Text
~ AC(.P~~~
DISTRIBUTION DEMONSTRATION SYSTEM REGULA'2 INFORMATION DISTRIBUTIO~YSTEM l(RIDS)
ACCESSION NBR)8908150153 DOC.DATE: 89/03/31 NOTARIZED': NO DOCKET ¹ FACIL:50-296 Browns Ferry Nuclear, Power Station, Unit 3, Tennessee 05000296 AUTH.NAME-AUTHOR AFFILIATION RATLIFF,S.A.
Tennessee Valley Authority RECIP.NAME RECIPIENT. AFFILIATION
SUBJECT:
Monthly operating rept for Mar 1989 for Browns Ferry Unit 3.
DISTRIBUTION CODE:,IE24D COPIES RECEIVED:LTR 0 ENCL i
SIZE:
3 TITLE: Monthly Operating Report (per Tech Specs)
NOTES:1 Copy each to:
S. Black,D..M.Crutchfield,B.D.Liaw, R.Pierson,B.Wilson D
05000296 S
RECIPIENT ID CODE/NAME SIMMS,M GEARS,G INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10 NRR RPB 10 E~Kv 01 COPIES LTTR ENCL
.3 1
10 1
1 1
1 RECIPIENT ID CODE/NAME PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 COPIES.
LTTR ENCL h
EXTERNAL: EGSrG'IMPSON,F NRC PDR NOTES:
LPDR NSIC h
NOPE IO ALL 'KIDS" MKXPIEPls:
PIZASE HELP US TO REDUCE KLSTE!
CGNZACT 'IHE DOCGMEÃI'ONTROL DESK, KXM Pl-37 (EXT. 20079) K) El'ZKQQGR YOUR NAME FR% DISTRIBUTION LISTS PGR DOCX2KHZS Y0U'ONFT NEEDf TOTAL NUMBER OF COPTER REQUIRED:
LTTR P
ENCL 34
L h~~
a ~
i I
1 OPERATING DATA REPORT DOCKET NO.
DATE PREE ARED BY TELEPHONE t
I r
1 I
OP RAVING STATUS l.
U it:Name:
BROWNS FERRY UNIT THREE 2.
R odting period:MARCH, 1989 3.
L censed Thermal 'Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe):
1152 5.
Dg ign Electric Rating (Net MWe):
1065 6.
Mafxigum Dependable Capacity (Gross MWe): 1098.4-7.
Mgxiatum Dependable Capacity (Net MWe): 1065
- 8. Ig Changes Occur in Capacity Ratings (Items Number 3
Through 7) Since Last. Report, Give Reason:
N/A 9.
Power Level To which Restricted, If Any (Net, MWe): N/A 10.
Reason For Restrictions, If Any: N/A 50~296 j MARCH 89 S.A.RATLIFF 205-729-2937 11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Hd Hg R
G urs In Reporting Period urg Reactor Was Critical actor Reserve. Shutdown Hours ur4 Generator On Line it Reserve Shutdown Hours os Thermal Generation (MWh)
Gzfoss Electric Generation (MWh)
Ngt glectric Generation (MWh) 5ut4owns Scheduled Over Next 6 Mont LtType, Date, and Duration of Each):
U it,Service Factor U it'Availability Factor U it.'Capacity Factor (MDC Net)
Unit capacity Factor (DER Net)
Unit'Forced Outage Rate S
h THIS MONTH 744, 0 0.0 0.0 0.0 0.0 0.0 0.0
-1590 0
0
~ 0 0.0 0.0 0.0 100.0 YEAR-TO DATE 2160 0
0 0
0 0
0
-5023 0.0 0.0 0.0 0.0 100.0 CUMULATIVE 132240 45306 5150 44%95 0
131868267 43473760 41895064 33.4 33.4 29.7 29.7 61.7 25.
l If] Shut Down At End Of Reporting Period, t,'9081501 53 890331 PDR ADQCK. 05000296 R
PNU
41-
'E la
%I
~
4
~I It p
WQg! j Q Ql gt
"'.iI
AVERAGE DAILY UNIT POWER L DOCKET NO.
Unit MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1S 19 20 21 22 23 10 26 27 12 28 13 29 14 30 15
-2 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MHe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
(9/77) 0002R Fp rV'gC
il-4k r'
I >>
11 II P
4"