,ACCELERATED DIQKBUTJO.I DEMONS~TIOY, SYSI'Eg II REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8905240329 DOC.DATE: 89/05/17 NOTARIZED: NO FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee AUTH.NAME AUTHOR AFFILIATION RAY,M.J.
-Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET N
05000260 D
05000260 S NOTES:1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw,
.R.Pierson,B.Wilson
SUBJECT:
Documents status of readiness for restart insps.
DISTRIBUTION CODE:
A047D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: Inservice Inspection/Testing/Relief from ASME Code RECIPIENT ID CODE/NAME SIMMS,M GEARS,G
'INTERNAL: ACRS NRR/DEST/MEB 9H NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: EGGG BROWN,B LPDR NRC PDR NOTES:
COPIES LTTR ENCL 1
0 1
1 6
6 1
1 1
1 1
0 1
1 1
1 1
1 1
1 5
5 RECIPIENT ID CODE/NAME PD AEOD/DSP/TPAB NRR/DEST/MTB 9H OC LFMB EG6G ROCKHOLD1 H NL 007 HEMMING NSIC COPIES LTTR ENCL 5
5 1
1 1
1 1
0 1
1 1
1 1
1 1
1 NOTE LO ALL "RIDS" RECIPIENIS'LEASE HELP US 10 REDUCE HASTE'OPZACT '%HE DOCUMENI'ONSOL DESK, RCCM Pl-37 (EXT. 20079)
%0 EZJ2hZKATE YOUR NAME PKR DIEHKEPZION LZSTS FOR DOCUMENTS YOU DON'T NEED)
D S
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 32 ENCL 29
1 t
TENNESSEE VALLEYAUTHORITY CHATTANOOGA. TENNESSEE 37401 5N 157B Lookout Place U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Hashington, D.C.
20555 Gentlemen:
In the Matter of Tennessee Valley Authority Docket No. 50-260 BRONNS FERRY NUCLEAR PLANT (BFN) SCHEDULE FOR MAJOR INSPECTIONS FOR UNIT 2 RESTART TVA representatives met with members of the NRC staff on April 27,
- 1989, in the Rockvi lie office.
The purpose of the meeting was for TVA to give NRC an assessment of BFN readiness to restart.
One of the agenda items discussed was the schedule for restart inspections.
This letter documents the status of readiness for restart inspections.
As discussed with the staff, the inspections fall in the following categories:
l.
Ongoing Inspections:
There were five inspections in progress at the time of the meeting (see enclosure).
The seismic structural and the Review of GE reactor vessel calculations inspections are now comple'te.
2.
Firm Date Inspections:
There are 17 inspections that TVA is in a position to support on the current scheduled NRC inspection date.
From this list, the Appendix R safe shutdown inspection and the QA verification Inspections are now complete.
Management and organization and tra'ining verification inspections have begun on schedule.
3.
Schedule Dependent and Under Review:
There are 15 inspections that TVA is in the process of developing a firm schedule for the completion of the prerequisites.
TVA will be ready to meet with the NRC staff to discuss the schedule for these inspections during the week of May 29, 1989.
The NRC staff and TVA have agreed on the scope of most of the remaining 33 team inspections to be performed at BFN prior to restart.
BFN is completing inspection plans and action item punchlists to track audit preparations.
TVA will periodically meet with the NRC staff to review our progress relative to the restart inspection schedule.
8905i7 R
PDOC PDC 0524032~
05000260 An Equal Opportunity Employer o4/
l~
)
U,S. Nuclear Regulatory Commission If you have any questions, please telephone Patrick P. Carier, at (205) 729-3570.
Very truly yours, TENNESSEE VALLEY AUTHORITY
Enclosure:
cc (Enclosure):
Ms.
S.
C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35609-2000 Manag
, NucleaY L censing and Regulatory Affairs
V EA
~
.fJ
)
I 4 V BFN U2C5 NRC RESTART INSPECTIONS HRC INSPECTION PREREGUI SITES PREREQ CONPL DATE INSPECTION NRC DATE t
1989 I
I I
I I
A.
