ML18033A898
| ML18033A898 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 08/17/1989 |
| From: | Michael Ray TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8908240088 | |
| Download: ML18033A898 (5) | |
Text
ACCELEBRATED D1S'HGBUT106 BEMOAN'IRk'l'lua REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
A('ON NBR:8908240088 DOC.DATE: 89/08/17 NOTARIZED: NO DOCKET 1
- 50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH NAME AUTHOR AFFILIATION RAY,M.
Tennessee Valley Authority RECIP.NAME RECIPXENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Documents agreement for extension on due date for revising SDSP 7.9, "Integrated Schedule
& Work Control."
C3 TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:1 Copy each to: B.Wilson,D.M.Crutchfield,B.D.Liaw,S.Black R.Pierson, 1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw, R.Pierson,B.Wilson 1 Copy each to: S. Black,D.M.Crutchfield,B.D.Liaw, R.Pierson,B.Wilson 05000259 i 05000260 <
05000296 D
RECIPIENT ID CODE/NAME PD INT AL: ACRS AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DLPQ/PEB NRR/DREP/EPB 10 NRR/PMAS/ILRB12 OE LXEBERMAN,J RG 01 EXTERNAL: LPDR NSIC NOTES:
COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
5 5
RECIPIENT ID CODE/NAME GEARS,G AEOD AEOD/TPAD LOIS,ERASMIA NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAUgD NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 2
2 1
1 1
1 1
1 h
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 31 ENCL 31
0'
TENNESSEE VALLEYAUTHORITY CHATTANOOGA. TENNESSEE 3'7401 5N 157B Lookout Place AUG 17II U.S.
Nuclear Regulatory Comm) ssion ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of Tennessee Valley Authority Docket Nos.
50-259 50-260 50-296 BROWNS FERRY'UCL'EAR PLANT (BFN) UNITS 1, 2, AND 3 NRC INSPECTION REPORT NOS 50-259/89-11, 50-260/89-11, AND 50-296/89 SITE DIRECTOR STANDARD PRACTICE (SDSP) 7.9 This letter is to document the agreement for an extension on the due date for t
revising SDSP 7.9, "Integrated Schedule and Work Control."
The revision to SDSP 7.9 is needed to improve the use of the impact evaluation sheet for. any maintenance or modification on technical specification equipment.
Additional changes to SDSP 7.9 were identified during the revision process.
Based on the extent of these
- changes, SDSP 7.9 originally scheduled for August 1, 1989 was revised on August 15, 1989.
This extension was discussed and agreed to with W. S. Little of your staff on August 1, 1989.
Please refer any questions to Patrick P. Carier at BFN, (205) 729-3570.
Very truly yours, TENNESSEE VALLEY AUTHORITY cc:
See page 2
Manage ucl a
Licensing and egulatory Affairs S90S240088 890e~7 PbR ADQCK 0 0002 9
9 PDC
~ An Equal Opportunity Employer
U.S. Nuclear Regulatory Commission cc:
Ms.
S.
C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockvi lie, Maryland 20852 Mr. B. A. Wilson, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35609-2000