tf~DUKE Joe Donahue
~JENERGY Vice President Nuclear Engineering 526 S. Church Street Charlotte, NC 28202 980-373-1758 Joseph.Donahue@duke-energy.com Serial: NPD-NRC 2018-003 10 CFR 52, Appendix D, X.B January 25, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 SHEARON HARRIS NUCLEAR POWER PLANT, UNITS 2 AND 3 DOCKET NOS.52-022 AND 52-023 AP1000 COMBINED LICENSE APPLICATION DEPARTURE REPORT UPDATE Ladies and Gentlemen:
Duke Energy Progress, Inc. (DEP) submitted an application, dated February 18, 2008, for a combined license for two AP1000 advanced pressurized water reactors to be located at the Shearon Harris Nuclear Power Plant Site. Part 7 of the application is entitled "Departures and Exemption Requests."
The purpose of this letter is to provide an update to the report describing plant-specific departures from the AP1000 Design Control Document (i.e., Departures Report) as required by 10 CFR 52, Appendix D, paragraph X.B.1 and X.B.3.b.
There have been no new departures or changes to the departures described in the Harris Nuclear Plant, Units 2 and 3, COLA Part 7, "Departures and Exemption Requests" for the period of July 1, 2017 to December 31, 2017.
If you have any questions, or need additional information, please contact me or Erik Wagner at (704) 382-3949.
Sincerely,
~'-.:>.~
Joseph Donahue Vice President - Nuclear Engineering cc: U.S. NRC Region II, Regional Administrator U.S. NRC Resident Inspector, SHNPP Unit 1 Mr. Brian Hughes, U.S. NRC Project Manager