e e
Docket Nos. 50-387 and 50-388 spp P > 1S't0 DISTRIBUTION:
DOCKET FILES (50-387/388)
NRR RDG HMB RDG FROM:
OletlCII~
OURNAIICW OATC~
MEMORANDUM FOR:
L. G. Hulman, Chief Hydrology-lleteorology Branch, DSE e
Y THRU:
ll. S. Bivins, Leader Hydrologic Engineering Section, HMB, DSE e
~
~
flyron H. Fliegel, Physical Oceanographer Hydrologic Engineering Section, HMB, DSE e
SUMECT:
MEETING llITH THEE><ECUTI',VE D,IRECTOR OF,'THE SUSQUEHANNA RiVER BASIN COMMISSIOi>
PLANT NAME:
Susquehanna Steam E'lectric Station, Units 1 and 2
LICENSING STAGE:
OL RESPONSIBLE BRANCH:
EPB82; P. Leech, EPM On Tuesday August 21, 1979, a'long with Paul Leech,-EPH and Donald Sells,
'cting Chief, EPB>~2, I met with Robert Bielo, Executive Director of the Susquehanna. River Basin. Commission (SRBC) in his office in Harrisburg,.
Our discussion concerned the several schemes put forth by, the Pennsylvania Power and Light Company.(PPSL).to meet the SRBC's regulations applicable to the Susqhebanna Nuclear Plant regarding consumptive water use'during periods of low flow.in the Susquehanna River.
The applicant (PPSL) has identified three alternatives to meeting, the.SRBC regulations:
buying storage in an existing reservoir, the most favorable being the Corps of Engineers.Cowanesque Reservoir scheduled for completion in 1980; building their our augmentation reservoir, or shutting down the plant during periods of low river flow.
The applicaot's preferred. choice is to build their own augmentation reservoir and they have filed an. environmental report for.their chosen site, Pond Hill.
Mr.. Bielo indicated that the SRBC considered that site to.be-a good one but was concerned that the proposed reservoir would only.use about.60/ of the site's reservoir potential.
The SRBC usually likes to see at least 801 development.
e Ph. Bielo stated. that discussions with PPEL concerning increased utilization of the site had already been held and the issue will be pursued further..
Additional reservoir capacity, beyond what PPSL needs, would be funded by SRBC.
90928 n M.
HRC PORM 318 (976) NRCbC 0240 Q U 4 OOVCNNllENI'NINl'INOOleleICCI I ~ 4 ~
fO ~
1 ~I
a I'
Cl TN L. G. Hulman 2
SEP 07 1979 We also discussed the other two alternatives, identified above, available to the applicant.
He agreed to try to better coordinate the review of this project by our respective agencies.
CC:
D. ttuller W. Kreger D. Sells W. Bivins t1. Fliegel P. Leech NRC PDR LPDR ACRS (17}
Original Signed bg 4L+ren H +liege~
Hyron H. Fliegel, Physical Oceanographer Hydrologic Engineering Section Hydrology-f~ieteorology Branch, DSE orrIcd~
OURIIAIId&
OATd~
DS
~ ~ I FR'l:k
...09/
. J.N......
WSBivins
...OA/.
/79
~ ~ ~ ~
T
~ ~ ~ ~ ~
~ ~ ~t/o ~ ~ ~ ~
~
~ ~ ~ ~
~ ~
~
~ ~
~ ~
~
~ ~ ~ I~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~
HRC PORN 318 (9.76) MICbf 0240 4 Uodo OOVNIINMdNTNIIINTINOOrrlcdI I ~ T ~
ldd TO ~
F y 'O'
Docket. Nos. GO-M7 and 60-388 SEP 0 V 1979 DISTRIBUTION:
DOCKET FILES (50-387/388)
NRR RDG HMB RDG f)Ef'QRANDUli FOR:
L. G. Hulman, Chief-Hydrology-Heteorology Branch, DSE H, S. Bivins, Leader Hydrologic Engineering Section, fPtB, DSE FRO~il:
f<yron H. Fliegel, Physical Oceanographer Hydrologic Engineering Section, Hf:0, DSE
SUBJECT:
YiEETING HITH THE E(ECUTIVE DIRECTOR, OF,'THE'SUS)UEHANgA RIVER OASIli'Ot";~GSSION t
t PLN<T NAIVE:
Susquehanna Steam E'lectr$ c Station, Units 1
and 2 LICENSING STAGE:
OL RESPONSIBLE BRAf HACH:
EPB>92; P. Leech, EPI)
\\ ~I t
On Tuesday August 21, 1979, along with'Paul Leech, EPU and Donald Sells, Acting Chief, EPB82, I met with Robert Bielo, Executive Director of the Susquehanna. River Basin Cmeission (SRBC) in his office in Harrisburg, Pennsylvania.
Our discussion concerned the several schemes put forth by.
the Pennsylvania Power and Light Company.(PPSL).to meet the SRBC's regulations applicable to the Susqhebanna Nuclear Plant regaeding consumptive water use during periods of low flow in the Susquehanna River.
The applicant (PPKL) has identified three alternatives to meeting.the.SRBC regulations:
buying storage in an existing reservoir, the most favorable being the. Corps of Engineers.Cowanesque Reservoir scheduled for completion in 1980; building their our augr)entation reservoir, or shutting down the plant during periods of low river flow, t
The applicaot's preferred. choice is to build tl;eir own augmentation reservoir and they have filed an.environ",wntal report for.their chosen site, Pond Hill.
lk. Bielo indicated that the SRBC considered that site to.bo a good one but was concerned that the proposed reservoir would only.use about.605 of the site's reservoir potential.
The SRBC usually likes to see at least 8(C development.
ttr..Bielo stated. that discussions with PAL'oncerning increased utilization of the site had al>eady,been held and the issue>>ill be pursued further,.
Additional reservoir capacity, beyond what PPt'L needs, would be funded by SRBC.
OItItlCd+>>
OUIINANCW
~
~
t>> ~ ~ ~tt
~
~ ~
~ ~ ~ ~ ~
~
~
~
~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
BBC PORN 918
($476) NRCSC 0240 0 U ~ OOVNNNMCNfPIIINCINO OItItICCI I ~ 1 ~
IO ~
'IOt
I' E
'I
L. G. Hulnan t
r t
'e also discussed the other l,i(o alternatives, identified above, available to the applicant, lte agreed tc.'try to hetter -coordinate the review of this project by our respective agencies.
Original SigneP byj 4dyrou H, Zliege~
k
. 'Hyron H. Fliegel, Physical Oceanographer Hydrologic Engineering Section Hydrology-meteorology Branch, DSE ccrc D. Ituller It. Kreger D. Sells U. Bivins H. Fliegel P. Leech I,RC POR LPDR ACRS (17) orrIcc~
CVRIIAMC~
OATC~
RK'8:E........
-NHF.14ogal.:Rr,
~ OQ/OS/79" ""
.....DSE93l.S.......
.....IJSB irons
."09/,......./79.