4 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8811010240 DOC.DATE: 88/09/30 NOTARIZED: NO DOCKET g

FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station,,Unit 3, Tennessee 05000296 AUTH.NAME AUTHOR AFFILIATION SCHMIERBACH,M.

Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

~ Discharge monitoring rept for Sept 1988.

DISTRIBUTION CODE:

IEZSD COPIES RECEIVED:LTR OENCL /

SIZE:

TITLE: Environmental Monitoring Rept (per Tech Specs)

NOTES:1 Copy each to: F.McCoy,J.G.Partlow, S.Richardson,S.Black

,B.D.Llaw.

';1,'Copy each to: S!Black,';G.Partlow,".,S:Richardson

'B.D.Llaw,F.McCoy'.

1 Copy each to: S. Black, J.G.Partlow,S.Richardson B.D.Llaw,F.McCoy.

R j'9 D

05000259, 05000260 Ijl 05000296 A

RECIPIENT ID CODE/NAME SIMMS,M GEARS,G INTERNAL: ACRS ARM TECH ADV NBB DRBPp4R 10 EG 01 2

FILE 02 EXTERNAL: EGGG SIMPSON,F NRC PDR NOTES:

COPIES L TR ENCL 0

5 1

1 2

1 1

2 1

5

't RECIPIENT ID CODE/NAME PD AEOD/DSP/TPAB NRR/DEST/ADE 8H NUDOCS-ABSTRACT RES/DSR DEPY RGN2/DRSS/EPRPB LPDR COPIES LTTR ENCL

~,

't D

R D

8 NOTE K) ALL nRIDSii RECIPI1&IS PIZASE HELP US TO REDUCE KATE! ~CI'IHE DOQ3MEÃZ CXÃZROL DESK ROOM Pl-37 (EÃZ. 20079) K) ZXZtKNATE YOUR NAME FMH DISTRIBUTION LISTS K)R DOCtlMERZS YOU DGNIT NEED) tt 8

TOTAL NUMBER OF COPIES REQUIRED:

LTTR ~

ENCL 26 A..;t 8

,l II ll 4

k k

~

~

~

~

RRilRRR%RE KEM~R%~~

EHS~KE~R 8~%KKilWKR5%

lKCRRRRZMRRE%

~IREEÃ%~

~85%%8~

~8R%%%%~

RIP%%K%~

KISSER'~

R%R%%%%%%%

KRRSRE%~

K4%%%E%~

EIE%%Ã4~~

EBRRH~

~E%%Ã%~~

SIESSR%~MRSM MR%%%%%3I~

RlRSER%~

EH'%%%~

IHKKEE%~

KID%%%%~

EklÃ89%8~

EHKKRÃ%~

88k5~~%N3%%

6%k%iR%~

gQ~c~~

88%8%%%~

RlÃ%~~~

HBKE%Ã1~

KIRK%Ã%~

~Q-.'gg+Qg=%+

HHRSRÃ%~

RQK%%%8~

SIR%%5~

KX~~K&%%K%%

~ggc+~

EK%

RUINER

~ ~

~

~

4

~

~ l

< ~

~ ~ ~

W

~ ~ ~

r I

~

~

o ~

C ~

~

~

~ I

~ ~

~

\\

i p 4

< )~r

/

r ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 102 Sedimentation Pond PARAM MAX UNITS FLOW i988 pH MIN. 6. 0 9.0 scum 08(G

'15 20 m /l TSS 30 100 m /I NPDES 0 AL0022080 COMMENTS FREQ.

1/RELEASE 1/RELEASE 1/RELEASE 2/RELEASE POND OUT OF SERVICE FOR REPAIR 11-2-87.

10 12 13 14 17 18 20 21 22 23 24 25 26 27 28 30 MAX MIN TOTAL NO DISCHARGE I certify under penalty of law that thi s document and all attachments were prepared under Che di recti on or supervision in accordance with a system desi gned to assure Chat qualified personnel properly gather and eval uate the information submi Cted.

Based on my inquiry of the person-or persons who manage Che system, or those persons directly responsible for gathering the information~

Che information submi Cted is, Co Che best of my knowledge and belief, true~ accurate, and complete.

I am aware Chat Chere are signi ficant penalties for submi tting false information, including the possibility of fine and imprisonment for knowi ng violati ons.

Signature of Responsible Official Bate:

~

~

P I

>t pi

.I

~

~

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BRONNS FERRY NUCLEAR PLANT DSN 103 Unit 1,2,3 Turbine Station Sump PARAM AVG UNITS FREQ.

FLOW 1/MEEK 15 20 m /l j/MEEK TSS 30 100 m /I 1/MEEK NPDES 0 AL0022080 COMMENTS

0. 121000 5

10 10 O. 06OOOO 12 13 14 16 17 18 0.124000 10 REPLICATES 08(G <5 TSS 9 20

, 21

,"'2 23 0.054000 25 26 28 30 MAX 0.086400 0.124000 0.089080 5

I certi fy under penalty of law that this document and all attachments vere prepared under the direction or supervision in accordance with a system designed Co assure Chat qualified personnel properly gather and eval uate the information submitted.

