ML18033A820
| ML18033A820 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 07/05/1989 |
| From: | Michael Ray TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8907110291 | |
| Download: ML18033A820 (10) | |
Text
A(;CKLERATM SISAL &IHUiiV~
17KMU45 IRK l10%
SY~Eg REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) d
, ACCESSION NBR:8907110291 DOC.DATE: 89/07/05 NOTARIZED: NO FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee
. 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION RAYgM.J.
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET N
05000259 05000260 05000296
SUBJECT:
Responds to NRC 890522 ltr re violations noted in Insp Repts 50-259/89-11,50-260/89-11 6 50-296/89-11.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR L ENCL M SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:1 Copy each to: B.Wilson,D.M.Crutchfield,B.D.'Liaw,S.Black R.Pierson, 1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw, R.Pierson,B.Wilson 1 Copy each to: -S. Black,D.M.Crutchfield,B.D.Liaw, R.Pierson,B.Wilson 05000259 05000260 05000296 D
RECIPIENT ID CODE/NAME PD COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME GEARSgG COPIES LTTR ENCL 1
1 RES MOR EXTERNAL: LPDR NSIC INTERNAL: ACRS AEOD/DEIIB DEDRO NRR/DEST DIR NRR/DOEA DIR 11.
NRR/DREP/RPB 10 NUDOCS-ABSTRACT OGC/HDS2 ISSEAU,D 2
2 1
1 1
1 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 AEOD AEOD/TPAD NRR SHANKMANiS NRR/DLPQ/PEB NRR/DREP/EPB 10 NRR/PMAS/ILRB12 ABBE MAN,J' L
02 RGN2 FILE 01 NRC. PDR 1,
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 R
NOTES:
S/
NOTE M ALL RIDS" KXIPZERIS:
PIZASE HELP US K) REDUCE RESTE!
CGHI'ACI'IHE IXXX3MENI'>L DESK1 RXN Pl-37 (EXT. 20079)
XO EIZHIMQR YOUR MNE PBCH DISTRIHOTIGN LISTS FOR DOCQKNI'S YOU DON'T NEZDf D
S TOTAL NUMBER OF COPIES REQUIRED:
LTTR 30 ENCL 30
0
TENNESSEE YALLEYAUTHORITY CHATTANOOGA. TENNESSEE 37401 5N 1578 Lookout Place JUL 05 1S89 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Nashington, D.C.
20555 Gentlemen:
In the Hatter of Tennessee Valley Authorit'y Docket Nos.
50-259 50-260 50-296 BRONNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 NRC INSPECTION REPORT NOS. 259/89-11, 50-260/89-11, AND 50-296/89 RESPONSE TO NOTICE OF VIOLATION - TECHNICAL SPECIFICATIONS 3,2.A AND 4.6.B.l.c This 'letter provides TVA's response to the notice of violation transmitted in the subject report.
The report was sent from Bruce A. Ni lson to Oliver D. Kingsley, Jr. dated May 22,
- 1989, and cited TVA with two violations inv'olving two instances of failure to satisfy compensatory actions required by technical specifications when equipment was not operable.
The enclosed information responds to NRC concerns regarding deficiencies in the planning,
- review, and implementation of maintenance activities, and in evaluating the impact of those activities on operability requirements.
On June 21,
- 1989, a telephone call was made to william S. Little of your staff to extend the due date of this response from dune 21, 1989 to July 5, 1989.
Enclosure 1 provides TVA's violation response.
A list of commitments is provided in enclosure 2.
If you have any questions, please telephone Patrick P. Carier, BFN, at (205) 729-3570.
Very truly yours, TENNESSEE VALLEY AUTHORITY
~r M na r, Aucle rf Licensing and Regulatory Affairs Enclosures cc:
See page 2
t 8907> >0~
F'DR ADO~
> 8907Og
~K OSOOOZS PIVV An Equai Opportunity Employer
U.S. Nuclear Regulatory Commission cc (Enclosures):
Ms. S.
