Summary of 781128 Meeting W/Util Re Review Schedule for Subj Facility.Util Felt That May 1980 Fuel Load Date Would Be Met.Nrc Agreed to re-evaluate Review Schedule After First Round Questions & Rept of Caseload Forecast Panel
ML18031A071
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/03/1979
From: Miner S
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7901110191
Download: ML18031A071 (5)


Text

I JAN gg

)gag V'

Docket Nos.

50-38 and 50-388

'PPLICANT:

Pennsylvania Power and.Light Company (PP&L)

FACILITY:

Susquehanna Steam Electric Station Units 1

and 2

SUBJECT:

SUMMARY

OF HOVEflBER 28, 1978 MANAGEMENT MEETING CONCERNIHG THE SUSQUEHANNA REVIEW SCHEDULE The licensing schedule prepared for the.Susquehanna OL application was based on the Caseload Forecast Panel's estimate that the 'fuel load date for Susquehanna Unit Ho.

1 will be December 1980.

The applicant!s fuel load.date 'is Nay 1980.

A'management meeting was held at the request of "

the applicant to discuss the HRC licensing schedule.

The attendees list is enclosed.

The applicant at the time of the Ca'seload Forecast Panel Meeting in 'May 1978 recognized that their May 1980 fuel load date was slipping.

Therefore.its allocated additional resources hand renegotiated various contracts in order to meet the Nay 1980 date.

Since then installation rates for various materials such as conduit, wire and cable ect.,

has increase substantially.

PP&L now feels fairly-confident that the May 1980- fuel load date will be met. -

't indicated that it will be re-evaluating its schedule late this spring.

We agreed to re-evaluate the review schedule to assure that the licensing and construction schedules are compatible after (1) the first round questions are complete, (2) the applicant has assessed when the responses to the questions will-be provided and (3) the Caseload Forecast Panel in March or April updates its evaluation of the construction schedule.

Original Sig d 3 S. Miner sydney Niner, Project Hanager-gight Water Reactors Branch Ho.

3 Division of Project Management

Enclosure:

As stated ccs w/enclosure:

See next page

>Bokkko ~q (

'PFICC~

eQRNAMC~

DATCW LWg P3:L SNiner:c M7"j /7Q LW 3" BC OParr g/">""i78""

~ ~ 1

~

~

\\ ~ ~ ~ ~

~ ~

Y 0

NRC FORM 518 (9-76) NRCM 0240 x "u.s. aovasNMCNl'RJHTINO oltlCC; 10)l N$ - 74'

0 J

~

it E

Mr. Norman W. Curtis Vice President - Engineering and Construction Pennsylvania Power and Light Company, 2 North Ninth Street Allentown, Pennsylvania 18101 CC:

Mr. Earle H. Head Project Engineering Manager Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Jay Silberg, Esq.

Shaw, Pittman, Potts 8

Trowbridge 1800 M Street, N.

W.

Washington, D. C.

20036 Mr. William E. Barberich, Nuclear Licensing Group Supervisor Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Edward M. Nagel, Esquire General Counsel and Secretary Pennsylvania Power 8 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Bryan Snapp, Esq.

Pennsylvania Power 8 Light Company 901 Hamilton Street Allentown, Pennsylvania 18101 Robert M. Gallo Resident Inspector P. 0.

Box 52 Shickshinny, Pennsylvania 18655 Hr. Robert J. Shovlin Project Manager Pennsylvania Power and Light Co.

2 North Ninth Street Allentown, Pennsylvania 18101

ENCLOSURE NRC R.

Boyd

0. Parr S. Miner D. Vassallo F. Schroeder
  • D. Ross ATTENDEES LIST PPSL W. Barberich W. Bohner N. Curtis R. Mozzine
  • Part time atte'ndance

t.

I