures Very truly yours, TENNESSEE VALLEY AUTKORITY Hark 0. Hedford, Vice President and Nuclear Technical Director
/got 8910030142. 890925 PDR ADOCK 050002S9 6
PNU An Equal Opportunity Employer
~
~
U.S. Nuclear Regulatory Commission Enclosures cc (Enclosures):
Ms. S.
C. Black, Assistant Director for Pro]ects TVA Pro)ects Division U.S. Nuclear Regulatory Commission One white Flint, North 11555 Rockvi lie Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NN, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35609-2000
ENCLOSURE 1
RESPONSE
NRC INSPECTION REPORT NOS. 50-259/89-33, 50-260/89-33, AND 50-296/89-33 LETTER FROM B. A. WILSON TO O.
D. KINGSLEY, JR.
DATED AUGUST 24, 1989 Violation A TS 6.8.l.lc requires that written procedures be established, implemented and maintained covering surveillance and test activities for safety related equipment.
Site Directors Standard Practice (SDSP)
- 2. 1, "Site Procedures and Instructions," requi'res that the site be operated and maintained in accordance with written, approved procedures and instructions which have been formally issued and distributed for use.
Contrary to the above, on July 14, 1989, during the performance of procedure 3-SI-4.5.C.1(2),
EECW Pump Operation Surveillance Instruction for the "Dl" emergency equipment cooling water (EECW) pump and during the subsequent SI review process, procedures were not properly implemented as follows:
1.
Complete vibration data as required by step 7.13.24 was not taken and the vibration acceptance criteria (step 7.13.25) were signed off as being written within the specific limits.
Admission or Denial of the Alle ed Violations TVA admits the violation for this example.
Reason for the Violation (or Findin ) if Admitted During the performance of 3-SI-4.5.C.1(2),
an operator inadvertently initialed step 7.13.25 which noted that the displacement vibration acceptance criteria was within limits on the "Dl" EECW pump.
Velocity vibration data was recorded;
- however, the velocity vibration baseline had not been established by the BFN inservice testing program.
Step 7.13.25 was initialed due to a personnel error when the operator who initialed step 7.13.25 was provided with misinformation from a mechanical test technician who didn't clearly know the vibration baseline status of the Dl EECW pumps.
In a letter from S. Black to O.
D. Kingsley, Jr.
dated Hay 19,
- 1989, relief was 'provided to BFN for changing vibration requirements from the displacement vibration amplitude to a velocity vibration amplitude method.
The "Dl" pump has two dedicated modes.
The "Dl" pump can be used as a residual heat removal service water (RHRSW) pump or as an EECW pump.
Since the valve alignment is different for these
- modes, the "Dl" pump has two separate Surveillance Instructions (SIs) performed on this pump before declaring it operable by the BFN inservice testing program.
Enclosure l Page 2
The "Dl" pump has an establish velocity vibration ampl1tude baseline for the RHRSH mode.
In the EECH mode, the new baseline had not been established.
The mechanical test technician prov1ded the wrong baseline status for the tested mode.
Therefore, only the velocity vibration amplitude readings were recorded in step 7.13.24.
Corrective Ste s Which Have Been Taken and Results Achieved The completed SI was reviewed and the deficiency was noted during a technical rev1ew on July 20, 1989.
At this t1me, the pump was declared inoperable.
The cognizant engineer requested that the SI be repeated since no credit was taken for American Society of Mechanical EngineersSection XI performance as the required displacement vibration reading was not taken.
The retest confirmed that the "Dl" EECH pump did meet the displacement vibration amplitude acceptance criteria and was declared operable on July 20, 1989.
This violation is the result of personnel error.
The situation has been d1scussed with the operator who incorrectly initialed the noted step and he was counseled w1th regard to signing off acceptance criteria with data missing.
Corrective Ste s Which Will Be Taken to Avoid Further Violations (or
~Find1n s)
No further corrective actions are required.
Date When Full Com liance Hill Be Achieved Full compliance has been achieved.
A complete analysis of the SI data was not performed within four working days of the test as required by step 3.7.
Test data review was not completed until six,days following the test.
Admission or Denial of the Alle ed Violation TVA denies this example.
Reasons for the Denial of This Exam le Step 3.7 of 3-SI-4.5.C.l(2) does require pump parameters to be reviewed after each test to verify that the acceptance criteria is met.
Additionally, step 3.7 requires a complete analysis of the test data must be performed by Mechanical Test Section within four working days of the test.
The initial SI was performed on July l4, 1989, and the complete analysis was performed on July 20, 1989.
I c$
l Enclosure 1
Page 3
Although six calendar days had passed between the time the test was completed and the analysis was performed, only four working days had elapsed.
July 14, 1989 was on a Friday, while July 20, 1989 was the following Thursday.
During this 'timeframe, July 15 and 16 should not have been counted as work days since the normal work week for the Mechanical Section is Monday through Friday.
Therefore, personnel in this section are not normally assigned to work on Saturday or Sunday.
These days should have not been counted against the four working day criteria.
Corrective Ste s Which Have Been Taken and Results Achieved No further corrective actions are required.
Corrective Ste s Which.Will Be Taken to Avoid Further Violations (or
~Findtn s)
No further corrective actions are required.
Date When Full Com liance Will Be Achieved I ~
Full compliance has been achieved.
