ML18030B042
| ML18030B042 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 01/28/1986 |
| From: | Gridley R TENNESSEE VALLEY AUTHORITY |
| To: | Muller D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8602040167 | |
| Download: ML18030B042 (6) | |
Text
REGULATORY 'RMATION DISTRIBUTION SY (RIDS)
ACCESSION NBR: 8602040167 DOC. DATE: 86/01/28 NOTARIZED: YES DOCKET 0 FACIL: 50-259 Browns, Ferry Nuclear Power Stationi Unit iI Tennessee 05000259 50-260 Browns Ferry Nuclear Power Stationi Unit 2.
Tennessee 05000260 50-296 Browns Ferry Nuc lear Power Station>
Unit 3s Tennessee 05000296 AUTH. NAME -,
AUTHOR AFFILIATION GRIDLEYIR.L., Tennessee Valley Authority REC IP. NAME RECIPIENT AFFILIATION MULLERID.
BWR Prospect Directorate 2
SUBJECT:
Documents understanding re 10CFR50. 54(m) requirements fol operator staffing in current configuration. Unlicensed operators will e substituted as need arises to facilitate current operator training 8c requalif ication programs.
DISTRIBUTION CODE:
MOOSD COPIES RECEIVED: LTR J ENCL D SIZE:
TITLE: Operator Requalification Program NOTES:NMSS/FCAF icy.
icy NMSS/FCAF/PM.
OL: 06/26/73 NMSS/FCAF icy.
icy NMSS/FCAF/PM.
OL:06/28/74 NMSS/FCAF icy.
ice NMSS/FCAF/PM.
OL: 07/02/76 05000259 05000260 05000296 REC IP IENT ID CODE/NAME BWR PD2 PD COPIES LTTR ENCL RECIPIENT ID CODE/NAME CLARKE R COPIES LTTR ENCL INTERNAL: ACRS as 10 NRR/DHFT/MTB 1
RGN2 1
NRR/DHFT/HFIB IL 04 EXTERNAL: 24X NRC PDR NOTES:
LPDR NSIC 03 05 TOTAL NUMBER OF COPIES REQUIRED:
" LTTR 22 ENCL
c
)N;,)N H
P I
l HH,. >>I )
'II'4
~H I"
~h
~
H h
P II Ha N
)
lil'H,P 0 )I, I
I'a)H)
<)
',l l ~ Q
~ I IH)
H i
H ~ H H
~ i Cttt)).H "jk>>
I H ~
f lf I
P "i p S)
P
TENNESSEE VALLEYAVTHORITY CHATTANOOGA, TENNESSEE 37401 5N 157B Lookout Place J
f January 28, 1986 Director of Nuclear Reactor Regulation Attenti.on:
Mr. Dan Muller, Project Director BWR Project Directorate No.
2 Division of Boiling Water Reactors (BWR)
U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Muller:
In the Matter of the Tennessee Valley Authority Docket Nos.
50-259 50-260 50-296 This letter is to document our understanding regarding, the requirements of 10 CFR 50.54(m) for operator staffing at Browns Ferry in our current configuration.
Presently the unit 1 and 2 reactors are defueled and unit 3 is in cold shutdown with the vessel head on.
From a review of 10 CFR 50.54(m), section 6.8 of the Browns Ferry technical specifi.cations, and discussions with your staff, we conclude that, the common unit 1 and 2 control rooms need not be continuously manned with licensed personnel.
It is our intent to substitute unlicensed operators as the need arises on the defueled units in order to facili.tate current operator training and requalification programs.
Unit 3 will remain staffed with licensed operators as requi.red by 10 CFR 50.54(m).
Specifically, the minimum staffing will consist of a licensed reactor operator in the unit 3 control room and a
senior reactor operator on the site.
Normal staffing levels will be reestablished when fuel reloadi.ng operations resume on units 1 and 2.
If your understanding is different, please get in touch with us immediately or telephone Bob Alsup at FTS 858-2725.
Very truly yours, TENNESSEE LEY AUTHORITY Subsceibed
~worn to efore me, on hi
~da f
-1986.
R.. Gridl y Manager of icensing Notary'ublic My Commission Expires cc:
see page 2
,T 8602040167 860 025/
P An Equal Opportunity Employer
'a
<<Vr<<
1
~ 6 4
filar "
L VN Xrl' 4 )f'.I
'l ~
)) '1>>
4':,)
~ tl gK.
l, I'4 4)
~ g l(>>P a
>>r)f>lff')f<<
1P, V
a
) 'I I+ 44 (p )4 I )Vl ff"
~
I W
V f
~.f 1
4 ~ )1)
~ lr LV 4'j>>
I 'Ir 1
glj' gl r, I,
1 )
)
Ir 1
f
)I a a)l)
I I ~
ff "a - f f>'f ffVfl Il f "
<<if<4 f V>> jf Fl, 4 P'f 1 4)fill I
~
i>fj>>
I j
A I '
fr>> ~
Vfj 'a<<
Vr) rt 4
"1 1 f>>
1 ~ I a
Q If
>> f,) 4>>
4'V 4
I' p
t t f 1
) I 1 '"
4 f Ii)
~
lj'f vl I f"
.)f 4<<)
'rv" ',
<<lrfj))
4 1) f >>1
., f f ',>
~
i a
5 1, Pv)ll )
1fvv P
)I't vv rl', >>),)
I vP I jl 44,,'))I,fa ~
"f l
)
V)
I )f, lf
'r,rl fil ar lr)V)',V<<)VVl,'
f a,'1'1 "rf,vg,,
1,'<<
', ji,>> )f")vjrfrl,ffl,,
Vf,ji"I 4
I lr
)
Vr, 4
'>><<I
)
fP I ," 'l I
tr
'f
'I I
If It IV
<<ji f lf f
)
V f ~
'I 1)'
I)"
4 )
r
. fr f>>
~ r,vrga
) ~ (44)vvf I
'. I I
'V 1>> <<,'i
~ >>1 1 Irj>>
'1 f
.'4 11
~ >>V,(
1>>
4 fl~
f <<>>*'fl) Ij<<it',rf >>,>I.'
I"V>>I" "glffjtg a
f"" f f Iaaf
'<<"f
'4 tr V fj R fa a,','
V<<g Pf 4 Vll
) j,f l >>"Iff)t<<1' P
1
~
4 ff '>, l fV'l.Pf
'VII 4
""vj
Director of Nuclear Reactor Regulation January 28, 1986 cc:
Mr. R. J. Clark U.S. Nuclear Regulatory Commission Browns Ferry Project Manager 7920 Norfolk Avenue
- Bethesda, Maryland 20814 U.S. Nuclear Regulatory Commission Region II ATTN:
Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NM, Suite 2900 Atlanta, Georgia 30323
0 ik h
II I '
g
)
I t