Based on my inquiry, of the person or persons who manage Che system, or those persons di rectl y responsible for gathering the information, the i nformation submi Cted is, to Che besC of my knowledge and belief~ true~ accurate~

and complete.

I am aware that Chere are signi ficant penalties for submitting false information, including the possibili ty of fine and imprisonment for knox>i ng violati ons.

Signature of Responsi bie Official Bate:

p

~

~

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 104 Liquid Radwaste NPDES 0 AL0022080 PARAM MAX FLOW 15 20 TSS 30 100 LDT/08cG 15 20 LDT/TSS 100 Copper 1.0 Iron 1.0 UNITS MGD m /L m /L m /L m /L m /L-m /L FREQ 10 12 13 18 20 22 25

, 26 27 28 30 MAX 1/BATCH 0.055221 0.031495 0.062863 0.069305 0.031284 0.029130 0.023984 0.061711 0.031061 0.014829 0.089159 0.021371 0.030705 0.031661 0.062122 0.040970 0.031752 0.030271 0.061871 0.031061 0.031061 0.022880 0.060502 0.060495 0.030709 NO DISCHARGE 0.058421 0.030882 0.030458 0.062166

-0.089159 0.042393 2/wk 2/wk 1/BATCH 5

1 5

1 5

1 5

1 5

1 5

1 5

1 5

1 5

5 2

1/BATCH 16 1/BATCH (1)

NA 1/BATCH (1)

NA

.I certi fy under penal ty of lax that Chi s docament and al I attachments were prepared ander Che direction or supervision in accordance wi Ch a system designed Co assure that quali fied personnel properly gather and evalaate Che information submitted.

Based on my inquiry of Che person or persons who manage the system, or Chose persons directly responsible for gathering Che information, the information submitted is~ to the best of my knowledge and belief, true, accurate,.

and complete.

I am aware that there are significant penalties for submitting false information, 'including the possibility of fine and imprisonment for knoxi ng vi olations.

Signature of Responsible Official Date:

(I) Ho chemical metal cleaning solutions used this month.

~

~

1 4

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 105 Residual Heat Removal Service Water PARAM AVG MAX UNITS FLOW MGD 1/WEEK 1988 TEMP 1/WEEK COMMENTS NO DISCHARGE ENTIRE WEEK NPDES 0 AL0022080 10 NO DISCHARGE ENTIRE WEEK 12 13 14 15 17 18 NO DISCHARGE ENTIRE WEEK 20 NO DISCHARGE ENTIRE WEEK 26 30 NO DISCHARGE ENTIRE WEEK NO DISCHARGE ENTIRE MONTH

=I certify under penalty of law that thi s document and all attachments were prepared under Che directi on or supervision in accordance wi th a system designed Co assure that quali fied personnel properly gather and evaluate the information submitted-Based on my inquiry of the person or persons who manage Che system~

or Chose persons di rectl y responsible for gathering the information, the information submi tted is, to Che best of my knowledge and beli ef~ true, accurate, and complete.

I am aware Chat there are signi ficant penalties for submitting false information, including Che possi bi lity of fine and imprisonment for knowing violations.

Signature of Responsible Official Bate

~.

V,

)lg)

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 10b Condenser Cooling Water Station Sump 1988 NPDES 4 AL0022080 PARAM AVG UNITS FREQ.

FLOW 1/WEEK 0.000000 05G 20 m /l 1/WEEK TSS 30 100 m /l 1/WEEK COMMENTS DISCHARGE ROUTED TO LINED POND FOR ENTIRE REPORTING PERIOD.

0.000000 10 12 13 14 0.000000 17 18 20 22 0.000000 24

"'5 27'8 29

0. 000000 30 0.000000 AVG 0.000000 I certify under penalty of law that this document and all attachments were prepared under the direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry, of the person-or persons who manage the system~

or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true~ accurate, and complete.

I am aware that there are significant penalti es for submitting false information~ including the possi bility of fine and imprisonment for knowing violations.

Signature of Responsible Official Bate:

P

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 107 Unit 3 Control Bldg.

Drain PARAM AVG MAX UNITS FREQ FLOW MGD 1/WEEK 1988 15 20 m /l 1/WEEK TSS 30 100 m /l f/WEEK NPDES 4 AL0022080

-COMMENTS 0.001112 5

10 13 14 15

0. 003000 REPLICATES 08cG (5 TSS 7 17 18 20 21 0.002800 5

25 26 28 0.003000 5

f4 30 MAX AVG

0. 003000
0. 002478 14 10 I certi fy under penal t y of law that this document and all attachments were prepared under the di rection or supervision in accordance with a system designed to assure that quali fied personnel properly gather and evaluate the information submitted.

Based on my inquiry. of the person-or persons who manage the system~ or those persons directly responsible for gathering the information~ the information submi tted is~ to the best of my knowledge and belief, true, accurate~

and complete.

I am aware that there are significant penalties for submitting false information~ including the possibility of fine and imprisonment for knowing violations.

Signature of Responsible Official Dates

t lC

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 108 Diesel'ldg.

