Interim Deficiency Rept Re Coped Structural Floor Beams Burned & Cut Beyond Prescribed Lines.Deficiency Is Under Continuous Evaluation.Final Rept Will Be Forwarded,If Necessary,Following Completion of Investigation
ML18031A347
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/22/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To:
References
NUDOCS 8001290378
Download: ML18031A347 (3)


Text

REGULA fURY 'ORMATION OISTRIBUTIOiV SY~ "'M (RIOS)

ACCESSION NBR e 8001290378 OOC DATE $ 80/01/22 NOTARIZED! NO DOCKET ¹ l AGILE 87 Susquehanna Steam

~

Electr ic Stationr On) t li Pennsyl va 05000~87 50 388 usquehanna Steam Blectric Stationr Onit 2r 8'ennsylva 05000388 AU ~ AUTHOH AFFILIATION CUH T '4..iv. Pennsylvanii Power 5 l.ight Co.

AEGIP ~ iVAME HE'CIPIKiVt AFl ILIAT ION

SUBJECT:

Inter im def iciency rept re coped str uctural floor beams burned L cut beyond prescr ibed lines, Deficiency is under continuous evaluation, Final rept will be forwardedrif necessaryrfollowing completion of invest'igation, DIG fRIBUTION COOK: 8019B COPIES RECEIVED:L fR +ENCL TITLE: Construction Deficiency Repoit (10CF 50,55K) 0 SIZE:

q0 pea: '5~+0 c H EC IP IKN f p8 COPIES C'Y4 'F's pp HECIPIENl COPIES IO COOK/iVAME L r TH ENCL IO CUOK/NAMC LlfR EN 1'UN: PM~M~~

~Q 15 dC 4-w~~ i

~) ~~~ i AG 14 20 LA~~A 21 AO INTEHNAI; 0 RKG F II.K 1 02 NRC VOR 0 'P5'8 2 07 KDO 4 STAFF MPA 09 OEPY DIR OPM 10 GAB 12 JOHOANrK/lK 1

i 1

ll STANDHDS i 3F IKLD OEV CQOR/IK 16 AO FOR KNGA 1 17 AO PLANT SYS i7 AO HKAG SFTY i 22 DIR DPM 23 OELD 1 AD/SIfE TECH 0 IHEC TOH OSK 1 GEOSCIENCE'H 14C SYS BH i MAlL ENG BH MECH ERG BH 1 PO'HKR SYS BH S HAiVAUKR 1 STRUCT KAlG BR EXTKHr>AL: 03 LPOR 1 04 NSIC 24 A('.HS 16 JP,g S1>980 g2 TOTAL NuMBKH OF GOP IKS HKaylHKO: L T r H ~ ENCL ng+>

TWO NORTH NINTH STREET, ALLENTOWN. PA. 18101 PHONE: (215) 821-5151 NORMAN W. CURTIS Vice President Engineering 8 Construction 821-538 I January 22, 1980 Mr. Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 18406 SUSQUEHANNA STEAM ELECTRIC STATION NOTIFICATION OF A POTENTIAL DEFICIENCY ON COPED STRUCTURAL FLOOR BEAi~lS ERs 100450/100508 FILE 840-4 PLA-443

Dear Mr. Grier:

This letter serves to confirm information provided by telephone to NRC Inspector Mr. R. Gallo on December 14, 1979. Zn that conversationr Mr.

Gallo was advised that the above subject condition was under evaluation foz reportability under the provisions of 10 CFR 50.55(e).

The condition was reported in NRC Inspection Report 50-387/79-28 and 388/79-15 which identified several coped floor beams which were burned and cut beyond pzescribed lines. Bechtel NCR 4288 was prepared on August 1, 1979 to document the noncompliances cited by the inspection as well as similar nonconformances which were subsequently noted by Bechtel Quality Control. On December'l, 1979, the nonconfozming conditions were noted in Bechtel MCAR 1-43.

The MCAR identified 123 beams supplied by Industrial Engineering Works (ZEW).

Inspection results to date indicate there have been a total of 47 beams reported as having improper radii (under radius, square cut); seven (7) as having other coping problems (overcut less than 12")2 and eight (8) beams that are not accessible.

Inspection of beams procured from other suppliers under the same specification (C16) is underway. The results of these inspections will be used to evaluate the extent and the safety implications of the conditions.

This potentially reportable deficiency is under continued evaluation by Bechtel and PP&L Engineering gzoups. We have been advised by Bechtel Engineering that they will complete their evaluation in March, 1980. Based upon the satisfactory

'Eo/9 So PENNSYLVANIA POWER 8 LIGHT COMPANY 8ottaseo

Mr. Boyce H. Grier January 22, 1980 completion of the investigation, we will advise the Commission of the date by which a final report will be submitted should the conditions be determined to be reportable.

Since the details of this report provide information relevant to the reporting recgxirement of 10 CPR 21, this correspondence is considered to also discharge any formal responsibility PPaL may have for reporting in compliance thereto.

Very truly yours, N. W. Curtis Vice President-Engineering 6 Construction PLW/ARS:mcb cc: Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P. O. Box 52 Shickshinny; Pennsylvania 18655 Mr. G. McDonald Office of Management Xnformation 6 Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Victor Stello (15)