ONGOING SEISNIC STRUCI'URAL INSPECTION - SAN JOSE REVIEM OF GE REACTOR VESSEL CALCS INSPECTION RESTART TEST PROGRAN
<PHASE Il REVIEM)
ENPLOYEE CONCERNS INSPECTION OLD & NEM PROGRANS NAttAGENEN'I EFFECTIVENESS OPEN ISSUES CONPLETED NONE CONPLETE PDS ISS'STABLE ORG CHRIS&PER N/A READY 4/24 4/27-28 ON GOING ON GOING ON GOING B.
FIRN DATE SAFETY SYSTEN QUALITY EVALUATION (Vertical Slice) 0 APPENDIX R SAFE SHUTDOMN INSPECTION FIRE PROTECTION IHSPECI'ION 79-02/14 PRE-RESTART FINAL INSPECTION CIVIL CALCS FOLLOM UP NAlttTENANCE PERFORNANCE BASED TEAN INSPECTION 8
NAIHTENANCE FOLLOWUP INSPECTIOH DESIGN CONTROL IttSPECTIOM 0
ECP SPECIAL INSPECTION - 0?ERATIONS QA VERIFICATIOH INSPECTIOH QUALITY ASSURANCE PROGRAN NANAGENEttT & ORGANIZATION INSPECTION ENERGENCY PREPAREDNESS INSPECTION FULL PARTICIPATIOH REP EXERCISE TRAINIHG VERIFICATION OPERATOR EXAN (GROUP 4)
POST ACCREDITATION BY NRR IIHPO)
SYS 18s23,74,75s&82 ESS CONP DESIGN CONPI NODS
> 90X NODS ESSENTIALLY COttPLETE CLOSE OPEN ITENS 20X CONPLETE ESSENTIAL CALCS CONPLEI'E NONE CLOSE OPEN ITENS ATMS NOD CONPsFL CONPsEA AUD NONE NONE FUEL LOADED,'A TOPICAL It)PL CORRECT 88-30 DEFICIENCIES DEttO EFFECTIVE CONNUNICATIOMS NODS 95X COMP 6/89 READY READY READY 5/89 N/A 5/89 5/89 6/11-23 5/1 7/17 8/14 5/15 7/10&7/24 8/14 5/22 5/1 4/10
& 5/8 6/26-7/10 I
5/8-19 1
9/11 a 5/31&11/1-2 5/8-19 7/10-21 6/5 C,
SCHEDULE DEPENDENT POMER ASCENSION TEST PROGRAM INSPECTION ENVIRON)iENTAL QUALIFICAT ION INSPECT IOtt ANPACITYs CABLE SEPARATION/INSTALLATION, DG, ETC'LECTRICAI.
ISSUE FOLLOMUP ILRI'YDRO OPERATIONAL READINESS INSPECTION RESTART ASSESSNENT INSPECTIOH SYSTEN ALIGNNEHT It)SPECTIOH STARTUP MORK CONPLETE EQ CERTIFICATION LETTER 90X CONPLETE DESIGN CONPLETE CLOSE OPEN ITENS PER SCHEDULE PER SCHEDULE 20 DAYS BEFORE RESTART 20 DAYS BEFORE RESTART FINAL SYS ALIGNNENT 8/89 4/89 8/5/89 8/13/89 9/8 8/21 6/26 7/31 8/5 8/13 8/28 8/14 8/28 D,
UNDER REVIEM ENERGEHCY OPERATING PROCEDURES INSPECTION PROCURENENT/PIECE PARTS INSPECTIOtt SURVEILLAttCE It(STRUCTIOM ADEQUACY & SYSTENS ENGG TECH SPEC ADEQUACY INSPECTION - PART I TECH SPEC PART ll INSPECTION APPENDIX R SAFE SHUTDOMH FOLLOHUP CLOSE OUT OPEN II'ENS FUEL LOAD SYS COMP TVA READY & PROCEDURES READY BFtt VERIFICATION DBVP DISC
& DESIGN EVAL CONP TS CHANGES SENT IN CLOSE OPEN ITENS 7/89 7/21/89 6/89 6/15/89 8/28 7/24-8/3 6/5-9 6/5 7/10 TBD