Sump Units 1

Sc 2 PARAM AVG UNITS FREQ.

FLOW MGD 1/WEEK 1988 15 20 m /l 1/WEEK TSS 30 100 m /l 1/WEEK NPDES 4 AL0022080 COMMENTS NO DISCHARGE ENTIRE WEEK NO DISCHARGE ENTIRE WEEK 10 12 15 17 18 NO DISCHARGE ENTIRE WEEK

'2 NO DISCHARGE ENTIRE WEEK

, 27 30 MAX AVG NO DISCHARGE ENTIRE WEEK 4

NO DISCHARGE ENTIRE MONTH I certify under penalty of lapp that this document and all attachments were prepared under the direction or supervision in accordance with a system designed Co assure that qualified personnel properly gather and evaluate the information submi tted-Based on my inquiry of Che person or persons who manage Che system or those persons directly responsible for gathering the information~

Che information submi tted is~

Co Che best of my knowledge and belief~ true~ accurate~

and complete.

I am aware Chat there are significant penalties for submitting false information~ including the possibili ty of fine and imprisonment for knowing violations.

Signature of Responsible Official Bate:

hf tr

I

~

I ALABANA DEPARTNENT OF ENVIRONNENTAL NANAGENENT DISCHARGE NONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 109 Diesel, Bldg.

Sump Unit 3

PARAN NAX UNITS FREQ.

,FLOW NGD 1/WEEK 1988 15 20 m /l 1/WEEK TSS 30 100 m /l 1/MEEK NPDES I AL0022080 CONNENTS NO DISCHARGE ENTIRE WEEK NO DISCHARGE ENTIRE WEEK 10 13 15 NO DISCHARGE ENTIRE MEEK 17 18 20 21 NO DISCHARGE ENTIRE MEEK 27 28 30 NO DISCHARGE ENTIRE MEEK NO DISCHARGE ENTIRE NONTH I certify under penalty of law that this document and all attachments were prepared under the di recti on or supervision in accordance with a system designed Co assure that qualified personnel properly gather and evaluate Che information submitted.

Based on my inquiry of Che person or persons who manage the system~

or Chose persons directly responsi ble for gathering the information, Che information submitted i s~

Co the best of my knowledge and beli ef~ true~ accurate, and complete.

I am aware Chat Chere are significant penalties for submitting false informati on, including Che possibility of fine and impri sonment for knowing violati ons.

Signature of Responsible Official Bate:

l

4 k

Ail gggcQ EE%

BISH ggggRl K%

R%

H KE

~iBl ggg EH ggg EH EH EH EH

~i Qg gpss gg gg

~i KK$%

K2&

~

~ ~ ~ ~

~

~

~ ~

~

~

~

~ ~

~ i

~

~ ~

~ ~ ~

~

~ i

~ ~ ~

~

~ ~

~

~

i

~ '

~

~ ~

~

~

~

C

~

~

~

~

~ ~

~

I

~

'l

~ I l

I

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORINS REPORT Tennessee Valley Authority BROMNS FERRY NUCLEAR PLANT DSN iii Sewage Treatment Lagoon PARAM MAX UNITS FREQ.

FLOM MGD 5/MEEK 0.003154 0.003154 1988 TSS m /l 2/MONTH BOD5 30 45 m /l 2/MONTH NPDES N AL0022080 COMMENTS 10 0.005515 0.005515 0.003154 0.003154 0.003154 61 12 13 14 15 16 17 18 20 0.008712 0.005515 0.003154 0.005515 0.024048

0. 039600 0.031248 0.024048 64 14 13 22
  • 0.031248 23

'-'0.024048 26 0.017856 27

'" '0.031248 28 0.03~600

"" 29

'-049248 60 30 MAX 0.049248 0- 049248 0.018688 64 I certify under penalty of law that this document and all attachments were prepared under the direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsi ble for gathering the information, the information submitted is, 'to the best of my knowledge and belief, true~ accurate, and complete.

I am aware Chat there are signi ficant penalties for submitting false information, including the possibili ty of fine and impi isonment for knowing violations.

Signature of Pesponsible Official Bate:

Descri tion of Dischar e DSN ill Sewage Treatment System Sewage overflowed two manholes and discharged to the intake forebay via the yard drainage system.

It is estimated that approximately 10,000 gallons of sewage was discharged during the event on September 27, 1988.

No samples were taken.

Cause and Period of Noncom liance While performing excavation work, construction personnel broke a water line resulting in a loss of pressure and an excessive amount of grit in the water main.

The grit caused valves on the laboratory fixtures to remain open after water pressure was established.

The excessive water flow overwhelmed the sewage air lift pumps causing sewage to back up and overflow the manholes.

The period of noncompliance was two hours.

Ste s Taken to Reduce Eliminate and Prevent Recurrence of Noncom 1 in

~Dischar e

Upon notification of the discharge environmental personnel installed a portable pump at the manhole in front of the air lift station to assist in relieving the excess flow.

The plant drilling, digging and chipping permit will be revised to include approval by environmental engineering.

The installation of a sewage overflow monitoring system at the lift station is being studied.