ML18030B174
| ML18030B174 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 02/26/1986 |
| From: | Muller D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML18030B175 | List: |
| References | |
| DPR-33-A-127, DPR-52-A-122, DPR-68-A-098 NUDOCS 8603120334 | |
| Download: ML18030B174 (14) | |
Text
~
~p,8 REO(g~
(4 0
fy I
0O cO Ce
+**++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-259 BROMNS FERRY NUCLEAR PLANT UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 127 License No.
DPR-33 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for:amendment by Tennessee Valley Authority (the
. licensee) dated December 21, 1984, as superseded November 5, 1985 complies with the standards and requirements of, the Atomic Energy Act of 1954, as amended (the Act), and the Gommission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; I
C.
D.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public-, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C(2) of Facility Operating License No.
DPR-33 is hereby amended to read as follows:
8603l20334 860226 PDR ADOCK 05000259 PDR
(2)
Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 127, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective ninety days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Daniel R. Muller, Director BWR Project Directorate ¹2 Division of BWR Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance:
February 26, 1986
ATTACHMENT TO LICENSE AMENDMENT NO. 127 FACILITY OPERATING LICENSE NO.
DPR"33 DOCKET NO. 50-259 Revise Appendix A as follows:
C 1.
Remove the following pages and replace with identically numbered pages.
338 2.
The marginal lines an these pages denote the area being changed.
- 6. 0 ADMINISTRATIVE'ONTROLS 6.3 Procedures A.
Detailed written procedures, including applicable checkoff lists covering items listed below shall be prepared, approved and adher-ed to.
1.
Normal startup, operation and shutdown of the reactor and of all systems and components involving nuclear safety of the facility.
2.
Refueling operations.
3.
Actions to be taken to correct specific and foreseen potential
'alfunctions of systems or components, including responses to
- alarms, suspected primary system leaks and abnormal reactivity changes.
4.
Emergency conditions involving potential or actual release of radioactivity.
5.
Preventive or corrective maintenance operations which could have an effect on the safety of the reactor.
(
6.
Surveillance and testing requirements.
7.
Radiation control procedures.
8.
Radiological Emergency Plan implementing procedures.
9.
Plant security program implementing procedures.
10.
Pire protection and prevention procedures.
- 11. -Limitations on the amount of overtime worked by individuals performing safety-related functions in accordance with the NRC policy statement on working hours (Generic Letter No. 82-12).
B.
Written procedures pertaining to those items listed above shall be reviewed by PORC and approved by the plant superintendent prior to implementation.
Temporary changes to a procedures which do not change the intent of the approved procedure may be made by a member of the plant staff knowledgeable in the area affected by the pro-cedure except that temporary changes to those items listed above except item 5 require the additional approval of a member of the plant staff who holds a Senior Reactor Operator license on the unit affected.
Such changes shall be documented and subsequently re-viewed by PORC and approved by the plant superintendent.
Amendment No.
127 338
AS REgy P
+
0 Cy
- 0O
++*++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-260 BROWNS FERRY NUCLEAR PLANT UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
122 License No.
DPR-52 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Tennessee Valley Authority (the licensee) dated December 21, 1984, as superseded November 5, 1985 complies with the standards and requirements of, the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
D.
E.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
'Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C(2) of Facility Operating License No.
DPR-52 is hereby amended to read as follows:
(2)
Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.'22, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective ninety days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Daniel R. Muller, Director BMR Project Directorate ¹2 Division of BMR Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance:
February 26, 1986
ATTACHMENT TO LICENSE AMENDMENT NO. 122 FACILITY OPERATING LICENSE NO.
DPR-52 DOCKET NO. 50-260 Revise Appendix A as follows:
1.
Remove the following pages and replace with identically numbered pages.
338 2.
The marginal lines on these pages denote the area being changed.
- 6. 0 ADMINISTRATIVE'CONTROLS 6.3 Procedures A.