C. Black, Assistant Director
, for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockvi lie, Maryland 20852 Mr. B. A. Wilson, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35609-2000
Enclosure 1
RESPONSE
NRC INSPECTION REPORT NOS. 50-259/89-11, 50-260/89-11, AND 50-296/89-11 LETTER FROM B. A. HILSON TO O.
D.
KINGSLEY, JR.
DATED MAY 22, 1989 Violation A Technical Specification 3.2.A, Table 3.2.A, note G requires that the Reactor Building be isolated and the Standby Gas Treatment system be started when the Instrument Channel which provides the "Reactor Building Ventilation High Radiation-Reactor Zone" function is inoperable.
Contrary to the above, for the periods of February 25, 1989, at 6:05 p.m., to February 26, 1989, at 8:17 a.m.,
and February 26, 1989, at 8:50 a.m., to February 28, 1989, at 10:20 a.m.,
the Unit 1 Reactor Zone Exhaust Radiation Monitor (channel A) was inoperable and the required compensatory actions were not in place..
TVA's Res onse Admission or Denial of the Alle ed Violation TVA admits the violation.
Reason for the Violation The violation occurred as a result of a failure to identify and track technical specification (TS) required equipment that would be made inoperable during the performance of maintenance or modification.
Consequently, the compensatory actions which had been in effect were not maintained as required.
Had the radiation monitor been properly identified as.inoperable, compensatory actions would have been initiated and continued until postmaintenance testing was completed, and the equipment was declared operable.
The cause of the failure is personnel error.
Instrument maintenance personnel failed to follow the procedure in that the the troubleshooting Maintenance Request (MR) was not revised or returned for further review before repair work was performed on the monitor.
Other contributing factors included inadequate communications between the Senior Reactor Operator (SRO) and the instrument maintenance personnel performing the troubleshooting activity.
From these communications, the SRO believed that the troubleshooting work would not make the monitor inoperable.
Corrective Ste s Hhich Have Been Taken and Results Achieved Upon discovery by a utility maintenance engineer that postmaintenance testing of the unit 1 reactor zone exhaust radiation monitor had not been completed,
. the compensatory actions required by the TS were taken.
These actions included isolation of the reactor building and actuation of the standby gas treatment and control room emergency ventilation systems.
Postmaintenance testing on the radiation monitor was completed on March 1, 1989 at 1:50 p.m.,
and the monitor was declared operable.
Instrument maintenance and operations personnel have been provided a
description of this event to emphasize the need for thorough and precise communication.
The instrument maintenance personnel involved were counseled on the importance of adherence to procedures.
Appropriate plant procedures have been revised to clarify requirements on troubleshooting MRs to require revision before repair on all safety-related equipment.
This was a licensee identified violation. It was reported to NRC on March 30,
- 1989, by Licensee Event Report (LER) 259/89006.
In addition to the corrective action in the
- LER, BFN has reviewed the activities required to be performed before maintenance is allowed on TS required equipment.
TS equipment undergoing maintenance or modifications is brought to the attention of the Shift Operations Supervisor (SOS) or his representative on shift for review of impact on operations.
The SOS personally decides on equipment operability/
inoperability.
The SOS also ensures that the Shift Technical Advisor (STA) tracks all inoperable equipment/systems which result in a limiting condition for operation (LCO) on the LCO tracking -.list.
Corrective Ste s Which Hill Be Taken to Avoid Further Violations After reviewing this and other related
- events, BFN upper management has determined that more comprehensive pre-analysis of maintenance activities involving TS required equipment is needed.
Site Director Standard Practice (SDSP)-7.9, "Integrated Schedule and Work Control," will be revised to ensure positive communication and acknowledgement for required compensatory actions and LCO tracking.
SDSP-7.9 currently requires an impact evaluation sheet for any maintenance or modification on TS required equipments
- However, BFN will upgrade the impact evaluation sheet to require the SOS or his designee to specifically determine the effect of the work on operability of TS required equipment and sign this determination.
If TS equipment operability is affected, the impact evaluation sheet will further require STA verification that the item has been added to
, LCO tracking, as appropriate.
