Summary of 790214 Meeting W/Util,Ge & Bechtel Re Advanced Control Room Complex & Susquehanna Simulator,In Order to Identify Any Problems Early in OL Review
ML18031A166
Person / Time
Site: Susquehanna  
Issue date: 04/10/1979
From: Miner S
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7904210073
Download: ML18031A166 (10)


Text

0 t~EETINr. SIJMMARY DISTRIBUTION Docket File NRC PDR Local PDR TIC NRR Reading LHR P3 File D. Bunch E.

Case R.

Boyd D. Vassa1lo H. Iiaomill J. Stolz R. Baer O. Parr S.

Varqa C.

He1temes L. Crocker D. Crutchfield F. Williams R. J.

Mattson R.

DeYoung Project Manager

Attorney, OELD

'.I-. Rushbrook IE (3)

ACRS (16)

R. Denise L. Rubenstein SMiner APR 10

]979 BCC:

Applicant 5 Service List H. Bassett,

'~PA S. Kari, MPA A. Abell, MPA H. Berkow, DPM A. Mathews, IAE L. Schaub, CON W. Lovelace, MPA NRC

Participants:

R. Scholl J.

Joyce R. Campbell S. Ebneter V. Thomas N. Srinivasan P.-Collins pqy pg.(oo7&

0

~A REPp Wp

+

0 UNITEDSTATES NUCLEAR REGULATORYCOMMISSION WASHINGTON, D. C. 20555 Docket Nos.

50

-388 APR 10 1979 APPLICANT:

Pennsylvania Power and Light Company FACILITY:

Susquehanna Steam Electric Station, Units No.

1 and 2

SUBJECT:

SUMMARY

OF MEETING HELD TO DISCUSS THE ADVANCED CONTROL ROOM COMPLEX FOR THE SUSQUEHANNA PLANT A meeting was held on February 14, 1979 with representatives of Pennsylvania Power and Light Company, the General Electric Company and Bechtel.

The meeting was held at PP&L's request to discuss the Advanced Control Room (ACR) Complex and to view the Susquehanna simulator.

The purpose of the meeting was to allow PP&L to provide the staff with an overview of the ACR and the opportunity to identify any problems early in the operating license review.

The attendees list is attached.

I The applicant discussed the control room layout and described the panels and consoles in the control room.

The ACR concept in time preceded the GE Nuclenet design but incorporates the GE Power Generation Control Complex (PGCC) panels in the upper and lower relay rooms.

The ECCS systems are hard wired to the control room and are not on the computer.

The computer is used for display.

As noted before the PGCC concept is used in the upper and lower relay rooms.

However the routing of cables between the relay rooms, the cable spreading rooms and the control room is designed and installed by the Bechtel Corporation.

The fire protection for these areas is also designed and installed by Becht'el.

Three vertical cable chases containing class IE and non class IE wire connect the upper and lower cable spreading rooms and the relay rooms.

The vertical cable chases are sealed at each floor.

The staff has reviewed the PGCC design for separation and fire protection, The remainder of the ACR design had not been reviewed before.

Therefore

'he fire protection and cable separation for the remainder of the ACR design, especially the vertical cable chases, are areas of concern to the staff.

I h

1 I

APR L 0 1979 The control room is on a raised floor with the cables routed in the floor.

The cabling in the floor will have to be reviewed for fire protection and separ ation.

A tour of the simulator was then conducted and the simulator panels which are the same as those for the plant were described.

Subsequently, operator training was discussed including the use of the simulator in the training program.

Enclosure:

Attendees List Sydney incr, Project Manager Light Hater Reactors Branch No.

3 Division of Project Management cc w/enclosure:

See next page

'j i

Hr. Norman W. Curtis Yice President

- L'ngineering and Construction Pennsylvania Power and Light Company 2 North Ninth Street Al 1 entown, Pennsyl vania 18101 APR Z P 19~9 CC:

Hr. Earle N. Head Project Engineering Manager Pennsylvania Power 8 Light Company 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 Jay Si lberg, Esq.

Shaw, Pittman, Potts I'rowbr I <Igr 1))00 N !itn vl., N.

W.

Washington,

0. C.

20036 Mr. William E. Barberich, Nuclear Licensing Group Supervisor Pennsylvania Power

& Light Company 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 Edward M. Nagel, Esquire General Counsel and Secretary Pennsylvania Power

& Light Company 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 Bryan Snapp, Esq.

Pennsylvania Power

& Light 'Company 901 Hamilton Street Al 1 entown, Pennsyl vani a 18101 Robert N. Gallo Resident Inspector P. 0.

Box 52 Shickshinny, Pennsyl vani a 18655

.Susquehanna Environmental Advocates c/o Gerald Schultz, Esq.

500 South River Street Wi lkes-Barre, PA 18702 Hr. Robert J. Shovlin Project

Manager, Pennsylvania Power and Light Co.

2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 Alan R.

Yuspeh, Esq.
Shaw, Pi ttman, Potts Trowbri (Iqv I))0() N NI.r< nI,, N.

W.

Wash I ngton, I)

C ~

20036 Dr. Judith H. Johnsrud Co-Director Environmental Coalition on Nuclear Power 433 Orlando Avenue State College, PA 16801 Nr. Thomas H. Gerusky, Director Bureau of Radiation Protection Department of Environmental Resources Commonwealth of Pennsylvania P. 0.

Box 2063 Harrisburg, PA 17120 Ns. Colleen Harsh Box 538A, RDP4 Mountain Top, PA 18707 Hrs. Irene Lemanowicz, Chairperso The Citizens Against Nuclear Dangers P. 0.

Box 377 RDgl

Berwick, PA 18503

l' 4

\\

'I I,

ENCLOSURE B

ATTENDEES LIST NRC S. Hiner R. Scholl J.

Joyce R.

Campbell S.

Ebneter V.

Thomas H. Srinivasan P. Collins PP&L G.

Adams E. Carlson A. Derkacs D. Parsons W. Barberich J.

Graham T. Jenkins W. Bohner II Bechtel A. Bi ses ti GE J. Nillard