Detailed written procedures, including applicable checkoff lists covering items listed below shall be prepared, approved and adher-ed to.
1.
Normal startup, operation and shutdown of the reactor and of all systems and components involving nuclear safety of the facility.
2.
Refueling operations.
3.
Actions to be taken to correct specific and foreseen potential malfunctions of systems or components, including responses to
- alarms, suspected primary system leaks and abnormal reactivity 4
changes.
4.
Emergency conditions involving potential or actual release of radioactivity.
5.
Preventive or corrective maintenance operations which could have an effect on the safety of the reactor.
I I
(
6.
Surveillance and testing requirements.
7.
Radiation control procedures.
8.
Radiological Emergency Plan implementing procedures.
9.
Plant security program implementing procedures.
10.
Pire protection and prevention procedures.
- 11. -Limitations on the amount of overtime worked by individuals performing safety-related functions in accordance with the NRC policy statement on working hours (Generic Letter No. 82-12).
B.
Written procedures pertaining to those items listed above shall be reviewed by PORC and approved by the plant superintendent prior to implementati'on.
Temporary changes to a procedures which do not change the intent of the approved procedure may be made by a member of the plant staff knowledgeable in the area affected by the pro-cedure except that temporary changes to those items listed above except item 5 require the additional approval of a member of the plant staff who holds a Senior Reactor Operator license on the unit affected.
Such changes shall be documented and subsequently re-viewed by PORC and approved by the plant superintendent. "
Amendment No.
122 338
~S REGS
~o Cy Cl C
O cA O~
Cp r+
gO
+**++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-296 BROWNS FERRY NUCLEAR PLANT UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 98 License No.
DPR-68 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Tennessee Valley Authority (the licensee) dated December 21, 1985, as superseded November 5, 1985, complies with the standards and requirements of, the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
D.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C(2) of Facility Oper ating License No.
DPR-68 is hereby amended to read as follows:
(2)
Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.
98, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective ninety days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Daniel R. Muller, Director BMR Progject Directorate 02 Division of BMR Licensing Date of Issuance:
February 26, 1986
ATTACHMENT TO LICENSE AMENDMENT NO.
98 FACILITY OPERATING LICENSE NO.
DPR-68 DOCKET NO. 50-296 Revise Appendix A as follows:
1.
Remove the following pages and replace with identically numbered pages.
368 2.
The marginal lines on these pages denote the area being changed.
6.0 ADMINISTRATIVE'CONTROLS 6.3 Procedures A.
Detailed written procedures, including applicable checkoff lists covering items listed below shall be prepared, approved and adher-ed to.
I 1.
Normal startup, operation and shutdown of the reactor and of all systems and components involving nuclear safety of the facility.
2.
Refueling operations.
3.
Actions to be taken to correct specific and foreseen potential malfunctions of systems or components, including responses to
- alarms, suspected primary system leaks and abnormal reactivity changes.
4.
Emergency conditions involving potential or actual release of radioactivity.
5.
Preventive or corrective maintenance operations which could have an effect on the safety of the reactor.,
6.
Surveillance and testing requirements.
7.
Radiation control procedures.
8.
Radiological Emergency Plan implementing procedures.
9.
Plant security program implementing procedures.
10.
Pire protection and prevention procedures.
ll. Limitations on the amount of overtime worked by individuals performing safety-related functions in accordance with the NRC policy statement on working..hours (Generic Letter No. 82-12).
B.
Qritten procedures pertaining to those items listed above shall be reviewed by PORC and approved by the plant superintendent prior to implementation.
Temporary changes to a procedures which do not change the intent of the approved procedure may be made by a member of the plant staff knowledgeable in the area affected by the pro-cedure except that temporary changes to those items listed above except item 5 require the additional approval of a member of the plant staff who holds a Senior Reactor Operator license on the unit affected.
Such changes shall be documented and subsequeqgly re-viewed by PORC and approved by the plant superintendent.
Amendment No. 98 368