|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18040B2891999-03-12012 March 1999 Proposed Tech Specs Including Rev 0 to EMF-1997(P)(A) Into TS Section 5.6.5 & Including Revised MCPR Safety Limits in TS Section 2.1.1.2 ML18040B2881999-01-12012 January 1999 Proposed Tech Specs Re ANFB-10 Critical Power Correlation & MCPR Safety Limits ML17164A6711998-07-0808 July 1998 Proposed Tech Specs,Implementing Improved Tech Specs of NUREG-1433.Page B3.8-1 of Incoming Submittal Not Included ML17159A3261998-05-12012 May 1998 Proposed Tech Specs Re Removal of Fire Protection Program ML20199C8741997-10-22022 October 1997 Rev 0 to NASI-00-507, Corrective Action Process Effectiveness Assessment ML18026A4711997-02-11011 February 1997 Proposed Tech Specs Requesting Improved TSs LCO 3.10.3 & LCO 3.10.4 Be Approved for Use During Susquehanna Ses Unit 2 Eighth Refueling & Insp Outage Scheduled for 970315 ML17158C0321997-01-0808 January 1997 Rev 4, Solid Radwaste Pcp ML20129D7851996-09-23023 September 1996 Proposed Tech Specs Re MSIVs Leakage Testing ML20116K3491996-08-0909 August 1996 Proposed Tech Specs Re Battery Load Profiles ML17158B5581996-03-20020 March 1996 Proposed Tech Specs,Changing Open Logic for HPCI Suction Valve HV-155/255-F042 in Order to Eliminate HPCI Pump auto- Transfer on High Suppression Pool Level ML20115A8211996-02-29029 February 1996 Proposed Tech Specs,Removing Rod Block Monitor Requirements from TS by Reducing Number of Rod Movements During Power Maneuvers ML20115A8171996-02-29029 February 1996 Proposed Tech Specs,Relocating Spec 3/4.9.6, Refueling Platform to Document Which Is Controlled Under Requirements of 10CFR50.59 ML17158B1071996-02-12012 February 1996 Proposed Tech Specs to Implement 10CFR50,App J,Option B & Establish New Spec 6.8.5, Primary Containment Leakage Rate Testing Program ML17158A8181995-08-11011 August 1995 Proposed Tech Specs,Relocating Fire Protection Program from TS to Another Controlled Document Following Guidance of GL 88-12 ML17158A9001995-07-17017 July 1995 Rev 5 to Susquehanna Ses Odcm ML17158A6821995-04-26026 April 1995 Rev 3 to Nuclear Dept Procedure ON-100-009, Control Room Evacuation ML17158A6841995-04-13013 April 1995 Rev 3 to Nuclear Dept Procedure ON-200-009, Control Room Evacuation ML20081L9151995-03-14014 March 1995 Rev 1 to NS-ST-002, Security Training & Crucial Security Task Certification ML17164A5801995-02-10010 February 1995 Proposed Tech Specs for Aot/Sti Extensions ML17164A5891995-01-20020 January 1995 Rev 2 to PP&L SSES Odcm ML17164A4351994-11-21021 November 1994 Proposed Tech Specs Increasing MSIV Leakage Rate & Deleting MSIV-LCS ML17158A5621994-11-11011 November 1994 Proposed Tech Spec 3/4.3.8 Re Main Turbine Valve Surveillance Test Interval ML17158A5441994-10-28028 October 1994 Proposed Tech Specs,Incorporating Administrative Changes ML20083A8121994-06-0101 June 1994 Rev 0 to ISI-T-108.0/208.0, Susquehanna Ses Units 1 & 2 ISI Program Master Selection Document Class 1,2 & 3 Components & Component Supports for Second ISI Interval. W/Oversize Drawings ML20058F8281993-11-24024 November 1993 Proposed Tech Specs Re Power Uprate W/Increased Flow ML17157C3881993-05-31031 May 1993 Rev 8 to ISI-T-100.0, ISI Program Plan for Pump & Valve Operational Testing