ML18033A482

From kanterella
Jump to navigation Jump to search
Forwards Licensee Joint Audit Rept BFK88901, Sys Preoperability Checklist & Sys Plant Acceptance Evaluation Programs & Results of Engineering Assurance Oversight of Sys Plant Acceptance Evaluation
ML18033A482
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 12/16/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18033A484 List:
References
NUDOCS 8812210199
Download: ML18033A482 (5)


Text

1

...'P,',. GENE RATED DI SQGBUTI ON DEM ONSTRyII ON SYSI'Eg REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION'BR: 8812210199 DOC. DATE: 88/12/16 NOTARIZED: NO DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station., Unit 2, Tennessee g'5000260 AUTH. NAME AUTHOR AFFILIATION GRIDLEY,R- Tennessee Valley Authority.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forw'ards Joint Audit Rept BFK88901, "Sys Preoperability Checklist 6 Sys Plant Acceptance Evaluation Programs."

DISTRIBUTION CODE: D030D COPIES RECEIVED:LTR I ENCL t SIZE:

TITLE: TVA Facilities Routine Correspondence NOTES:1 Copy each to: S.Black, J.G.Partlow, S.Richardson 05000260 B.D.Llaw,F.McCoy.

RECIPIENT COPIES 'ECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL SIMMS,M 1 1 PD ,1 1 GEARS,G 1 -

1 INTERNAL: ACRS 1 1 ADM/LFMB 1 0 NU OC RACT 1 1 OGC/HDS2 1 0 E F 01 1 1 EXTERNAL: LPDR NSIC 1

1 i1 NRC PDR 1 1 NOTES: 5 5 S

h D

MIX 'lO ALL "RIDS" RECIPZEFIS:

S PLEASE HELP US 'IO iEZOCE WASTE! CXRVACZ 'IHE DOCUMENT CXRHR3L DESK, RCCM Pl-37 (EXT. 20079) KO XZZK2QTH YOUR NAME FROH DISTRIKITIGN LISTS H)R DOCUMENIS YOU DGN~T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 14 n

/( ~

~

.P' TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 t

5N 157B Lookout Place OKS 16 't988 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of Docket No. 50-260 Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT (BFN) INDEPENDENT REVIEW OF SYSTEM PREOPERABILITY CHECKLIST (SPOC) AND SYSTEM PLANT ACCEPTANCE EVALUATION (SPAE) PROGRAMS On September 13, 1988, a meeting was held between NRC and TVA regarding unit 2 fuel load. It was agreed that TVA would provide the results of an independent review of the BFN SPOC and SPAE programs. This audit was performed under the direction of TVA's Engineering Assurance (EA) and Nuclear Quality Assurance (NQA) from October 5 to November 1, 1988. The scope of the audit was structured around the site implementing procedures and.,instructions. associated with the SPOC and SPAE programs. It was designed to independently verify the adequacy of program products and inputs, and assess effectiveness in accomplishing fuel load and restart objectives. The TVA Audit Report is enclosed.

The audit team concluded the SPOC and SPAE programs provide a systematic method to ensure open work items and technical issues that could affect system operability are evaluated and dispositioned before a system is declared operable. Subject to satisfactory completion of corrective actions to resolve the findings of this audit, implementation of the SPOC and SPAE programs will result in appropriate resolution of technical issues and in systems meeting operability requirements. The audit findings identified six Conditions Adverse to Quality Reports (CAQRs), eight Problem Reporting Documents (PRDs),

and six areas of improvement (enclosure 1).

NQA monitoring of the SPOC process remains in effect to provide assurance that the process will continue to be effectively implemented. EA has completed its oversight of the SPAE process and the results are contained in enclosure 2.

8812210199 88121'>

PDR ADOCK 05000260 P PDC An Equal Opportunity Employer

U.S. Nuclear Regulatory Commission 688 >S mrs Please note the BFN Site Quality Surveillance (QS) section had already begun monitoring the SPOC process and has maintained an ongoing SPOC verification program in parallel with the NQA and EA audit. As of November 10, 1988, a total of 26 systems had been monitored by BFN's QS section.. By utilizing the graded approach concept, the remaining 14 systems, are being monitored, in ranges of 10 percent to 100 percent. Enclosure 3 provides additional detailed information of the results of the QS ongoing review.

This submittal meets the requirements of the NRC Meeting Summary dated September 29, 1988, to docket the results of an independent review of the SPOC/SPAE process. No commitments are contained herein, however TVA will continue to follow up and close out the audit findings in accordance with our QA program.

If you have any questions, please telephone Patrick P. Carier at .

(205) 729-3570.

Very truly yours, TENNESSEE VALLEY AUTHORITY R. G idley,, nager Nuclear Li:ce sing and Regulatory Affairs Enclosures cc (Enclosures):

Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. F. R. McCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000