ML18030A314

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Changes to Control Room Habitability Sys Two Envelope Concept.Single Envelope Design Meets Applicable NRC Regulations.Changes to Appropriate FSAR Sections Are Being Prepared
ML18030A314
Person / Time
Site: Susquehanna  
Issue date: 06/15/1981
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
10CFR-050.55E, 10CFR-50.55E, PLA-839, NUDOCS 8106230358
Download: ML18030A314 (3)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

AC C E S S I0 N > N B R '! 8 1 0 6 2 3 0 35 8 D0 C ~ D AT E '!

8 1 / 0 6'/ 1 5 N0 T A R IZE D N0, D0 C KKT' FACILc50 387 Susquehanna Steam Electrfc Statfoni Unft i~ Pennsylva 05000387

. 50 388 Susquehanna Steam Electrfc StatfonE Unft 2'P Pennsylva AUTH;NAPE'UTHOR AFFILIATION CURTIS<I ~ W, Pennsylvanfa Power

& Lfght" Co+

RECIP ~ NAME!

RECIPIENT AFFILIATION SCHWENCERPA ~

Lfcensfng Branch 2

SUBJECTS Interfm deffcfency reot re, changes to control room!

habftabflfty sys two envelope conceptsSfng1e envelope~ desfgn<

meets applfcaole, NRC.r egulatfons

~ Changes to approprfate FSAR'ectfons ar e being prepat ed.

DISTRIBUTION CODE<

SODIS COPIES RECEIVED:LTR J 'NCL J SIZE:

f.'.

TITLE~ PSAR/FSAR AMDTS and Rel ated Co( respondence NOTES:Send I&K' copies FSAR' all amends,i cytBWR LRG PM(L ~ RIB) 05000387 Send I&K' copfes FSAR

& all amends,i cytBWR LRG PM(LORIB) 05000388 RKC IPIKNT

'D CODE'/NAMKi ACTION:

A/D LICENSNG LIC" BR ¹2'A INTERNAL'CCID EVAL BR26'HER ENG BR 11<

CORE PERF BR 10 KMERG PRKP 2?'MRG PRP LIC 36 FK.'lA REP DIV 39 HUM FACT'NG ~0 I&C SYS BR ib'IC'UID BR 33 MATL ENG, BR 17 MPA OELD=

POWER SYS BR 19.

QA BR 21<

REAC SYS BR 23.

SIT ANAL BR 2O COPIES LTTR ENCL' 0

1 0'

1 1

1 1

1 0

3 3

1 1

1 1

i 1

1 1

1 1

0 0

1 1

1 1

1 1

RECIPIENT'D CODE/NAHK'IC'R. ¹2'C STARK'g R',

00 AUX SYS BR'7 CONT SYS BR 09 EFF TR SYS BR12 KMRG PRP DEV 35 KQUIP QUAI BR13 GEOSCIENCKS 28 HYD/GEO'R 30 I&E'6 LIC'UAL'"BR'2 4!ECH'NG BR 18 NRC PDR 02'P LIC BR'4 PROC/TST'.REV 20 R 'SS BR22'G FIL 01 ENG BR25 COPIES'TTR'NCL 1

0 1

1 1

1 1

1 1

1 1

1 3

3 2

2 2'

3 3

1 1

1 1

1 1

1 1

1 1

EXTERNAL! ACRS NSIC 41 05 16 16 1=

LPDR 03.

1 1

gN 8 5 1981 b'9 TOTAL NURSER OF COPIES REQUIRED<

LTTR ~

ENCL

C

~

~

A TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEr (2'I 5) 770-5151 NORMAN Vl. CURTIS Vice President-Engineering rt Construction-Nuclear 770 5381

)JUN 15 l%3 Mr. A. Schwencer, Chief Licensing Branch No.

2 division of Project Management U.S. Nuclear Regulatory Commission Washington, D.C.

20555 SUSQUEHANNA STEAM ELECTRIC STATION

~

CONTROL ROOM HABITABILITYSYSTEM ER 100450 PILE 841-2 PLA-839 Reference PLA-830, Curtis to Grier dated 6/5/81 (attached)

Dear Mr. S'chwencert The above referenced document provided an interim report regarding potential reportability, under 10CFR50.55e,. of changes to the Control Room habitability system two envelope concept.

These changes involve elimination of the dual pressure differential envelope concept to ensure habitability inside the Control Room and Control Structure.

In the revised design, cross flow between the Control Room and the Control Structure has no significance since both are included in the same envelope.

Current evaluations of the Control Structure habitability system including recalculations of Control Room, Technical Support Center (TSC) and Operations Support Center (OSC) radiation doses, indicate that this single envelope design meets applicable NRC regulations.

Consequently, changes to FSAR sections on Control Room habitability systems are being prepared for submittal to the NRC.

Very truly yours,

'UK4 CA~

N. W. Curtis Vice President-Engineering

& Construction-Nuclear TEG/mks Attachment gooi

/(

s7 rt tt aa o'Pgg PENNSYLVANIA POWER IL LIGHT COMPANY