ML17157C3901993-05-31031 May 1993 Rev 5 to ISI-T-200.0, ISI Program Plan for Pump & Valve Operational Testing ML18017A2671993-04-20020 April 1993 Exercise Manual ML17157C2741993-04-0202 April 1993 Proposed TS 3.4.1.1.2 Re LCO for Recirculation Loops,Single Loop Operation ML18017A2631992-05-0606 May 1992 Emergency Exercise Std for Conduct in Performance of 920219 NRC Graded Exercise ML20113G9881992-02-19019 February 1992 Package Providing Basis for Conduct of Simulated Radiological Accident at Plant ML17157B0081991-12-31031 December 1991 Rev 7 to ISI-T-100.0, Sses,Unit 1,ISI Program Plan for Pump & Valve Operational Testing, Per Generic Ltr 89-04 ML17157B0101991-12-31031 December 1991 Rev 4 to ISI-T-200.0, Sses,Unit 2,ISI Program Plan for Pump & Valve Operational Testing, Per Generic Ltr 89-04 ML18017A2591991-10-16016 October 1991 Exercise Manual, Approved by Util as Std for Conduct in Performance of 911016 NRC Graded Exercise ML20082P1871991-09-0404 September 1991 Proposed Tech Specs for HPCI Sys Low Pressure Surveillance Test Acceptance Criteria ML17157A3381990-09-30030 September 1990 Cycle 5 Reload Summary Rept ML17157A3371990-09-24024 September 1990 Proposed Tech Specs in Support of Facility Cycle 5 Reload ML17157A2441990-07-0202 July 1990 Proposed Tech Specs to Support Cycle 6 Reload ML17157A0891990-03-19019 March 1990 Rev 0 to Procedure MT-024-024, Diesel Engine Analysis & Load Balancing ML17157A0871990-03-19019 March 1990 Rev 0 to Procedure TP-024-087, Data Collection for E Diesel Generator Combustion Intake Air Temp Test ML20127B4271990-01-19019 January 1990 Rev 8 to Procedure MT-GE-008, 480 Volt & Under Circuit Breaker High Current Testing ML19325D7491989-10-19019 October 1989 Proposed Tech Specs 3.2.2 Eliminating Certain Requirements on One Time Basis for 3 Months ML20082C4101989-08-16016 August 1989 Spec Change Notice 7 to Rev 4 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML17156B1101989-04-14014 April 1989 Proposed Tech Specs,Making Changes to Emergency Svc Water Sys,Per 10CFR50,App R ML17156B0671989-03-31031 March 1989 Rev 3 to ISI-T-200.0, Pump & Valve Inservice Insp Testing Program ML17156B0651989-03-31031 March 1989 Rev 6 to ISI-T-100.0, Pump & Valve Inservice Insp Testing Program ML20082C4071989-03-23023 March 1989 Spec Change Notice 6 to Rev 4 to F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML17156B1391989-02-22022 February 1989 Rev 12 to EO-100-009, Plant Shutdown from Outside Control Room ML17156B0211989-02-0202 February 1989 Proposed Tech Specs Re Cycle 5 Reload ML20082B2771989-01-0404 January 1989 Rev 4 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers 1999-03-12
[Table view] Category:TEST REPORT
MONTHYEARML17157A3381990-09-30030 September 1990 Cycle 5 Reload Summary Rept PLA-2771, Cycle 2 Startup Test Summary1987-01-28028 January 1987 Cycle 2 Startup Test Summary ML20210B1791987-01-28028 January 1987 Suppl 1 to Susquehanna Unit 2 Cycle 2 Stability Test Results ML20211E2871986-09-16016 September 1986 Test Rept of 1/2 Inch Kwik-Bolt Software.Analyses of 1/2 Inch Bolt,Matl/Dimension,Concrete Mix Design,Tension Values & Safety Factor & Nuclear Power Plant Onsite Test Index Encl ML20211E2251986-04-30030 April 1986 Hilti Kwik-Bolt Concrete Expansion Anchor Torque/Tension