REGULA . Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR: 8803010434 DOC. DATE: 88/01/31 NOTARIZED: NO DOCKET FACIL: 50-259 Browns Ferry Nuclear Power,Stations Unit ii Tennessee 05000259 50-260 Browns Ferry Nuclear Power Stationi Unit 2i Tennessee 05000260 50-296 Browns Ferry Nuclear Power Stationi Unit 3. Tennessee 05000296 AUTH. NAME AUTHOR AFFILIATION Tennessee Valley Authority RECIP. NAME RECIPIENT AFFILIATION

SUBJECT:

Discharge monitoring rept for Jan 1988.

DISTRlBUTION CODE: IE48D COPIES RECEIVED: LTR TITLE: 50. 36a(a) (2) Semiannual Effluent Release

~Reports ENCL J SIZE:

NOTES: G. Zech 3 cg. 1 cg. ea to: Ebneteri Axelradi S. Richardson 05000259 B. D. Liawi K. Barri Donohewi OI.

G. Zech 3 cg. 1 cg. ea to: Ebneter Axelradi S. Richardson'.

05000260 D. Liawi K. Barri Donohewi OI.

G. Zech 3 cg. 1 cg. ea to: Ebneteri Axelradi S. Richardsoni 05000296 B. D. Liawi K. Barry Donohewi OI.

RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL JAMERSONi C 0 PD MORANr D 1 STANGi J INTERNAL: AEOD/DOA 1 AEOD/DSP/TPAB ARM TECH ADV 1 NRR/DEST/PSBSD1 NRR/DREP/RPB10A 4 NRR/PMAS/ ILRB 12 01 RGN2 FILE 02 R DRSS/EPRPB 1 EXTERNAL: BNL TICHLERiJ03 LPDR NRC PDR NOTES: 1 10 TOTAL NUMBER OF COPIES REQUIRED'TTR M ENCL 32

K I'

k l, I

I IK K

4 rJ K,,C,

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING. REPORT Tennessee Valley Authority BRONNS FERRY NUCLEAR PLANT DSN 101 Di ffuser Di scharge Structure NONTH J~anuar 1988 NPDES I AL0022080 PARAM FLON pH mb.

em River downstream erasure p.S.. RjyyrO pownstyeam Temperature 6.0 24hr Av Max 24hr Av Max Hour l Max 24hr Av Max MAX 9.0 90. 0 6 Hrl Rd 93. 0 10. 0 UNITS MGD 4 Rd s >6 FREQ. Cont'. 1/wk Continuous Continuous purl Continuous Continuous 1 633. 6 48. T 48. 9 0 0.5 2 633. 6 48. 3 48. 8 48. 4 0.7 3 633. 6 47. 3 4T. 5 0 46. 6 4 633. 6 46. 6 46. 5 46. 3 0.1 5 633. 6 7.7 46. 0 45. 8 0 45. 7 0.5 6 633. 6 44. 1 44. 6 45. 0 1.3 7 633. 6 42. 7 43. 8 0 43. 6 1.7 8 633. 6 40. 3 41. 6 0 42. 4 633. 6 40. 2 40. 5 41.6 0.3 10 633. 6 39. T 40. 6 40. 9 1.3 11 633. 6 39. 3 40. 1 0 40. 5 0.9 12 633. 6 8. 1 40. 0 38. 1 0 40. 1 -0. 9 13 633. 6 41. 1 40. 1 40. 7 -0. 3 14 633. 6 41. 1 40. 2 0 40. 2 -0. 2 15 633. 6 39. 6 39. 2 0 39'. 9 0.0 16 633. 6 40. 3 39. 8 0 40. 1 -0. 2 17 633. 6 41.4 40. 2 0 41. 1 -1. 0 18 633. 6 42. 4 41.5 0 42 3~ -0. 6 19 633. 6 7.9 43. 9 43. 6 45. 4 -0. 1 20 633. 6 47. 3 48.0 48. 9 0.7 21 633 ' 47. 3 48. 0 47. 7 0. T 22 633. 6 46. 6 46. 6 45. 7 0.0 23 633. 6 45. T 44. 5 44, ~ 4 24 633. 6 45. 6 44. 3 44. 5 25 633. 6 45. 4 44. 5 44. 4 -0. 5 26 633. 6 7.6 44. 6 44. 0 0 43. 3 -0. 3 27 633. 6 42. 6 41. 9 0 41. 8 -0. 5 28 633. 6 42. 2 42. 2 42. 9 0.3 29 633. 6 43. 3 42. 6 0 43. 5 -0. 5 30 633. 6 44. 5 43. 7 44 -0. 2 31 633. 6 45. 6 45. 5 -0. 5 No: IAX tw CllCI "G 633. 6 8. 1 48. 7 48. 49'. 5 1.7 m a. 633. 6 43. 7 4 9'3.

