ACCELERATED DIPlBUTI ON DEMONSTRJON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8909050282 DOC.DATE: 89/08/25 NOTARIZED: NO FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee AUTH.NAME AUTHOR AFFILIATION RAY,M.J.
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Submits restart schedule.
DISTRIBUTION CODE:
IEZSD COPIES RECEIVED:LTR 2 ENCL 0 SIZE:
TITLE: Startup Report/Refueling Report (per Tech Specs)
NOTES:1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw, R.Pierson,B.Wilson DOCKET g
05000260 05000260 RECIPIENT ID CODE/NAME SIMMS,M GEARS,G INTERNAL: ACRS NRR CHATTERTON RGN2/DRSS/EPRPB EXTERNAL: LPDR NSIC NOTES COPIES LTTR ENCL RECIPIENT COPIES ID CODE/NAME LTTR ENCL PD 1
IRM TECH ADV NUDOCS-ABSTRACT RGN2 FILE 01 NRC PDR h
h TOTAL NUMBER OF COPIES REQUIRED:
LTTR 23 ENCL
TENNESSEE VALLEYAUTHORITY CHA'TTANOOOGA. TENNESSEE 37401 5N 157B Lookout Place AU8 S5 N~
U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT (BFN) RESTART SCHEDULE Docket No.
50-2CO In order to assist the staff in planning and scheduling the resources required to resolve all outstanding issues and perform all required inspections, TVA is submitting the BFN Unit 2 restart schedule.
Physical work on systems required to support start-up is expected to be completed at the end of the first quarter of calendar year (CY) 1990.
Criticality is expected in the middle of the second quarter of CY 1990.
There are no commitments contained in this letter.
If you have any questions, please telephone Patrick P. Carier at (205) 729-3570.
Very truly yours, TENNESSEE VALLEY AUTHORITY cc:
Ms.
S.
C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockvi lie, Maryland 20852 Mr. B. A. Wilson, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35609-2000 Manage/f, Nuclea Li ensing and Regulatory Affairs An Equal Opportunity Employer Ip
ACCELERATED D1~BUTlON DEMONSTR/30N SYSTEM r
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8909050282 DOC.DATE: 89/08/25 NOTARIZED: NO FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee AUTH.NAME AUTHOR AFFILIATION RAY,M.J.
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Submits restart schedule.
DISTRIBUTION CODE: IE26D COPIES RECEIVED:LTR 2 ENCL 0 SIZE:
TITLE: Startup Report/Refueling Report (per Tech Specs~
NOTES:1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw, R.Pierson,B.Wilson DOCKET g 05000260 D
05000260 RECIPIENT ID CODE/NAME SIMMS,M GEARS,G INTERNAL: ACRS NRR CHATTERTON 02 RGN2 DRSS P~
EXTERNAL: LPDR NSIC NOTES COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD IRM TECH ADV NUDOCS-ABSTRACT RGN2 FILE 01 NRC PDR COPIES LTTR ENCL
.R TOTAL NUMBER OF COPIES REQUIRED:
LTTR 23 ENCL
TENNESSEE VALLEYAUTHORITY CHATTANOOGA. TENNESSEE 37401 SN 157B Lookout Place AU8 RS $88 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT (BFN) RESTART SCHEDULE Docket No. 50-260 In order to assist the staff in planning and scheduling the resources required to'e'solve all outstanding issues and perform all required inspections, TVA is submitting the BFN Unit 2 restart schedule.
Physical work on systems required to support start-up is expected to be completed at the end of the first quarter of calendar year (CY) 1990.
Criticality is expected in the middle of the second quarter of CY 1990.
There are no commitments contained in thi.s letter. If you have any questions, please telephone Patrick P. Carier at (205) 729-3570.
Very-truly yours, TENNESSEE VALLEY AUTHORITY cc:
Ms.
S.
C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35609-2000 Manag
, Nuclear'i ensing and Regulatory Affairs Syj);=>(i~iC12~'2 I.DR AltCtCK p
i"4<)'v~
~
cy=,or)cia/it."i 1"-'DC.