Forwards Supplemental Response to NRC 860521 Ltr Re Violation Noted in Insp Repts 50-259/86-09,50-260/86-09 & 50-296/86-09.Present Schedule for Physical Completion of Secondary Containment Fire Barrier Sealing Is 881031
ML18033A252
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/22/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8807010036
Download: ML18033A252 (5)


Text

mc CELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR: 8807010036 DOC ~ DATE: 88/06/22'OTARIZED: NO DOCKET FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH. NAME AUTHOR AFFILIATION GRIDLEY,R. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards supplemental response to NRC violation noted in Insp 860521 Repts 50-259/86-09 &

ltr re 50-260/86-09.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ( ENCL TITLE: General L

(50 Dkt)-Insp Rept/Notice of Violation Response SIZE:

S NOTES:S.Black 3 cy.l cy. ea to: Ebneter,Axelrad,S.Richardson 05000259 B.D.Liaw,K.Barr, OI.

S.Black 3 cy.1 cy. ea to: Ebneter,Axelrad,S.Richardson, 05000260 B.D.Liaw,K.Barr, OI. A S.Black 3 cy.1 cy. ea to: Ebneter,Axelrad,S.Richardson, 05000296 B.D.Liaw,K.Barr, OI. D RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD 1 1 MORAN,D 2 2 GEARS,G 2 2 RNAL: ACRS 2 2 AEOD 1 "1 DEDRO 1 1 NRR MORISSEAU,D 1 1 NRR/DLPQ/PEB 11 1 1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA DIR 11 1 1 NRR/DREP/EPB 10 1 1 NRR/DREP/RPB 10 2 2 NRR/DRIS DIR 9A 1 1 G

T'2 NRR/PMAS/ILRB12 OE LIEBERMAN,J E 01 1

1 1

1 1

1 1

1 NUDOCS-ABSTRACT OGC 15-B-18 RES/DRPS DEPY 1

1 1

1 1

1 R,

EXTERNAL LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 9 9 8

A TOTAL NUMBER OF COPIES REQUIRED-'TTR 36 ENCL 36

TENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEE 37401 5N 157B Lookout Place U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Nashington, D.C. 20555 Gentlemen:

In the Matter of Docket Nos. 50-259 Tennessee Valley Authority 50-260

) 50-296 BROHNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 NRC INSPECTION REPORT NOS. 50-259/86-09, 50-260/86-09, AND 50-296/86-09, SUPPLEMENTAL RESPONSE TO VIOLATION This letter provides a supplemental response to violation (item 2) which was forwarded in your letter from J. Nelson Grace to S. A. Hhite dated May 21, 1986. The subject of the violation was inadequate Surveillance Instructions (SI) for fire barrier penetrations.

The supplemental response dated December 9, 1987, called for the fire barrier modifications and associated surveillance instructions to be complete by June 17, 1988. A new SI will be issued to meet the requirements of the Technical Specifications by June 17, 1988. Technical Specification allowed compensatory measures for the nonfunctional fire barriers are in place until the modification work is complete and the barrier is restored to functional status. TVA's position is that full compliance wi 11 be achieved for this violation when the new SI is issued. The present schedule for physical completion of the secondary containment fire barrier sealing is October 31, 1988.

A summary list of commitments is provided in enclosure l.

If you have any questions, please telephone Clark Madden at (205) 729-2049.

Very truly yours, TENNESSEE A EY AUTHORITY R. ridley, Di ctor Nuclear Licens ng and Regulatory Affairs Enclosure cc: See page 2 ye01 8807010036 880622 PDR 0

ADOCK 05000259'n equal OPportunity EmPloYer

i U.S. Nuclear Regulatory Commission

~ ~

cc (Enclosures):

Mr. K. P. Barr, Acting Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NN, Suite 2900 Atlanta, Georgia 30323 Ms. S. A. Black, Assistant Director for Projects TVA Projects Division-U.S. Nuclear Regulatory Commission One Nhite Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 0

ENCLOSURE 1 SUPPLEMENTAL RESPONSE NRG INSPECTION REPORT NOS.

50-259/86-09, 50-260/86-09, 50-296/86-09 LETTER FROM J. N. GRACE TO S. A. NHITE DATED MAY 21, 1987 LIST OF COMMITMENTS

1. The Surveillance Instruction will be issued to meet the requirements of the Technical Specification by June 17, 1988.