Potential Deficiency Rept Re Coped Structural Floor Beams. Based on Results of Field Insp & Finite Element Analysis, Conditions Noted Are Nonconforming & Are Therefore Not Reportable Per 10CFR55(e).Bechtel Procedures Revised
ML18030A129
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/14/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To:
References
ER-100450-10050, PLA-492, NUDOCS 8007180364
Download: ML18030A129 (3)


Text

h'F REGULATORY INFOR>ATION DISTRIBUTION SYSTKi< (RIDS)

ACCKSSIOV NBR:8007180364 DOC.DATE: 80/07/14 NOTARIZED: NO DOCKET ¹ FACIL: - souehanna Steam Electric Stations Unit lg Pennsylva 05000387 50m sauehanna Steam Electric Station~ Unit 2i Pennsylva 05000388 A TH ~ NAME AUTHOR AFFILIATION CU SpN ~ )> ~ Pennsylvania Po~er 8 Light Co ~

RECIPE iVAHE REC IP IKRT AFF ILIA T ION

SUBJECT:

Potential deficiency rept re coped structural floor beams, Based on results of evaluation programpconditions noted are nonconforming 8 areithereforeinot reportable under 10CFR50,55(c) Bechtel preodecures have been revised,

~

DISTRIBUTION CODE: 8019S COPIES RECEIVED:LTR J ENCL Q SIZE:

TITLE: Construction Deficiency Repor t (10CFR50,55E)

NOTES:Send 18E 3 copies FSAR 8 all amends'5000387 05000388 ACTION:

RECIPIENT ID CODE/NA~E A/D LICENSNG 21 COP IKS LTTR KN L 1

'O RECIPIENT CODE/NAME YOUNGBLOOOIB 15 COPIES LTTR KNCL RUSHBROOKgR ~ 20 1 SKRVICEz I~ 20 STARKiRe 14 1 INTERNAL: AO/RCI/IE AEOD D/OIR HUH FAC S 1 DIRgHUH FAC SFY EOO 8 STAFF 07 1 KQUIP QUAL BR 16 FIELD COOR/IE13 1 I8E 05 LIC QUAL BR 1 HPA 08 NiRC PDR 02 1 OELD 23 PROC REY BR 1 QA BR 10 01 RUTHERFORDgh IE DEY ll ,1 1 ~

EXTERNAL: ACRS 24 16 1 LP(lR 03 NSIC 04 1 JUL 2r t9so TOTAL iuui4tBKR OF COPIES REQUIRED: LTTR 41 ENCL

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONE: (215) 821 5151 NORMAN W. CURTIS Vice Presrdent-Engineering IL Construction-Nuctear 821.5381 July 14, 1980 Mr. Boyce H. Gx'ier Director, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION NOTIFICATION OF A POTENTIAL DEFICIENCY COPED STRUCTURAL FLOOR BEAMS ERs 100450/100508, FILE 840-4 PLA-492

Reference:

PPaL letter PLA-443 dated January 22, 1980

Dear Mr. Grier:

The referenced letter describes a condition which was submitted as being potentially reportable'nder the provisions of 10CFR50.55(e).

A field inspection program was conducted ising both visual and non<estructive examination methods. After completion of the field inspections, a finite element analysis was performed for the coped beams which had radii less than the specified L2 inch minimum. Fracture mechanics analysis was performed to evaluate .the significance of the kerfs and other cope related discontinuities.

Based on the results of the evaluation program we have concluded that the conditions noted are nonconforming conditions which are technically acceptable and will have no adverse effect on the safe operation of the plant and, therefore, have been determined to be not, reportable. All nonconformance have been identified and are- being controlled in accordance with Bechtel Quality Control procedux'es and will be dispositioned accordingly.

However, to preclude recurrence of similar nonconformance's, the pertinent Bechtel Quality Surveillance Plan procedures have been revised to zepxire Bechtel inspection personnel to examine structural members to assure that impx'opex'ly coped beams are not permitted to be shipped.

Very truly yours, rrT. Curtis Vice Pzesident-Engineering I

& Constmction-Nuclear PENNSYLVANIA POWER IL LIGHT COMPANY 8oo7t8 oggttr

Mr. Boyce H. Grier July 14, 1980

,PLW/ARS:jmk cc: Mr. Victor Stello (15)

Director-Office of Inspection a Enforcement U. S. Nuclear Regulatory Ccmmission Washingotn, D.C. 20555 Mr. G. McDonald, Director Office of Management Xnformation a Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P.O. Box 52 Shickshinny, PA 18655