ACCElZRATED DISCI'RIBUTION DEMONSTRATION SYFI'Ejd REGULRT(
INFORMATION DISTRZBUTION+ZSTEM (RIDE)
ACCESSION NBR:8811030079 DOC.DATE: 88/10/28 NOTARIZED:
NO DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH.NAME 'UTHOR AFFILIATION GRIDLEY.R.
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILiATION Document Control Branch (Document Control Desk)
SUBJECT:
Responds to SC Black 881017 ltr to SA White,re submittals from TVA needed to support NRC Unit 2 restart decisions.
DISTRIBUT10N CODE:
D030D COPIES RECEIVED:LTR
/ ENCL j
SIZE:
TITLE: TVA Facilities Routine Correspondence NOTES:1 Copy each to: S.Black, J.G.Partlow, S.Richardson B.D.Liaw,F.McCoy.
05000260 RECIPIENT ID CODE/NAME SIMMSFM GEARS,G INTERNAL: ACRS CS-QB TRACT REG F
01 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD ADM/LFMB OGC/HDS2 COPIES LTTR ENCL 1
1 1
0 1
0 EXTERNAL: LPDR NSIC NOTES:
1 1
1 1
5 5
NRC PDR 1
1 R
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL 14
0 r
~
~
TENNESSEE VALLEYAUTHORITY CHATTANOOGA. TENNESSEE 37401 5N 157B Lookout Place U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of Tennessee Valley Authority Docket No.
50-260 BROWNS FERRY NUCLEAR PLANT (BFN) RESPONSE TO LIST OF SUBMITTALS NEEDED FROM TVA TO SUPPORT RESTART This letter is in response to your letter from S.
C. Black to S. A. White, dated October 17,
- 1988, which provided a list of the submittals which the NRC staff needed from TVA to support NRC decisions regarding unit 2 restart.
This list contained several submittals whose completion dates were considered by TVA to be regulatory commitments.
TVA committed to these submittal completion dates in a letter from R. Gridley to NRC, dated October 7, 1988.
This letter also contained some submittals whose completion dates were based on discussions between BFN Site Licensing and the NRC's Project Manager.
Enclosure 1 to this letter provides the staff with actual'ubmi'tta'1 dates or a committed completion date for all submittals discussed in the staff's letter.
New committed submittal dates are annotated.
This enclosure reflects the status of the submittals as of October 26, 1988.
As a matter of standard working practice, TVA wi 11 continue to verbally provide the staff with internal target completion dates for all submittals as a courtesy to assist in the planning and scheduling of the manpower required to review and resolve these issues.
TVA will provide formal commitments for submittal completion dates on the docket, when requested.
Please refer any questions regarding this submittal to Patrick Carier,
- Manager, BFN Site Licensing, (205) 729-3570.
Very truly yours, TENNESSEE VALLEY AUTHORITY R.
ri y, Manager Nuclea Licensing d
Regulatory Affairs Enclosures cc:
See page 2
aei COaoO>9 aaiOaa PDR ADQCK 0500026 A
EQual opportunity Employe
U.S. Nuclear Regulatory Commission cc (Enclosures):
Ms.
S.
C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One Nhite Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. F.
R.
McCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NH, Suite 2900 Atlanta, Georgia 30323 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35611
4 Dl J
ENCLOSURE 1
LISTING OF SUBMITTALS AND COMMITTED COMPLETION DATES SUBMITTAL COMPLETION DATE COMMENTS Instrument Sensing Lines Nuclear Performance Plan (NPP)
Description of Commitment List NPP Site Management Organization NPP Operational Readiness Program NPP Introduction and Programmatic Corrections IE Bulletins 79-02 and 79-14 Program Fuel Inspection and Reconstitution Summary Report to Support Reload NPP Plant Surveillance Program I
NUREG-0737, Item I.D.1.2 Detailed Control Room Design Review Summary Report 10/19/88 A
10/24/88 A
10/24/88 A
10/24/88 A
10/24/88 A
11/10/88 C
10/26/88 A
10/24/88 A
11/11/88 Was included with NPP description of commitment list submittal..
Has included with NPP description of commitment list submittal.
Was included with NPP description of commitment list submittal.
Additional time required to confirm program status and complete. milestone as'socfated with submittal.
Has included with NPP description of commitment list submittal.
A Denotes actual submittal date C Denotes nevi commitment date
ENCLOSURE 1
(CONTINUED)
LISTING OF SUBMITTALS AND COMMITTED COMPLETION DATES SUBMITTAL COMPLETION DATE COMMENTS 10 CFR 50, Appendix R Revised Submittal of Alternate Safe Shutdown 11/21/88 N111 be included with the readiness for Appendix R
audit submittal.
Readiness for Appendix R Audit Equipment Qualification Certification Letter 11/21/88 2/28/89 A Denotes actual submittal date C Denotes new commitment date
0 r l