In addition, the SOS will acknowledge on the impact evaluation sheet that post maintenance/modification testing is adequate to exit the LCO and has been completed'efore cessation of any compensatory ac'tions.
The LCO tracking procedure will be revised to require acknowledgment for each shift by the responsible individual for the completion or continuation of compensatory actions, attesting that these actions are satisfactory.
Date When Full Com liance Hill Be Achieved SDSP-7.9 will be revised by August 1, 1989, to provide for appropriate STA and SOS signature acknowledgment on the impact evaluation sheet for any maintenance or modification on TS equipment.
The LCO tracking procedure will also be revised by August 1,
1989, to require acknowledgment for each shift by the individual responsible for the completion or continuation of appropriate compensatory
- actions, Violation B Technical Specification 4.6.B.l.c, requires that a sample of reactor coolant be analyzed at least every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> when the continuous conductivity monitor is inoperable.
Contrary to the above, on March 6,
- 1989, the continuous conductivity monitor
'was made inoperable at 9:15 a.m.,
and a reactor coolant sample was not taken and analyzed until March 7, 1989, at 6:15 a.m.
Admission or Denial of the Alle ed Violation TVA admits the violation.,
Reason for the Violation This violation occurred as a result of procedural deficiencies in SDSP-7.9..
This SDSP states that an impact evaluation sheet is not required for chemical instrument work that has no control function on the equipment that it is monitoring or any other equipment other than alarm function only.
Since the continuous conductivity monitor had no control function, an impact evaluation sheet was not completed.
Other contributing factors included inadequate communications between the Assistant Shift Operations Supervisor (ASOS) and instrument technicians performing the HR on the monitor, The ASOS did not have full knowledge of the actions that were going to be taken by the instrument technicians during the.
calibration.
Even though attachments from Instrument Maintenance Special Instruction (IMSI)-3014 were part of the MR package allowing the instrument maintenance technicians to remove the monitor, the ASOS did not recognize this.
In addition, attachment 1 of IMSI-3014 requires the use of stickers or markings in the control room when instrument accuracy is questionable or removed from service, but the instrument maintenance technic,ians did not utilize this portion of the IMSI-3014 in the performance of their work.
Corrective Ste s Nhich Have Been Taken and Results Achieved An analysis on the reactor coolant water was performed on March 7, 1989 at 6:15 a.m.
'The results were 0.32 micromhos/centimeter, which is well within the TS requirements of <10 micromhos/centimeter.
The ASOS has been counseled on attention to detail in the performance of his duties.
The instrument technicians have been instructed to follow the work control form, Attachment 1 of IHSI-3014, as written, especially in notifying the SOS when equipment is being made inoperable.
This was a licensee identified violation. It was reported to NRC on April 5,
- 1989, by LER 296/89002.
In addition to the corrective action in the
- LER, BFN has reviewed the activities required to be performed before maintenance is allowed on TS required equipment.
TS equipment undergoing maintenance or modifications is brought to the attention of the SOS or his representative
on shift for review of impact on operations.
The SOS personally decides on equipment operability/inoperability.
The SOS also ensures that the STA tracks all inoperable equipment/systems which result in a LCO on the LCO tracking list.
Corrective Ste s Which Will Be Taken to Avoid Further Violations Same as Violation A Date When Full Com liance Will Be Achieved Same as Violation A
ENCLOSURE 2
RESPONSE
NRC INSPECTION REPORT NOS. 50-259/89-11, 50-260/89-11, AND 50-296/89-11.
LETTER FROM B. A. HILSON TO 0.
D. KINGSLEY, JR.
DATED MAY 22, 1988 LIST OF COMMITMENTS Site Director Standard Practice 7.9 will be revised by August 1, 1989, to provide for appropriate Shift Technical Advisor and Shift Operations Supervisor signature acknowledgment on the impact evaluation sheet for any maintenance or modification on TS equipment.
The limiting condition for operation tracking procedure will be revise'd by August 1, 1989, to require acknowledgment for each shift by the individual responsible for the completion or continuation of appropriate compensatory action