ML18030A556

From kanterella
Jump to navigation Jump to search
Levy Nuclear Plant, Units 1 and 2 - Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departures
ML18030A556
Person / Time
Site: Levy County
Issue date: 01/25/2018
From: Donahue J
Duke Energy Corp
To:
Document Control Desk, Office of New Reactors
References
NPD-NRC-2018-002
Download: ML18030A556 (1)


Text

e(~DUKE Joe Donahue

~ ENERGYQ! Vice President Nuclear Engineering 526 S. Church Street Charlotte, NC 28202 980-373-1758 Joseph.Donahue@duke-energy.com Serial: NPD-NRC-2018-002 1_0 CFR 52, Appendix D, X.B January 25, 2018 10 CFR 50.59 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 LEVY NUCLEAR PLANT, UNITS 1 AND 2 COMBINED LICENSE NOS. NPF-99 AND NPF-100 DOCKET NOS.52-029 AND 52-030

SUBJECT:

REPORT OF 10 CFR 50.59 CHANGES, TESTS AND EXPERIMENTS AND 10 CFR 52 APPENDIX D DEPARTURES This submission is made with regard to the Levy Nuclear Plant (LNP), Units 1 and 2, in accordance with the reporting requirements of 10 CFR 50.59(d)(2) and 10 CFR 52, Appendix D, paragraphs X.B.1 and X.B.3.b.

For the period July 1, 2017 through December 31, 2017, there were no changes, tests or experiments made pursuant to 10 CFR 50.59(c) for LNP Units 1 and 2.

For the period of July 1, 2017 through December 31, 2017, there were no new plant-specific departures for LNP Units 1 and 2.

This letter contains no new regulatory commitments.

If you have any questions, or need additional information, please contact me or Erik Wagner at (704) 382-3949.

Sincer~ '---7~

Joe Donahue Vice President - Nuclear Engineering cc: U.S. NRC Region II, Regional Administrator Mr. Brian Hughes, U.S. NRC Project Manager