Requests NRC Review & Concurrence W/United Engineers & Constructors Rept, Interim Evaluation of Cable Tray/ Supports for Browns Ferry Nuclear - Unit 2. Rept Submitted Separately
ML18030B300
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 05/02/1986
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To: Muller D
Office of Nuclear Reactor Regulation
References
NUDOCS 8605120369
Download: ML18030B300 (6)


Text

REGULATOR NFORVATION DISTRIBUTION TEN (RIDS)

ACCESSION NBR: 8605120369 DOC. DATE: 86/05/02 NOTARIZED:

NO DOCKET ¹ FACIL:50-259 Brotons Fev v g Nucleav Power Stations Unit ii Tennessee 05000259 50-260 Brogans Fev v g Nucleav Power Stations Unit 2i Tennessee 05000260 50-296 Brogans Ferv g Nuc leav Power Station.

Unit 3.

Tennessee 05000296 AUTH. NAXE AUTHOR AFFILIATION'RI DLEYt R.

Tennessee Valleg Authov itg RECIP. NANE RECIPIENT AFFILIATION NUL'LERiD. R.

BMR ProJect Div ectorate 2

SUBJECT:

Requests NRC review Cc concuvv ence s/United Engineers Sr

~..

Constv'uctov s v ept.

"Interim Evaluation of Cable Trag/

Supports for Bv own's Ferrg Nucleav Unit 2." Rept submitted sepav atelg.

DISTRIBUTION CODE:

A001D COP IES RECEIVED: LTR ENCL TITLE:

OR Submittal:

Genev al Distv ibution SI ZE-NOTES; NESS/FCAF 1 cg.

NESS/FCAF/PN 1 c g.

OIA 1 c g.

GROTENUIS, 5 1 c g.

05000259 N>SS/FCAF icg.

NNSS/FCAF/PN icg.

OIA 1 cg.

GROTENHUIS> 5 icg.

05000260 N>SS/FCAF icg.

NNSS/FCAF/PN icg.

OIA icg.

GROTENHUIS, 5 icg.

05000296 RECIP IENT ID CODE/NAl'1E BMR ADTS BMR EICSB BMR PD2 PD 01 BMR PSB COP IEB LTTR E C

1 2

1 L

RECIP IENT ID CODE/NANE BMR EB BMR FOB CLARKE R BMR RSB COP IES LTTR E 1

1 CL INTERNAL: ACRS ELD/HDS4 NRR/GRAS RQN2 EXTERNAL: 24X LPDR NSIC NOTES:

09 03 05 6

1 0

0 1

1 1

1 1

1 1

ADN/LFNB NRR/ 8 SCB ILE 04 EQRQ BRUSKEi 8 NRC PDR 02 TOTAI NUNBER OF COPIES REQUIRED:

LTTR 34 ENCL

II 4

1

~ H,t 4

tl

~ ltl I

H H

F f

'41 4 <1 [fj p I

4 fg j/<4

'I L',A~

~ g+

H Pfj

~4,f ".

414 "I

jj,,'g fftt'

$ lt Fitful,'

'1$

I A

I F'4 4

I' it 4 I 4

Jtt tie 4

~

tt j

H

$ ~

riff) t I

fi

',4 4

4 I

~H(

)H,,

'I fftj ii Q>>

ff lt I

HHg H

K1 4H tf 41 jf f't ~

J Nl)

I' HH'

', tt(H$ $

tff P[t" P

F 'I4,(3

\\ ~

I'4 I

F

'~l

]g~>, I)", rf H4J F', t 4

H 14 44'

1 l

TENNESSEE VALLEYAUTHORITY CHATTANOOGA. TENNESSEE 37401 5N 157B Lookout Place May 2, 1986 Director of Nuclear Reactor Regulation Attention:

Mr. D. R. Muller, Project Director BWR Project Directorate No.

2 Division of Boiling Water Reactor Licensing U.S. Nuclear Regulatory Commission, Washington, D.C.

20555

'ear Mr. Muller:

I In the Matter of the Tennessee Valley Authority Docket Nos.

50-259 50-260 50-296 Submitted under separate cover is a copy of the five-volume United Engineers and Constructors (VEDIC) report entitled, "Interim Evaluation of Cable Tray/Supports for BFN-Unit No. 2."

VEDIC was contracted by TVA to review and evaluate all the supports in units 1, 2, and 3 essential to unit, 2 and nonessential supports in the three units whose failure could affect systems or components essential to unit 2.

The program included field walkdowns, calculations, and development of acceptance criteria to provide a reasonable level of assur'ance that the cable tray/supports would maintain structural integrity and functionality during a Design Basis Event.

(DBE).

As a result of their evaluations, 14 modifications have been proposed and are described in the report.

We request NRC review this report and provide their concurrence of the proposed program for providing interim qualification of cable tray/supports for restart of unit 2 from the present cycle 5 outage.

This program was discussed with the NRC staff in a meeting on October 23, 1985 at Browns Ferry.

Because of the size of this report, the copy has been sent directly to the NRC-BFN Project Manager.

If you have any questions, please get in touch with Mike Hellums at FTS 858-2695.

Very truly yours, TENNESSEE VALLEY AUTHORITY R,

G idley, D

ector Nuclear Safet and Licensing cc:

see page 2

8605120369 860502 PDR ADQCK 05000255' PDR An Equal Opportunity Employer

r 1'

Director of Nuclear Reactor Regulation May 2, 1986 CC:

Mr. R. J. Clark U.S. Nuclear Regulatory Commission Browns Ferry Project Manager 7920 Norfolk Avenue

Bethesda, Maryland 20814 U.S. Nuclear Regulatory Commission Region II ATTN:

Dx. J. Nelson Grace, Regional Administrator 101 Marietta Street, NM, Suite 2900 Atlanta, Georgia 30323