Test Performed for Dravo Const at Susquehanna Steam Electric Station in Berwick,Pa ML20211E2381985-05-31031 May 1985 Hilti Kwik-Bolt Concrete Expansion Anchor Tension Test & Torque Vs Pretension Test Performed for Dravo Const in Berwick,Pa. Facility Test Data Analyses Encl ML20133J1251985-05-0909 May 1985 Amended Startup Rept ML17139B5871983-06-0909 June 1983 Startup Rept ML17139A9271982-08-31031 August 1982 Mark II Primary Containment Vacuum Relief Valve Test Program,Phase Iv,Revision 0 ML20064N4241982-08-31031 August 1982 Primary Reactor Containment Integrated Leakage Rate Test, Final Rept ML18031A3881982-08-25025 August 1982 Qualification Fire Test of Protective Envelope Sys ML17139A4531981-09-30030 September 1981 Protective Envelope Evaluation, Final Rept ML18030A5331981-04-16016 April 1981 Wetwell Spray Termination of Pressure Increase Results ML18026A3441981-04-0101 April 1981 Containment Steam Bypass ML18030A0401981-04-0101 April 1981 Containment High Pressure Bypass Leakage Test ML18030A5521981-03-25025 March 1981 Results of Steam Saturated Test Conducted on 810325 ML18030A5531981-03-25025 March 1981 Results of water,50F Subcooled Test Conducted on 810325 ML18030A5491981-03-24024 March 1981 Results of Steam Saturated Test Conducted on 810324 ML18030A5501981-03-24024 March 1981 Results of water,15F Subcooled Test Conducted on 810324 ML18030A5511981-03-24024 March 1981 Results of Steam Saturated Test Conducted on 810324 ML17054D5251980-11-20020 November 1980 Electrical Wire & Cable Isolation Barrier Matls Test for Susquehanna Steam Electric Station Units 1 & 2 ML17138B7791980-10-30030 October 1980 Reactor Pressure Vessel Internals Vibration Test ML20151A3841980-07-28028 July 1980 Revision a to Electrical Wire & Cable Isolation Barrier Matls Test for Susquehanna Steam Electric Station,Units 1 & 2 for Bechtel Power Corp ML17138B1971980-02-28028 February 1980 Submerged Structure Tests ML20195C6391978-02-28028 February 1978 Structural Integrity Test Rept Containment Structure Unit 1 ML20044G7941977-06-30030 June 1977 Structural Integrity Test Rept,Containment Structure,Unit 1 ML17138A5451977-03-22022 March 1977 Rept Translated from German: Results of Non-Nuclear Hot Test W/Relief Sys in Philippsburg Nuclear Power Plant ML17138A5461976-09-30030 September 1976 Rept Translated from German:KKB-Nuclear Startup,Results of Tests W/Pressure Relief Sys ML17138A5411974-12-20020 December 1974 Rept Translated from German:Results of Non-Nuclear Hot Tests W/Relief Sys in Brunsbuttel Nuclear Power Plant 1990-09-30
[Table view] |
Text
PPdl Form 2s54 0
Dept.
Date I
19 I=II Designed by Q.CL<~L ROJECT Approved by PENNSYLVANIAPOWER & LIGHT COMPANY ER No CALCULATIONSHEET C.C P 'l sss t g t.'. kY 4 lid H Pkc Py f'A ~
LF igwA,6K TE. T Gi'FC7 t'Jc Tc c.s i-lens) rade g s.a (
grsls 5tJ QLc: 18rlrlg ccn&srln'~>':0 rt"c~t orle atcce pfB ~16 tc6drt.,c fi
~~F'. 2.s I ~ I. t'-
$ )t:,lr
~
81042lo'/%
0 0
I
" '~rooror JL-PENNSYLVANIAPONER 8 LIGHT COMP NY ER No CALCULATIONSHEET Designed by Approved by PROJECT Sht. No.~of Dur)nr)
<hr.'rusque'nan4Q
~tw
~ltQQPure.( T+eijr))y 5~ ps')
d)/even])a(
chas held acmss Qe cfll~j)r)r)hf'r-~// ~/)ratty)
QIBI).
30 <-'(e)'~()". R
<hw prcsSvs) >ad)C,n.
1"ic' Aogol co<;.r >-
uos<
f95d acEm (crHarhmenC D).