43. 8 0.1 1 IN 7.6 gg gg I certify under penal t y of I aw Chat thi s document and al I at tachments were

'prepared under the direction or supervision in accordance wi th a system F95 designed to assure that qualified personnel properl y gather and evaluate the

mt 0 g linformation sabmi tted. Based on my inquiry of Che person or persons who g+ 'manage the system~ or those persons directly responsi ble for gathering the Iinformation, Che i nformation submitted is, to Che best of my knowledge and m~ 'belief, true, accurate~ and complete.

OIL I'm aware that there are signi ficant

+++I penalties for sabmi tti ng false information~ including the possibility of fine and imprisonment for knowi ng vi ol a i ons.

Signatare of Responsible 0ffi cial Bate: lI (

r 1

S C ~

ALABAMA DEPARTMENT QF ENVIRONMENTAL ANAGEMENT DISCHARGE MONITORING REPORT Tenneeeee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 102 Sedimentation Pond MONTH J~anuar 1988 NPDES I AL0022080 PARAM FLOW pH TSS.

MIN. 6. 0 9.0 100 COMMENTS UNITS MGD 5a Ua m /I m /1 FREQ. 1/RELEASE 1/RELEASE 1/RELEASE 2/RELEASE 10 12 13 15 16 17 18 20 21 22 24 26 28 30 31

  • No Dischar e This Entire AVG Ifonth MIN TOTAL o Dischar e*

I certify under penalty of Iaw that this document and all attachments were prepared under Che direction or supervision in accordance with a system designed to assure Chat quali fied personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who Che system~ or those persons directly responsible for gathering the imanage nformati on~ the information submi Cted i s~ to the best of my knowledge and belief~ true~ accurate, and complete. I am aware Chat there are signi ficant penalties for submi Cting false information, including the possi bili ty of fi ne and imprisonment for knowing vi olati ons.

Si gnat ur e of Responsible Official Date:

J. ~

  • I AkV I

~ ~

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANASEMENT DIBCHARSE MONITORINS REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 103 Unit, 1,2,3 Turbine Station Bump MONTH ~Januar 1988 NPDES ¹ AL0022080 FLOW TSS 15 30 MAX 20 100 COMMENTS UNITS MSD 1/WEEK m /1 m /l 1/WEEK FREQ. 1/WEEK 0.900000 5 10 13 15 0.600000 16 17 20 0.9'36000 17 22 23 25 27 28 0.527000 5

0. 9'36000 23 0.740750 5 13 I certi fy under penalty of Iaw that this document and all attachments were prepared under the direction or supervision in accordance with a systemic designed to assure that quali fied personnel properly gather and evaluate the information submitted. Based on ey inquiry of the person or persons who manage the system~ or those persons di rectl y responsible for gathering the i nforeati on~ the i nfornati on submitted i s~ to the best of ey knowledge and beli ef, true, accurate~ and complete. I ae aware that there are significant penalties for subai tti ng false information, including the possibili ty of fine and i capri sonment for knowing vi ol ations Si gnat ure of Responsi bI e Official Bate:

r

~ I, Y

t1t

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 104 Liquid Radwaste MONTH J~anuar 1988 NPDES 0 AL0022080 PARAM FLOW Otic 6 "'S8 LDT/08cG LDT/TSS Copper Iron 15 30 15 30 20 100 20 100 1.0 1.0 UNITS MGD m /L m /L m /L m /L m /L m /L FREQ. 1/BATCH 2/wk 2/wk 1/BATCH 1/BATCH 1/BATCH 1/BATCH 1 No Di.

2 0.047950 3 0.018265 6 0.031061 5. < 1 8 0. 030994 0.031284 10 0.021751 12 0. 0301 8 5i < 1 13 0.030216 14 0.031061 5 < 1 15 0.030421 16 0.018349 17 0.031061 18 0.025758 19 0.033069 5- < 1 5 20 0.054142 21 22 0.053882 5 < 1 23 0. 019095 24 0.060818 25 0.022880 5 < 1 26 0.031227 27 0.021752 28 0.031227 5 < 1 29'.022327 30 0. 019050 31 0.031284 MAX 0.060818 23

'.031163 5 < 1 5 23 E certify under penalty of law that this document and all attachments were prepared under the di recti on or supervision in accordance wi th a system designed to assure that quali fied personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system~ or those persons directl y responsi ble for gatheri ng the information~ the information submi tted is~ to the best of my knowledge and beli ef~ true~ accurate~ and complete. E am aware that there are si gni ficant penalties for submitting false i nformati on~ including the possibility of fi ne and imprisonment for knowing violations.

