Interim Deficiency Rept Re Seismic Qualification of Bailey Instruments Per Bechtel Purchase Order J-03B,initially Reported on 810317.Joint Engineering Review of Bailey Documentation Being Scheduled.Next Rept in Aug 1981
ML18030A292
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/20/1981
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, PLA-791, NUDOCS 8105260387
Download: ML18030A292 (3)


Text

REGULATORY IPFORr~ATION DISTRIBUTION SYSTEM (RIDS)

S'~

ACCESSION NBR:8105260387 DOC DATE: 81/05/20 NOTARIZED:

NO FACIL:50-387 Susquehanna Steam Electric Station<

Unit 1< Pennsylva 50-388 Susquehanna Steam Electric StationF Unit 2F Pennsylva AUTH'AME AUTHOR AFF ILIATION CURTISE N ~ N ~

Pennsylvania Power 8, Light Co ~

REC IP ~ MA"E RECIPIENT AFFILIATION GRIERF B ~ H ~

Reqion 1F Philadelphiar Office of the Director

SUBJECT:

Interim deficiency reot re seismic qualification of Bailey instrumer'.ts oer Becntel Purchase Order J 038rinitially reported on 810317

~ Joint enqineer ing review of Bailey documentation being scheduled, Next rept in Aug 1981.

DISTRIBUTION CODE:

DOIN'S COPIES RECEIVED:LTR g

ENCL SIZE:

TITLE: Construct i on Deficiency Rec ort (10CFR50

~ 55E)

NOlES:Send I8E 3'onies FSAR 8 al 1

amends.

1 cy:B>!R LRG Pi>>(l

~ RIB)

Send I8E 3 copies FSAR 8, al 1

amends.

1 cy:Bl'lR LRG PM(L.RIB)

DOCKET 05000387 0 ~038~R 05000387 05000388 RECIPIENT TD CODE/NAi4IE ACTION:

A/D LICENSNG 04 RUSHBROOKF"I ~

06 INTERNAL: ASLSP/J

~ HARD EDO 8

STAFF 19 HYD/GEO BR 22 IE/EES MPA 2U OELD 21 gA BR 14 STANORDS DEV 21 COPIES'TTR ENCL 1'1 1

1 1

1 1

RECIPIENT ID CODE/NAI>>E L IC BR 42 8C 05 STARKERS 07 0/D IR "IUt<

P AC 15 EQUIP QUAL BR 1 1 I8E 09 LIC QUAL BR 12 NRC oDR 02 oRO RE V 13 G FIL 01 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

EXTERNAL: ACRS NSIC l6 08 16 1

LPDR 03

.BV C

TOTAL kUkBER OF COPIES REQUIRED:

LTTR "'

ENCL PT

>>TWO HORTH NINTH STREET, ALLENTOWN, PA. 18101 PHOHEr (215) 770-5151 NOR'AN W. CURTIS Vice Presiaent. Engineerrng

& Construction-Nuclear 770.5381 May 20,'1981 Mr. Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

'USQUEHANNA STEAM ELECTRIC STATION INTERIM REPORT OF A DEFICIENCY RELATING TO SEISMIC QUALIFICATION OF BAILEY INSTRUMENTS ERs 100450/100508 FILE 840m/Ma-10 PLA-791

Dear Mr. Grier:

This letter serves to provide the Commission with an interim report of a deficiency involving the seismic qualification of Bailey instruments supplied under Bechtel Purchase Order J-03B.

The deficiency involves an

'pparent inability to relate the subject instruments to seismic test reports submitted by Bailey in compliance with documentation requirements of Bechtel Purchase Order J-03B.

The deficiency was originally reported by telephone to NRC Region I Reactor Inspector, Mr. L. Narrow, in a telephone conversation with Mr. A. R. Sabol of PPGL on March 17, 1981.

During that conversation, Mr. Narrow was advised that the condition was being evaluated for reportability under the provisions of 10 CFR 50.55(e).

PPaL Nuclear Plant Engineering is currently investigating the circumstances surrounding this apparent inability to establish the seismic qualification of Bailey instruments based upon the seismic test results submitted by Bailey.

A joint Bechtel/PL engineering review of documentation which is presently available at Bailey is being scheduled.

Bailey has recently indicated that documentation. does exist which if properly researched and assembled will evidence that the original seismic tests are relatable to the instruments supplied to SSES.

The availability of adequate test reports that could establish the seismic qualification of the instruments would serve to dismiss PPSL's concern.

$0/7 5

j/0 PEHHSYLVANIA POWER 3

LIGHT COMPANY

Mr. Boyce H. Grier 2

May 20, 1981 Since these instruments are used extensively in Q and non-Q applications, including systems designed to insure safe plant operation and shutdown, their failure due to a seismic event could be considered a significant deviation from performance specifications.

Hence, the lack of seismic qualification for the instruments is considezed reportable under 10 CFR 50.55 (e).

'ailey instruments have also been used at SSES by General Electric in Balance of Plant and NSSS applications.

Currently we have indications that a similar deficiency may exist for these instruments.

Bechtel is working with GE towards resolving-the qualification status of these Bailey instruments.

Since the details of this report provide information relevant to the reporting requirements of 10 CFR 21, this correspondence is considered to also discharge any formal responsibility PPaL may have in compliance thereto.

We expect to provide additional information on this deficiency in August, 1981..

Very truly yours, N.

W. Curtis Vice President-Engineering

& Construction-Nuclear o FLW:sab cc:

Mr. Victor Stello (15)

Director-Office of Inspection

& Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. G. McDonald, Director (1)

Office of Management Information a Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. Gary Rhoads U. S. Nuclear Regulatory Commission P.O.

Box 52 Shickshinny, PA 18655