ML18032A683

From kanterella
Jump to navigation Jump to search
Monthly Discharge Monitoring Rept for Nov 1987
ML18032A683
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 11/30/1987
From: Brooks R
TENNESSEE VALLEY AUTHORITY
To:
References
NUDOCS 8712310028
Download: ML18032A683 (28)


Text

N ACCELERATED D1%R1BUTJON DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8712310028 DOC. DATE: 87/11/30 NOTARIZED: NO DOCKET FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296-AUTH. NAME AUTHOR AFFILIATION BROOKS,R.H. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly discharge monitoring rept for Nov 1987. R DISTRIBUTION CODE: IE25D COPIES RECEIVED:LTR S'NCL~ SIZE:

TITLE: Environmental Monitoring Rept (per Tech Specs)

NOTES:G:Zech 3 cy. 1 cy. ea to: Ebneter,Axelrad,S.Richardson 05000259 D B.D.Liaw,K.Barr,Donohew,OI.

G.Zech 3 cy. 1 cy. ea to: Ebneter,Axelrad,S.Richardson, i. ", 05000260. 8 B.D.Liaw,K.Barr,Donohew,OI.

G.Zech 3 cy. 1 cy. ea to: Ebneter,Axelrad,S.Richardson, B.D.Liaw,K.Barr,Donohew,OI.

05000296 /

A RECIPIENT COPIES RECIPIENT 'COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL JAMERSON,C PD 1 GEARS,G STANG,J 5 INTERNAL: ACRS AEOD/DOA AEOD/DSP/TPAB ARM TECH ADV N ADE NRR/DREP/RPB G FILE 01 RES DEPY GI 02 RGN2/DRSS/EPRPB EXTERNAL: LPDR NRC PDR NOTES 1 10 A','

TOTAL NUMBER OF COPIES REQUIRED: LTTR /3 ENCL 36

~J

-~i l

'I "f 1,e I A

k ~ .~~f'p 4a t~ l, tfj I

III.L

ALABA EPARTMENT OF ENVIRONMENT MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BRONNS FERRY NL'CLEAR PLANT DSN 101 Di-.fuser D- scharge Structure MONTH . November 1987 NPDES 0 AL0022080 PARAM 6.0 em River Downs-mb. eratvure R ver Temp.

24hr Av Max 24hr Av May ea>w ),S. Rjgyr . R'Tv

.ownst

'1 Yel Tem Hour 1 earn Temp.er tC ~c Ma:< 2ahr Av Mav.

at 9.0 ?0. 0 6 Hr l Rd s .0 10. 0 UNITS MGD s>> u>> 4 Rd s >6 FREQ. Cont. 1/wk Cont nuous Continuous Hour 1 Continuous Continuous 1267.2 62 ~

1 62. 0 62. 9 1267. 2 6~. 2 0.0 1267.2 o>>S b~. 4 1 1267.2 b~. 2 64. 0 0.0 1267.2 ba. 2 6 .~ ~ 2 bw. 1 0.0 1267.2 62. 8 62. 61.6 0 1267.2 60. 7 0 60. 8 7'1.

1267.2 60. 4 60. 5 60. 4 0,2 l 1267 o0. 7 60 ~ 6 61. 0 O.O 10!'267.2 8.0 60. 7 60. 7 60.  ? 0.5 o/ ~ 59. 1 59. 6 57. 5 0 S ~

5c. 7 0 o7 ~

l So. 9 o/ /

l >>>> / ~

~ ~

6 '>D>>6 56. 0 56. 4 56. 5 0.9 16 6~~. 6 57. 4 Sb. 2 57. 8 0 17 6~3. 6 8.2 58. 5 S7. 9 58 -O. 5 18! 6~ .. 6

~ 58. 5 57 7 ~

57 7

~ / ~ 0 57. 1 0 0 ~

20 l b>3. 6 Sb. 6 ao ~ O 'o ~ 0 ~

2.  !