Y I
~< iesf t rlgrr,BC'ch+ IBAl+NbPll'f)c cG)rfr8550YK 4)Ag I'vl)
Eo rnaI~<a)n
$4<
prr. WVre O>>Ce'{;
LWS esdabl)SheC(,
h>MPVey reCr=rCIS Qocurv) en'))",Q 9)1c sga~d)),g 8w<l 5-lopp) <Jc OF f))c Alnprc".~f 5 are nb<
avai/a~I
~
Qec rc)'s Inc(ic>>n:t 4hz/
gIIe pressrJrc o aS rr)a!n'f8tAc3 aTC AVch) IGI)le.
r'I5$urnrn9 dna Ccn t) reSSc,r5 ra~
Y'w>d)ndc.J:,
8Q
) ha{
a II It Brac)c I$
rrc rcSS
(,)sr,",
4
) J Or)e 0 nfl 01 r I,Cg OI 5q ru(qI (s., I g,g],jfr I Vga q lc."SL"."c'q 1(50
~C;rv,.
LChf h CC))I
.I'r )
f I
v~3'i ar) aCc.-:-',::
ZOI q SCOW
. fig t LV.s ca Ic i;I-"lc').
Of)~'-"'i.g. I I
. C
-".i~e cns.t ra",'f 3n<3
<r"-: '.
b'~pa5s IE'ak >g r
rr IA li,~r
~
I 'Z <
prf e sJf'C
~
1 I 0 SC') r".
S~sqver"~)i ~p 'S Qe-:m gyp>s~
ca pari I)')~ ~
c/bs)ev cIlx Z.'f'5 f
e
)< e)C'p+] 'r)18 r')..Ir r.
ro. ~r".Se.~]4
& ~ %
I Rr dfscussionc lurch fsk('
ch veslf's< fc.
A/sic =,2sf>ques u.-.d
%his Ca(cvigd o:)
Q~pZ<~
~.(t-. ~
(c I)0-(. -~~~(
~~E,5 DQA, I~,2-5 44 cuhiIe.
4he
.00 Q ~
in
%he ZAP ccrrcslsur lS,G Ch efrfhll br:G< SCCidc.;t. (Fsflf.
Ffrfurr fo,2-f+)-
Dote I
Iy~g Designed by~~
Approved by PROJECT Shl No.~of~
PENNSYLVANIAPOWER & LIGHT COMPANY ER No CALCULATIONSHEET Yet=.2.5Q R,ops ~
52.2.
ib fg3 III'bm
~aftf
'b'F. 73 Ibm/oa~
22.(c 3. BV Ibm /ITI'tn So taS
@cfog 45:i.me IG% ACCZmMCe CRIreed QC EP TA6 LE, LCAKAC~E. =
9O I 9 Scars
=,OPS Air Ibm Qp = 3Z,g5 p; g<gsJre aHacheA
~e,: 8 T4. denStly 3 an ~~
Ut.'ry Ccn "c r~a< "~"/
, Q75 Ibm/g$ ~
(ot'rC - ""f'" f'.
4o D;. V.C'l i(fhSu~C.
mS SO(Ohfff' I.~S ac urr e~ 4c 7G'r
-"" 4 0 p tg.
- pstn,
O.
0.4 OrlO 025 MO 5
0.~
a2o 5
0.15 Cl m
O M
O' lD I
lO 00 Q
n
'II 0+sft C
Z mX I
CO ZZ m Z cn
~ -I
+ ~+m m
<O~
Bun pm CO 0Z 0.10 0.05 0
e 0
CO Cl
'1,0 2.0 ttllMARYSYSTEM SREAK ARKA(tt ]
.&i,z~
gl". I0 93 l5 BIO)L 93.f5
.IIO Sk 75 VJ TII'PLEICALICK
+.0;pet 0145 tSIQ HAS 1540 HAS.
HRS 1707 HRS
~~h~ Sl.ZO t5fO
~
~
"/
DAYWKLLPllKSSUM 1NN HAS 4'SfO 0155 HRS 0255 HAS
/
/ EIhl'EEEEION CHAMEEh FEEEEUhh J SS.1 tSIO e
2$1S HAS 1S 20 JAN. 1S, 1Sll 1S YlME lHOURS)
~VV
>>ii"~iEnl r h, 7 fr>I < ~r) IPnf f 1 I-
v Specification 8856-C-44 Revision 0
Addendum No.