Si gnat ure of Responsible Official Date:

~ 4 4 4 4 4 ~ 4 4

4 4 4 ~ ~ ~ ~

KKK~

4 KRK~

4

%IRK~

KIRK KR~

KI~l~

~5 B~

RR~

~

ER~

KR~

~

IRI~

IRI m~

IRI~

~ ~ I BR~

KR~

EKI IRI~

RK~

RK~

RR~

RK~

RR~

~ )

RR~

IK~

EH%

RK~ 3 ~ ~ I ~

gppcg ~ I

~ 4

~ 4 4

R ~

~ ~

4 ~

~ ~

g 8 ~t t

f~

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANASEMENT DISCHARSE MONITORINS REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 106 Condenser Cooling Water Station Sump MONT8 J~anuar 1988 NPDES 8 AL0022080 PARAM FLOW OSS TSS 30 20 100 COMMENTS UNITS FREQ.

MSD 1/WEEK m /l 1/WEEK m /l 1/WEEK 7 No Dischar e 8 This Entire Week 12 13 No Dischar"e 1 5 This Entire Week 17 18 21 No Dischar e 22 This Entire 23 Week 27 28 No Disrhar e *DISCHARGE ROUTED TO SEDIMENTATION 29 This Entire POND FOR ENTIRE REPORTING PERIOD.

30 eek 31 MAX AVS No Dischar e*

E certify under penalty of law that this document and all attachments were prepared under the direction or supervision in accordance with a system designed to assure that quali fied personnel, properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system~ or those persons directl y responsible for gatheri ng the informati on~ the information submitted i s~ to the best of my knowledge and belief~ true~ accurate~ and complete. E am aware that there are significant penalties for submitting false information, including the possibi ty of fine and imprisonment for knowi ng violations.

li Signature of Responsible Official Bate:

r ~ I 1

l '

5 J~

1

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 107 Unit 3 Control Bldg.

Drain MONTH PARAM J~anuar FLOW 1988 NPDES I AL0022080 TSS 15 30 MAX 20 100 COMMENTS UNITS FREQ.

MGD 1/WEEK m /l 1/WEEK m /l 1/WEEK 0.001330 5 10 12 13 0.001200 5 14 15 16 17 18 19 20 0.000912 36 12 21 22 0.001900 5 0 Sc G RESAMPLE ( 5 26 27 28 29 30 MAX 0.001900 0.001336 12 I certify under penalty of law that this document and all attachments were prepared under the direction "or supervision in accordance wi th a system designed to assure that qualified personnel properl y gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system~ or those persons directly responsible for gathering the information~ the i nformati on submitted is~ to the best of my knowledge and belief~ true~ accurate~ and complete. I am aware that there are significant penalties for submitting false i nformati on~ including the possi bi ty of fine and imprisonment for knowing vi ol ati ons. li Si gnature of Responsi bl e Official Bate:

e

~ lp n.

~I 0IL I

4 R~~

Rial

~ RNR RSKIR~

~

R~

IRIRR~

Rl~

~ ~ ~

~ ~

~ ~ ~ w ~

m~

~

8~

RR~

~

~

RR~

KR H

IRI~

~ )

IRI~

IRI m

RR~

IRI~

ggg ml~

RR~

IRI IRI~

Qg SR~

~

gg i ~ l ~ ~ ~

gg

~i Qg RXX%

RK'R

~ ~

~ r

  • c ')

4i 4>>I

II g

~

ALABAMA D ARTMENT OF ENVIRONMENTAL M AGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR. PLANT DSN 109 Diesel Bldg. Sump Unit 3 MONTH J~anuar 1988 NPDES 0 AL0022080 PARAM FLOW 08(G TSS AVG 30 20 100 COMMENTS UNITS MGD m /1 m /1 FREQ. 1/WEEK 1/WEEK 1/WEEK 6

7 No Discharge 8 This Entire 9 Week 10 12 13

14. No Discharge 15 This Entire 16 Week 17 18 20 21 No Discharge 22 This Entire 23 Week 25 27 28 No Dischar e 29 This-Entire- *No Discharge T xs hntxre. 1ont 30 Week 31 MAX AVG No Dischar e
  • I certi fy under penalty of lax that this document and all attachments were prepared under the direction or supervision in accordance with a system designed to assure that quali fied personnel properly gather and evaluate Che information submitted. Based on my inquiry of the person or persons wtho manage the system~ or Chose persons directly responsible for gathering Che information, the information submitted is, to the best of my knowledge and beli ef, true~ accurate, and complete. I am aware Chat Chere are significant penalties for submitting false information, including Che possibility of fine and imprisonment for knowing violations.