~=.-

<<>>>> '> 6

~ Sa. 7 ~

\

~

5. >>o b.i.i. 6 bi~. 6 5".. 6 0.2 633. 6 S5. 7 55. 0 55. 9 -0. 1 26 6~2. 6 56. 1 5.4 55 7 ~ -O. 5 27 bw>. 6 Sb. 6 55. 6 56. 0 -O. 5 637.6 56. 8 56. 1 56. 5 -O. 5 29 637. 6 56. 7 56. 2 0 5S. 8 ban. 6 SS. 2 55. 2 5a. 6 MAX 1267. 2 8. 4 6& 64. 0 865. 9 58. 1 58. 2 O..D MIN 7.9 I certi fy under penalty- of law Chat this 'document and all attachments were prepared under the direction or supervision i n accordance wi th a- system desi gned to assure Chat qualified personnel properl y gather and evaluate Che information suhmi -d. Based an my inquiry of the person or. persons who manage the system, or those persons directly responsible for gatheri ng the i nforma ian, the 'nformati on submi Cted is/ to the hest of my knowledge and bel 'e> true/ accurate, and complete. I am a~are Chat Chere are signi fi cant penal ties for suhmi tti ng false informati on, including Che passi bili ty of fi ne and imprisonment for knowi ng violations.

(anginal signed by g+. 3

., Signature of Pespansible Official -gsiphH; Brooka-.. = . - Date: OEC

'87'12310028 871130 PDR ADOCK 05000259

,R DCD

~ ~

~ .

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN .102 Sedimentation Pond MONTH November 1987 NPDES 4 AL0022080 PARAM FLOW pH 08cG TSS AVG MIN. 6. 0 30 MAX 9.0 20 100 COMMENTS UNITS FREQ.

MGD 1/RELEASE siua 1/RELEASE m /l 1/RELEASE m /l 2/RELEASE 0.219000 7.9 22 10 12 13 17 20 27 28 30 0.219000 7.9 22

.0.219000 18 MIN 7.9 TOTAL 0'.219000 I certi fy under penalty .of law Chat this document. and all-attachments were prepared under Che directi on or supervision in accordance wi th a system designed Co assure Chat qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directl y responsible for gatheri ng Che i nformati on~ Che i nformati on submi tted i s~ Co the best of my knowledge and belief~ true, accurate~ and complete. *I am aware Chat there are significant penalties for submi tting false i nformati on~ including Che possi*i li Cy= of fine and i mpri sonment for A'nowi ng vi ol ati ons-.

Signature of Responsible Official Bate:

gD

~,

ALABAMA DEPARTi"lENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Val 1 ey Author BRONNS FERRY NUCLEAR PLANT

'y DSN '103 Unit 1,2,3 Turbine Station Sump MONTH November 1987 NPDES 0 AL0022080 PARAM FLOW TSS AVG 15 30 20 COMMENTS UNITS MGD m /I 1/MEEK 1/MEEK 1/MEEK 0.384000 5 9l 10 l 13 0.23COCO 14 15 ib 20 0. >>9- 710 27 0.5ib000 28 30 superv'sion MAX "'.51b000 5 "AVG 0.405927 5 8 I certi fy under penalty of law Chat. thi s document and-all attachments were prepared under -Che direction or "in accordance with a'-system desi gned Co assure Chat quali fied personnel properl y gather and evaluate the information submitted. Based on my inqui r y of the person or person= who the system, or those persons directly responsible for gathering Che 'anage information, the informati on submitted is>> to the best of my knowledge and beli ef>> true>> accurate>> and complete. I am aware that Chere are si gni fi cant penalti es for submitting false i nformation>> including the possibility of.

fi ne and i mpri sonment for knowi ng vi o1ati ons.