3 D..'Revise Attachment B as follows:
ATTACHE'AT B PXPlNG A'AD UA U 'l SCH".1&TZC BS1 P netration Fo.
X-5 V4 RV ORYWFLL V2 Fl ACi "tSl V3 su??REssloN cHAt.'.scR
~ g" PIPE i7Yr.)
Pena" ratio".. '.!o. X-225 C
PHASE'( RErER 70 ATiACH.A )
- 1. Iiu!TIALPRESSURIZATIQ<:
- 2. 115.,~ DESIGN PP cSS I".OLD
- 3. BLO"iDG'0:A70 23.2 PSIG 4 I'GLD A728.2 PS!G
- 5. PRESS'JRIZE DRYS'ELL 70 61PSIG
- 6. 32.8?SID HOLD
- 7. VEPT DRY'V.'ELLTC S.C.
8, Fli.'ALBLC"(DO'Vda<
Ve Gpciii CLOSED CLOSED CLGScD 00 CLOSED CLOSED CLOSED V2 GpcN OPEh 0 P "=."i I,P
%1 GP" A'LCSc0 OP=N OP=N V3 OPER CPEiiI CREE CPEW CLGSED CLQ "D GP Eih ip ay V4 CLOSED CLOSED GPEN CLOSED CLOScD CLOS"0 CLOSED OPEN Oll CFF QFF OrF Ql i GFF OFF OFF ScE ATTACHYc'17 0. OR cQUIPi.".E IT D SCR lPTICiiI Sheet 3 of 3
Revis' Z
ATTACHMENT D PRESSURIZATION SYS'REM E UIPMENT ITEM.
I C-1 C-1 1
(RENTED) 2 (RENTED)
DESCRIP'ZION Air Comcresso
- Portable Engine Driven Screw Type, Ca acit of 1200 scf
, oil free 8 160 ps'. Ingersoll-Band Model Spiro-Plow 1200 or equivalent.
Air Com resso
- Portable Engine Driven Screw Type, Ca acit.'f 750 scfm, oil free.
AC-1 Aftercccler - Minimum capacity of 5000 scf m (14 ~ 7 psia and 60 ~F) with a 10 ~
approach temperature i.e. the difference between the air temperatu e leaving the aftercooler and cooling wa"er inlet em-peratu e.
Shell side design pressure/
temperature -
150 psig/250~F.
Tube side design pressure/temperature
- 150 psig/
400~F.
American Standard Typ
- A300, size 12040.
MS-1 Moisture Separator - American Standard Model 8T, Part, No. 2-176-5-08-215-01, design pressure/temperat.ure
- 150 psig/
400~P, with automatic trap, Part No.
2-196-7-06-120-0 1 ~
F 1
V1, 2~ 3, 4
4 Com ressed Air Filter - Minimum capacity of 6300 scfm 8100 psig op=rating pres-sure.
Collection efficiency capable of removing 99.9% of 0.6 micron and larger dirt particles and 95A of 0.009 micron and larger oil droplets from the air, with Automatic Drain System, Model ST-3 with preset imer for 10-second blow-down inte~val every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
Zurn
<<MICROFILM:-B<<Coalescing Oil Pi 1 er g Model Z 1200, or equivalent.
Motor 0 erator Eut erfl Valves-Minimum capaci-y of 5000 sc m
a) 110 psig, bubble tigh-3 150 psig complete with position indicators by Raymond Control Systems.
Cenzerline Wafer Type 6<<Series
<<A<<1/60/115 with <<Mar I
~
~
Revision Z
SO< motor driven actuator with manual ovexide switch control or equivalent contxol.
RV BS-1 Pressure Relief Valve - Minimum relief capacity of 480G scfm 8 70 psig.
Kunkle Type 4252.
Blowdown Silencer - Auditco Type 0+1 Series MGO 6" mufflex..
W2 3M
~ C RS-M&--
ar MW RL HR RS RS ar RR HL RL ar KL RR RR r ~
WW RR RL RS WL
- ar RR ar