ML18031A094

From kanterella
Jump to navigation Jump to search
Forwards Summary of 781205 Visit to Discuss Site Meteorology,Foundation Engineering,Accident Analysis & Emergency Plans.Individual Tour Repts & List of Attendees Encl
ML18031A094
Person / Time
Site: Susquehanna  
Issue date: 01/26/1979
From: Miner S
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18031A096 List:
References
NUDOCS 7902260064
Download: ML18031A094 (5)


Text

4 N 26 19l9 Docket Hos.

50-387 and 50-388 APPLICANT:

Pennsylvania Power and Light Company (PPRL)

FACILITY:

Susquehanna Steam Electric Station Unit Nos.

1 and 2

SUBJECT:

SUMttARY OF VISIT TO SUS(UEHANNA SITE ON DECEMBER 5, 1978 The Susquehanna site was visited on December 5, 1978 to discuss site meteorology, foundation engineering, accident analysis and emergency plans and to observe the related site features.

The meeting attendees are listed in Enclosure l.

Initially a brief discussion was held on the status of the facility and the agenda for the remainder of the visit.

Subsequently, the staff and the applicant's representatives split into smaller groups depending on interest and discipline.

Each group then visited the portion of the site and plant of interest to that group.

Enclosed as Enclosures 2,

3 and 4 are reports on the individual tours.

tlhen the individual tours were completed a joint tour was made of the facility.

In conclusion, a meeting was held where questions that arose as a result of'he site visit were discussed.

Round 1 questions on meteorology, foundation engineering, accident analysis and emergency plans were also discussed.

grlgiAal slgll86 bIt S~iugsj Mmer Sydney Miner, Project Manager Light plater Reactors Branch No.

3 Division of Project Management

Enclosures:

As Stated cc w/enclosures:

See next page 790 2260CIlog

~0P-~

r pe ORRICCW CURNAMI 97'ATR~

1/gb /79 1/~ /79

..Vm../Q.;LPt

...LNP+@PK.....

SMiner/LLM ODPar r

~ o ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~

NRC PORM 518 (9-76) NRCM 0240

  • V4 OOVOIINMCIIZRRIHTIN4 ORRICCI I777 7 ~I

' 0 ~

~ 0 ~

~

1 7

1 F

~

I "I II l>

PR

. v I

h

MEETING

SUMMARY

DISTRIBUTION JAN P g lgyg Docket Fil e NRC PDR Local PDR TIC NRR Reading LWR 83 File E.

G.

Case R.

S.

Boyd D.

B. Vassallo W. Gammill J. Stolz R. Baer

0. Parr S.

Varga C. Heltemes D. Crutchfield F. Williams R. J.

Mattson R;

DeYoung Project Manager SMiner

Attorney, ELD M. Rushbrook IE (3)

ACRS (16)

L. Rubenstein R. Denise NRC Partici ants:

W. Thompson R. Trevino

0. Corley G. Ferrell L. Andrews C.

Van Niel BCC:

Applicant 5 Service List

Hr. Norman W. Curtis Vice President - Engineering and Construction Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 JAN 2 6 1979 CC:

Hr. Earle M. Mead Project Engineering Hanager Pennsylvania Power

& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Jay Silberg, fsq.

Shaw, Pittman, Potts 8

Trowbridge 1800 H Street, N.

W.

Washington, D. C.

20036 Mr. William E. Barberich, Nuclear Licensing Group Supervisor Pennsylvania Power 8 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Edward H. Nagel, Esquire General Counsel and Secretary Pennsylvania Power

& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Bryan Snapp, Esq.

Pennsylvania Power 8 Light Company 901 Hamilton Street Allentown, Pennsylvania 18101 Robert H. Gallo Resident Inspector P. 0.

Box 52 Shickshinny, Pennsylvania 18655 Hr. Robert" J. Shovlin Project Manager Pennsylvania Power and Light Co.

2 North Ninth Street Allentown, Pennsylvania 18101

ENCLOSURE 1

ATTENDEES LIST NRC S. Miner W. Thompson R. Trevino D. Corley G. Ferrell L. Andrews C.

Van Niel PP8L W. Barberich T. Gangloff M. Gorski R.

McNamara P. Collopy R. Gallo Danes 5 Moore J. Martin