Signature of Pesponsi ble Of fi c'al Vate:

1%'

.30 A

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORlNG REPORT Tennessee Valley Authority BROGANS FERRY NUCLEAR PLANT DSN 104 Liquid Radwaste MONTH Nc.'vember 1?87 NPDES 5 AL0022080 rLOg O~~~G TSS LDT/TSS LDT/O:-.G Cepner iran AVG 15 30 15 i 1AX 100 100 20 1.0 1.0 L'NXTS MGD m /L m /L m /L m /L m /L m /L 1/BATCH 2/wk 2/wk 1/BATCH 1/BATCH 1/BATCH 1/BATCH 1 l O. 018279 0.028375 0.021917

0. 030392 0 '26754 5 6 0. 061890 0.025579 8 0.025864 0 024662 10 0.017397 0.03099 lI 0.022672 0.028522 fC 0.027912 0.052986 0.022445 0.028984 V Oc 0.030902 0.036812 0 '25224 0.0 O 0.02?171 0.026852 P%

8 0.027171 0.024129 0.022181 MAX 0. 061890 AVG 0.029438 5 certi f y under penalty. of- law Chat: Chi~= document and,all attachments were prepared under. the .directi on or supervision in accordance wi th a.system desi gned to assure Chat quali fied personnel properl y gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage Che system~ or Chose persons di rectl y responsi bl e for gatheri ng Che i nformation~ the 'nformation submi tted 2'm i s~ to the best of my Anowledge and beli ef~ true, accurate, and complete. a~are that there are si gni fi cant peralties for submitting false information including the possibility of fi ne and i mprisonment for knowi ng violations.

-i gnature of Responsible Off'ci al, Bate~

f 4I, tp

~ 'I

~II

"*g 'E

  • W

O.

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 105 Residual Heat Removal Service Water MONTH November 1987 NPDES ¹ AL0022080 PARAM FLOW TEMP AVG COMMENTS UNITS MGD FREQ. 1/WEEK 1/WEEK NO FLOW 10 12 NO FLOW 14 15 16 1'7 18 19 20 NO FLOW 21 22 23 24 25 27 NO FLOW 30 MAX AVG 7 certify under penalty of law Chat Chi s document and all attachments were pr'epared under Che directi on or supervision in accordance wi th a system designed to assure that qualified personnel properly gather and evaluate the information submi tted. Based on my inquiry of Che -person or persons who manage the system~ or those persons directl y responsible for gathering Che i nformati on~ Che i nformati on submitted i s~ to Che best of my knowledge and belief, true, accurate, and complete. I am aware Chat there are si gni ficant penalties for submi Cting false information, including Che possibility of fine and i mpri sonment for knowi 'ng vi olati ons.

Signature of Responsible Official Bate:

'Mt II ilg%

I I

~F

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 106 Condenser Cooling Water Station Sump MONTH November 1987 NPDES 0 AL0022080 PARAM FLOW TSS AVG 15 20 100 COMMENTS UNITS MGD m /1 m /1 FREQ. 1/WEEK 1/WEEK 1/WEEK DISCHARGE ROUTED TO SEDIMENTATION POND FOR ENTIRE REPORTING PERIOD.

0.000000 10 12 0.000000 13 14 15 17 18 19 0. 000000 20 21 22 24 25 26 0.000000 27 28 30 MAX 0.000000 AVG 0.000000 I certify under penalty of law Chat t*is document and all attachments were prepared under the direction or supervision in accordance with a system desi gned Co assure Chat qualified personnel properl y gather and evaluate the informati on submitted. Based on my inquiry of Che person or person= who manage Che system~ or Chose persons directly responsible for gatheri ng Che information~ Che information submitted is~ to the best of my knowledge and beli ef~ true~ accurate~ and complete. I am aware that there are signi fi cant i

penalties for submitting false nformati on~ including the possi bi ty of fine and i mpri sonment for knowing violations.

li Signature of Responsible Of fici al Bate:

lv 4 f"

't e ~

O.

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 107 Unit 3 Control Bldg.

