Responds to Black 880912 Request for Submittals to Support NRC Decision Re Restart.List of Submittals & Committed Completion Dates for Moderate Energy Line Break,Equipment Qualification Certification Ltr & Electrical Design Encl
ML18033A402
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 10/07/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.18, TASK-TM NUDOCS 8810120404
Download: ML18033A402 (10)


Text

va I

ACCELERATED DIAIBUTION DEMONST1ION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8810120404 DOC.DATE: 88/10/07 NOTARIZED: NO

-DOCKET g

FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH.NAME AUTHOR AFFILIATION GRIDLEY,R.

Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to S Black 880912 request for submittals to support NRC decision re restart.

DISTRIBUTION CODE:

D030D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: TVA Facilities

. Routine Correspondence NOTES:1 Copy each to: S.Black, J.G.Partlow, S.Richardson B.D.Llaw,F.McCoy.

05000260 S

RECIPIENT ID CODE/NAME SIMMS,M GEARS,G INTERNAL: ACRS AEOD OGC/HDS2 EXTERNAL: LPDR NSIC NOTES COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

0 1

1 1

1 RECIPIENT ID CODE/NAME PD ADM/LFMB NUDOCS-ABSTRACT ED~

01 NRC PDR COPIES LTTR ENCL 1

1 1

0 1

1 1

1 1

1.

,/

A D

R I"

D A'OTAL NUMBER OF COPIES REQUIRED:

LTTR 17 ENCL 15

1 I

II h

I

TENNESSEE VALLEYAUTHORITY CHATTANOOGA. TENNESSEE 37401 5N 157B Lookout Place 00T 07 t988 U.

S.

Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Hatter of Tennessee Valley Authority Docket No.

50-260 BROWNS FERRY NUCLEAR PLANT (BFN) RESPONSE TO LIST OF SUBHITTALS NEEDED FROM TVA TO SUPPORT RESTART This letter is in response to your letter from S.

Black to S. White, dated September 12,

1988, which provided a list of the submittals which the NRC staff needed from TVA to support NRC decisions regarding Unit 2 restart.

This list contained several submittals whose completion dates were considered by TVA to be regulatory commitments.

These regulatory commitments include responses to requests for additional information and TVA docketed commitments to provide information by a specific date.

This list. also contained

some, submi ttals whose scheduled submittal dates were TVA"s".internal admini'strative target completion dates and were not considered to be committed submittal completion dates.

Enclosure 1 to this letter provides the staff with an actual submittal date or a committed completion date for all submittals discussed in the staffs'etter.

New committed submittal dates are annotated on the enclosure.

This enclosure reflects the status of the submi ttals as of October 4, 1988.

As a matter of standard working practice, TVA will continue to provide the

, staff with internal target completion dates for all submittals as a courtesy to assist in the planning and scheduling of the manpower required to review and resolve these issues.

TVA will provide formal commitments for submittal completion dates on the docket, when requested.

In addition to the list of submi ttals provided in the September 12, 1988

letter, the staff requested TVA provide the expected fuel reload and restart dates for Browns Ferry Unit 2.

All systems required for fuel reload are expected to be ready by October 27, 1988.

Browns Ferry is expected to be ready for restart four to six months after fuel reload.

88101 QCK 0~~000260 20404 881007 PD~

~D<<

poc P

An Equal Opportunity Employer

f

U.

S. Nuclear Regulatory Commission OCT OV ieee Please refer any questions rega'rding this submittal to Patrick Carier, Acting

Manager, BFN Site Licensing, (205) 729-3570.

Very'truly yours, TE NE EE V EY AUTHORITY Enclosures cc (Enclosures):

Ms.

S.

C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One Hhi te Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. F.

R.

McCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NH, Suite 2900 Atlanta, Georgia 30323 Brogans Ferry Resident Inspector Brogans Ferry Nuclear Plant Route 12, Box 637

Athens, Alabama 35611 R. Grid'ley, Man ger Nuclear Licensi g and Regulatory Affairs

A

'll't E

s Jr

ENCLOSURE 1

LISTING OF SUBMITTALS AND COMMITTED COMPLETION DATES SUBMITTAL Moderate Energy Line Break Equipment Qualification Certification Letter Readiness for Appendix R

Audit Microbiologically Induced Corrosion Program Plan NUREG-0737, Item II.K.3.18 ADS Actuation Study Electrical Design Issue Thermal Overload Review Technical Specification for Unit 2 reload (TS 254)

Revised Inservice Inspection Program Electrical Design Issue-Ampacity Electrical Design Issue Fuse Program Electrical Design Issue Cable Installation Technical Specification for Control Room Emergency Ventilation System (TS 259T)

COMPLETION DATE 9/23/88 A

2/28/89 C

'1/21/88 C

9/29/88 A.

9/12/88 A

9/23/88 A

8/26/88 A

9/21/88 A

9/30/88 A

9/21/88 A

9/29/88 A

9/28/88 A

COMMENTS A - Denotes actual submittal date C Denotes new commitment date

~

f V

ENCLOSURE 1

(CONT.)

LISTING OF SUBMITTALS AND COMMITTED COMPLETION DATES SUBMITTAL IE Bulletins 79-02 and 79-14 Piping Issues Seismic Qualification of Conduit Supports Seismic Qualification of Miscellaneous Steel Seismic Qualification of HVAC Ductwork Seismic Qualification of Drywell Steel Instrument Sensing Lines Nuclear Performance Plan (NPP)

Site Management Organization NPP Operational Readiness Program NPP Introduction and Programmatic Corrections Detailed Control Room Design Review Summary Report COMPLETION DATE 9/28/88 A

10/14/88 Not Required Not Required 10/14/88 10/21/88 C

10/23/88 C'0/23/88 C

10/23/88 C

11/11/88 C

COMMENTS A submittal on this subject is no longer required as discussed in TVA letter from R. Gridley to NRC, dated September 21, 1988.

A submi ttal on thi s subject is no longer required as discussed in TVA letter from R. Gridley to NRC, dated September 21, 1988.

Will be included with submittal on conduit supports.

Hill be included with NPP Site Management Organization submittal.

Hill be included with NPP Site Management Organization submittal.

A Denotes actual submittal date C Denotes new commitment date