Violation B TS 3.11.G.l.a requires that compensatory measures be established within one hour when fire rated assemblies are rendered inoperabTe; Fire Protection Plan procedure FPP-2, Revision 3, Fire Protection-Attachments, implements in part TS 3.11.G.l.a and requires the preparation and processing of Attachment F, Fire Protection Equipment and Barrier Penetration Removal From Service Permit prior to impairment of the fire-rated assembly.
Contrary to the above, on August 8, 1989, the NRC inspector, while on tour, identified two fire rated doors, numbers 607 and 455 wedged open.
Neither door had an Attachment F in effect and the Shift Operations Supervisor (SOS) was not aware of the condition.
Neither door had compensatory measures in effect.
Admission or Denial of the Alle ed Violation TVA admits the violation.
P'
~
0
Enclosure 1
Page 4
Reason For the Violation (or Findin s) if Admitted Both doors were breached as noted by the NRC inspector without the issuance of Fire FPP-2, Revision 3, Attachment F.
Step 5.4 requires a
fire protection and barrier penetration removal from service permit.
Step 5.3 requires the SOS to approve the removal of a fire door from service.
Additionally, step 5.6 requires compensatory measures to be made for alterations to the plant fire protection systems.
Each door incident is depicted below:
Door 455 At approximately 4:30 p.m.
on August 6, 1989, a roving Fire Natch had begun an hourly tour through his assigned area.
He noted that door 455 was closed.
At 5:00 p.m. the NRC inspector found the same door without a door knob and with a wedge holding it open.
The individual who opened this door was not observed and their identify is unknown.
At that time, the door knob was most likely broken and the door was left open without notifying the SOS, obtaining an Attachment F, or employing any compensatory measures.
Door 607 Door 607 was breached without proper documentation because of failure to follow procedures.
The foreman was knowledgeable of the Administrative Control process for removing fire protection systems-from service.
He intended to have the electricians set up the welding unit and run the leads to the door, without breaching the door.
However, the door was breached before his return with an approved permit.
Because of the foreman's failure to adequately communicate work instructions and the electricians failure to follow site Fire Protection procedures, the door was breached without an approved permit.
Breaching fire doors are covered in General Employee Training (GET) which is required training/retraining for all site employees.
Corrective Ste s Which Have Been Taken and Results Achieved Door 455 After the NRC inspector notified the
- SOS, the SOS contacted the Fire Protection Emergency Service Technician (EST) foreman requesting assistance from Fire Protection in investigating/resolving the problem(s) with this door.
Two ESTs were dispatche'd to investigate/resolve the problem(s).
Upon their arrival, the ESTs found door 455 breached with the knob removed.
A brief search was conducted for the knob, and the knob was found on top of a nearby emergency light cabinet.
The SOS arrived within a few minutes and assisted the ESTs in the replacement of the knob.
The wedge was then
- removed, allowing the door to close and latch.
The SOS and ESTs functionally verified that the door was operating properly.
0
Enclosure 1
Page 5
Door 607 A roving fire watch noted that door 607 was breached by welding leads and directed the electricians to place the door in a safe position.
This notification served to satisfy FPP-2, step 6.4.13 which allows the fire watch to place the door in a safe position without notifying the shift operations supervisor.
Nithin three minutes the electricians had removed the welding leads and secured the door.
At approximately 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br /> the Modification's foreman initiated Attachment F 89-0626 to support work activities.
Attachment F 89-0626 was issued in compliance with the position that Fire Protection maintains door 607 as a fire rated assembly.
Fire Protection's administrative control program requires an hourly roving fire watch when door 607 is-removed from service.
The SOS log indicates that Attachment F 89-0626 on door 607 was approved at 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br />.
Modifications took appropriate corrective action with the craft personnel involved in the unauthorized breach of door 607.
Modifica-tions reviewed the incident investigation on this event (Root Cause Analysis (RCA) 89-64) during weekly safety meetings.
Corrective Ste s Nhich Hill Be Taken to Avoid Further Violations (or
~F3 nd t n s >
Maintenance Support (fire watches) will review-their responsibilities pertaining to identification and proper reporting of problems encountered during roving fire watch tours by October 15, 1989.
Fire Protection will review the past maintenance history of all technical specifications doors in relationship to recurring hardware problems and developed a corrective action program by October 15, 1989.
Fire Protection will review RCA 89-64 during weekly safety meetings by October 15, 1989.
Maintenance Support (fire watches) will review RCA 89-64 during weekly safety meetings by October 15, 1989.
Date Nhen Full Com liance Nill Be Achieved Full compliance will be achieved by November 15, 1989.
0 0
ENCLOSURE 2
RESPONSE
NRC INSPECTION REPORT NOS. 50-259/89-33, 50-260/89-33, AND 50-296/89-33 LETTER FROM B. A.
WILSON TO 0.
D. KINGSLEY, JR.
DATED AUGUST 24, 1989 1.
Maintenance Support (fire watches) will review their responsibilities pertaining to identification and proper reporting of problems encountered during roving fire watch tours by October 15, 1989.
2.
Fire Protection will review the past maintenance history of all technical specifications doors in relationship to re-occurring hardware problems and developed a corrective action program by October 15, 1989.
3.
Fire Protection will review Root Cause Analysis 89-64 during weekly safety meetings by October 15, 1989.
4.
Maintenance Support (fire watches) will review Root Cause Analysis 89-64 during weekly safety meetings by October 15, 1989.
I