Drain MONTH November 1987 NPDES ¹ AL0022080 PARAM FLOW TSS AVG 15 30 MAX 20 100 COMMENTS UNITS MGD m /1 m /1 FREQ 1/WEEK 1/WEEK 1/WEEK 0.003200 10 0.002050 13 16 17 18 0.003090 5 20 21 22 23 24 0.001440 26 27 28 MAX 0.003200 VG 0.002445 -5 3 l certi fy under penalty of.law that this document. and all attachments were prepared under the direction or supervision in accordance wiCh a system designed to assure that quali fied personnel properl y gather and evaluate Che submitting.

information submitted. Based on my inquiry of the person or persons who manage the system~ or Chose persons di rectl y responsible for gatheri ng the information~ the information submitted is, Co the best of my knowledge and belief, true, accurate, and complete. 2'm aware. that Chere are significant penalti es for i li false nformati on,-'including the "-possibi ty of fine and imprisonment for knowi ng vi olati ons.

Si gnatur e of Pesponsible Of fi ci al Dater

%)

jyq'f

$ 14 f

'dgr I+

4~

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORINS REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 108 Diesel Bldg. Sump Units 1 5 2 MONTH MAX November FLOW 1987 15 20

'SS 30 100 NPDES 0 COMMENTS AL0022080 UNITS FREQ.

MGD 1/WEEK m /l 1/WEEK m /l 1/WEEK NO RELEASE 10 NO RELEASE 16 1'7 18 NO RELEASE 20 22 23 24 26 NO RELEASE Pl 7

28 30 MAX NO RELEASE E certify under penalty of law,that this document and all attachments'ere prepared under the direction or supervision in accordance wi th a system designed Co,assure that.,quali fied personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system~ or Chose persons directl y responsible for gathering Che information, Che information submitted is, Co the best of my knowledge and beli ef~ true, accurate~ and complete. E am aware Chat there are si gni fi cant penalties for submi tti ng false information~ including the possibility of fine and i mpri sonment for'nowi ng violations.

Si gnature of Pesponsi ble Official Bate:

1'

-l* +

Q1

~l

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 109 Diesel Bldg. Sump Unit, MONTH November 1987 NPDES 0 AL0022080 FLOW TSS AVG 30 20 " 100 COMMENTS UNITS FREQ. 1/WEEK m

1/WEEK

/l m /l 1/WEEK 5 NO RELEASE 10 12 NO RELEASE 14 17 19 NO RELEASE 20 22 25 26 NO RELEASE 27 30 AVG NO RELEASE certify under penalty,'of-.law that this document .and. all,-attachments were prepared under Che direction or supervision. in accordance with a'yst'm designed Co assure Ch'at "qual'i fied personnel properl y gather and eval uate Che information submitted. Based on my inquiry of the person or persons who manage Che system~ or Chose persons di rectl y responsible for gathering the information~ the information submi Cted is, to Che best of my knowledge and belief, true, accur ate~ and complete. I am a~are Chat there are signi fi cant penalties for submitting false information~ including the possibility of fine and imprisonment for knowi ng vi olati ons.

Si gnat ure of Responsible Official Bate:

l I

'1

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 110 Unit 1 Zc 2 0+Vice Bldg. Drain MONTH November 1'?87 NPDES ¹ AL0022080 PARAM FLOW TSS 15 30 20 100 COMMENTS UNITS m /1 m /1 FREQ. 1/WEEK 1/WEEK 1/WEEK 0.003600 10 0.000318 13 14 15 16 17 19 P\

0. 001080 46 13 (5 (5 18 SEE EXPLANATION OF 0 0 5 G NONCOMPLIANCE 25 0.000360 16 26 29 30 MAX AVG

'.003600 0.001340 12 I certi fy under penalty of.law. Chat. Chi s document- and:all -attachments were