Si gnature of Responsible Official Bate:

t II t

I Cf ~

I3 y ~

~ ~

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 110 Unit 1 Sc 2 Ok%ice Bldg. Drain MONTH . J~anuar 1988 NPDES 0 AL0022080 PARAM FLOW TSS AVG 15 30 MAX 20 100 COMMENTS UNITS FREQ.

MGD 1/WEEK m /l m /l 1/WEEK 1/WEEK 43 37 0.000500 26 35 10 22 TSS RESAMPLES 122 8c 34 12 14 13 0.000254 14 16 44 18 22 20 0.000289 32 21 104 22 39 23 134 25 347 TSS RESAMPLES 378 5 111 26 27 183 28 0.004830 13 30 29 30 66 MAX 0.004830 13 378 0 '01468 70 E certify ander penalty of law that thi s docament and al l attachments were prepared ander the direction or supervision in accordance with a system designed to assure that qaali fied personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information~ the information submitted is~ to the best of my knowledge and beli ef, trae, accarate, and complete. E am aware that there are significant penalties for sabmi tting false information~ including the possibility of fine and imprisonment for knowi ng violations.

Signature of Responsible Official Date:

ai LI

'hh

'f f4~

I

ALABAMA D RTMENT OF ENVIRONMENTAL M AGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN iii Sewage Treatment Lagoon MONTH J~anuar 1988 NPDES 5 AL0022080 PARAM FLOW TSS BOD5 90 30 MAX COMMENTS UNITS MGD 5/WEEK m /l m /l FREQ. 2/MONTH 2/MONTH 0.031248 0.049248 22 0.049248 0.049248 0.039600 0.049248 10 0.031248 12 0.031248 29 13 0.031248 0.039600 15 0.039600 17 18 0.031248 0.039600 0.039600 19 21 21 0.039600 0.039600 0.039600 20 26 0.039600 27 0.039600 28 . 0; 049248 "

29 0.049248 31 0.049248 29 AVG 0.040368 21 22 E certi fy under penalty of Iaw Chat this document and all attachments were prepared under the direction or supervisi on in accordance wi th a system designed Co assure that quali fi ed personnel properly gather and evaluate Che information submi Cted. Based on my inquiry of the person or persons who manage Che system~ or Chose persons directl y responsi ble for gatheri ng the information, the i nformati on submitted i s~ Co the best of my knowledge and beli ef, true, accurate, and complete. I am aware Chat there are si gni ficant penalti es for submitting false i nformati on~ including the possi bi Ii ty of fine and imprisonment for knowi ng vi olati ons.

Signature of Responsi bIe Official Bate:

t Descr'i tion of Dischar e DSN 107 Unit 3 Control Building Drain The oil and grease content exceeded the daily maximum of 20 mg/1. The oil and grease content of the discharge was 36 mg/1 on January 20, 1988.

Cause and Period of Noncom liance The cause of this noncompliance was not determined because communication of the occurrence was not prompt. Two samples taken on January 25, 1988 contained < 5 mg/1 oil and grease. The maximum period of noncompliance was thirteen days.

Ste s Taken to Reduce Eliminate and Prevent Recurrence of Noncom 1 in

~Dischar e Laboratory personnel were reminded of the need to immediately notify the Environmental Engineering Section of all noncompliances to allow investigations of their cause. In addition, procedure revisions are being made to require prompt data review by the laboratory shift supervisor and to specify the permit limit on the data sheet.

I4 F

Oescr'i "tion of Oischar e DSN 110 Unit 1 8 2 Office Building Drain The total suspended solids (TSS) content exceeded the daily maximum of 100 mg/1 and the daily average of 30 mg/1. The table below contains the dates and values of the noncompliances.

Cause and Period of Noncom liance One possible cause was iron oxide laden

,water drained from the hot water generator'n the control bay chiller room to the floor drain. This was discussed in the. December OMR. This system was drained in December so a maintenance request could be performed on a hot water recirculation pump. Two flushes of this line were done on January 11 and January 24-25, 1988. Another possible cause was identified as a sink in'the control bay used to wash cooking and eating utensils. Food, soap, and grease from this sink may be resulting in the high and fluctuating total suspended solids content. The following table lists the maximum periods of noncompliance.

DATE VALUE MAXIMUM PERIOD OF NONCOMPLIANCE January ll 122 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, 15 minutes (Flush)

January 21 104 2 days, 2 hours, 42 minutes January 24-25 134, 347, 378, 111 ,

2 days, 2 hours, 42 minutes (Flush)

January 27 183 1 day, 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br />, 25 minutes Ste s Taken to Reduce Eliminate and Prevent Recurrence of Noncom 1 in Oischa~cie We are investigating ways to route the sink drain to the sanitary wastewater system. If this cannot be done, the sink will be removed from service.

0919m