~

prepared under the di rection- or supervi sion in accordance wi th' system designed to. assure'hat qua'li fied personnel properl y gather and evaluate the information submi tted. Based on my inquiry of the person or persons who manage the system~ or those persons directl y responsi ble for gatheri ng Che information, Che information submi tted is, to the best of my knowledge and beli ef, true, accurate, and complete. I am aware Chat there are signi ficant penalti es for submitting false information, fi ne and imprisonment for knowing vi olati ons.

i ncluding the possibi Ii ty of Si gnature o f Pesponsi bl e Official Vate:

~ ~

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BRONNS FERRY NUCLEAR PLANT DSN 111 Sewage Treatment Lagoon MONTH November 1987 NPDES 4 AL0022080 FLOW TSS BOD5 AVG MAX COMMENTS UNITS MGD m /l m /I FREQ. 5/NEEK 2/MONTH 2/MONTH RELEASE RESUMED ON 11-13-87 5

10 12 13

0. 00871 . 28 17 0.039600 0.04924S 0.024048 20 0.024048 21 22 0.031248 19 24 o.o240as 0.039600 26 0.039600 27 0.039600 28 0.031248 .

10 MAX 0.049248 57 28 0.031909 38 24 I certify, under penalty of- law Chat this- document and-all attachments were

,prepared under 'the direction or 'supervision in accordanc'e-with ".a -system desi gned to assure that qualified personnel properl y-gather and evaluate the i

information submitted. Based on my nqui ry of the person or persons who manage the system~ or Chose persons di recCl y responsi ble for gathering the i nformation~ Che information submitted is~ to Che best of my knowledge and beli ef~ true~ accurate, and complete. I am aware Chat there are signi ficant penalti es for submi Cti ng false information, including Che possibi ty of fi ne and imprisonment for knowing violations.

li 5'i gnature of Responsible Official Date:

)I Oescri tion of dischar e DSN 101 Oiffuser discharge structure - The chlorine injected into the raw cooling water and high pressure fire protection system exceeded the permitted daily maximum of 730 pounds. The amount of chlorine added on November ll, 1987 was 1,978 pounds. The chlorine (in the form of sodium hypochlorite) is injected for c'lam control and is diluted as it passes through the diffusers into the rivers.

Cause and eriod of noncom liance After initiating sodium hypochlorite injection by the plant surveillance instruction procedure a problem was encountered with one of the valves on the raw cooling water system. The procedure was discontinued but the valves were not returned to their normal configuration resulting in improperly controlled sodium hypochlorite injection. The period of noncompliance was 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and 20 minutes.

Ste s taken to reduce eliminate and revent recurrance of the noncom 1 in discharcie The plant surveillance instruction will be revised to require Chemistry support for initial valve alignment and review of caution steps for initiation of sodium hypochlorite injection. It has been reemphasized that a Site Director's Standard Practice requires that the system be returned to normal if problems are encountered with execution still of a procedure. Corrective action with regard to personnel error is being evaluated.

did Descri tion of dischar e DSN 110 Unit 1 8 2 Office Building Drain Oil and grease content exceeded the permitted daily maximum of 20 mg/1. The oil and grease content of the discharge on November 19, 1987, was 46 mg/l.

Cause and eriod of noncom liance An oil leak from the control bay chiller 1-B was the cause. The noncomplying sample was taken at 1015 hours0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.862075e-4 months <br /> on November 19, 1987. A followup sample taken at 1312 hours0.0152 days <br />0.364 hours <br />0.00217 weeks <br />4.99216e-4 months <br /> had a concentration of 13.0 mg/1. The return to compliance was verified with two additional samples of <5.0 mg/1 at 1507 and 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />. A sample taken on November ll, 1987 was in compliance. The maximum period of noncompliance" was 8 days, 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, and 17 minutes.

Ste s taken to reduce eliminate and revent recurrance of the noncom 1 in

~dischar e A routine maintenance request was filed on October 10, 1987 to repair the leak. Following an investigation of this noncompliance, an imnediate attention maintenance request was filed November 24, 1987, to have the oil -cleaned up and a drip pan placed under the leak from the chiller.