Summary of 801105-06 Meeting W/Util Re Projected Fuel Load Date
ML18030A023
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/20/1980
From: Stark R
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8012090205
Download: ML18030A023 (14)


Text

Docket Nos.:

50-387 and 50-388 graf g 0 I980

<e (yV APPLICANT:

Pennsylvania Power and Light Company FACILITY:

Susquehanna Steam Electric Station, Units 1 and 2

SUBJECT:

SUNvtARY OF NOVEMBER 5-6, 1980 CASE LOAD PANEL MEETING AND SITE VISIT The last Caseload Forecast Panel Assessment in.March 1980 projected a fuel load date for Unit 1 of December 1981.

In a,letter to Darrell Eisenhut dated August 19, 1980, the applicant indicated that they had revised, their fuel load date from April 15, 1981 to June 1, 1981.

On November 5 and 6, 1980 the Caseload Forecast Panel again visited the site to update the Panels projected fuel load date.

The meeting agenda (Enclbgure

1) and the list of attendees (Enclosure 2) are attached.

7he applicant indicated that the plant was,88$ complete.

The applicant indic4ted that their current schedule included the impact of most Tt11 items.

As.of October 1980, about 905 of the engineering work for Unit 1 was completed.

The applicant indicated they-are about 3,- the way through their startup and testing program.

As of October 20, 1980, about 97% of'the large pipe and 97$ of the small pipes were installed.

About 984 of the cable trays and 995 of the cpnduct are installed.

Conclusions The applicant is currently abo0t 2 months behind their Unit 1 fuel load date.

Based on the status of construction and preoperational testing at this time the NRC Panel projected a March 1982 fuel load date for Unit l.

Enclosures:

1.

Meeting Agenda 2.

List of Attendees Richard H. Stark, Project Manager Licensing Branch Ho.

1 Division of Licensing golwa7oM~

,DL:LB15I1

~BJYoungb1ood "

11/

/80,,

OFF I C E). D.4. I.86...

sURNAME

.RMSIar k/1 s' oATEk 1 1/ 18/80

~p ~y 1

~ I

. I NRC FORM 318 (9 T~'RCi~I 88~'0 O'U.S. GOVERNMENT PRINTING OFFICE: 1979 289 389

4 4

~<<

Cf'4 C SI 4 t 4 ~

f

=

"4 ~

tl il 4

4

~.=

tc

=4

~

4 4 '

I '

4

~

f I 4

'I S>>fit 4 il l

4 ttt It

~ l 4

~ tci IC S

I I

4 C 4

4

'c

~*

IS ff 4

~ AS

>>4 I

4Iri

~ I f,

I IIti I

4 htf

  • Iti

)

Ic,p 4

I 4

4.

4 4

4

Mr. Norman W. Curtis Vice President Engineering and Construction Pennsylvania Power and Light'Company 2 North Ninth Street Allentown, Penqsyl vani a 18101 CC:

Mr. Earle M. Mead Project Engineering Manager Pennsylvania Power 8 Light Company 2 North Ninth Street Allentown, Pennsyl vani a 18101 Jay Silberg, Esq.

Shaw, Pittman, Points 5

Trowbridge 1800 M Street, N.

W.

Waqhington, D.- C.

20036 Mr. William E. Barberich, Nuclear Licensing Group Supervisor Pennsylvania Power 8 Light Company 2 North Ninth Street Al 1 entown, Pennsyl vania 18101 Edward M. Nagel, Esquire General Counsel and Secretary Pennsylvania.

Power 5 Light Company 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 Bryan Snapp, Esq.

Pennsylvania Power 8 Light Company 2 North Ninth Street Allentown, Pennsyl vani a 18101 Robert M. Gallo Resident Inspector P. 0.

Box 52 Shi ckshinny, Pennsylvania 18655 John L.: Anderson Oak Ridge National Laboratory Union Carbide Corporation Bldg. 3500, P. 0.

Box X

Oak Ridge, Tennessee 37830 Gerald R. Schultz, Esq.

Susquehanna Environmental Advocates P. 0, pox 1560 Wi kes-Barre, Pennsylvania 18703 Mr. F,B. Poser Project Engineer Bechtel Power Corporation P,

0.

Box 3965 San Francisco, California 94119 Matias F. Travieso-Diaz, Esq.

Sgaw, Pittman, Potts E

Trowbridge 1800 M Street, N.

W.

Washington, D.

C.

20036 Or. Judi th H. Johnsrud Co-Director Environmental Coalition on Nuclear Power

, 433 Orlando Avenue State College, Pa 16801 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Department of Environmental Resources Commonwealth of Pennsylvania P. 0.

Box 2063 Harrisburg, Pa 17120 Ms. Colleen Marsh Box 538A, RD¹4 Mountain Top, PA 18707 Mrs.

Irene Lemanowi cz, Chairperson The Citizens Against Nuclear Danagers P. 0.

Box 377 RO¹1

Berwick, PA 18503 Mr. J.W. Millard Project MAnager Mail Code 394 General Electric Company 175 Curtner Avenue San Jose, California 95125

L Q

SUSQUEHANNA PROJECT CASELOAD FORECAST PANEL SITE VISIT MEETING AGENDA ENCLOSURE 1

l.

Overview of project construction schedule including progre'ss and major milestones completed since Caseload Panel visit of March 1980 current problems and any anticipated problem areas that may impact the current projected fuel load date.

2.

Detailed review and current status of design and engineering effort (by major discipline) including any potential problems that may arise from necessary rework.

3.

Detailed review and current status of procurement activities including valves, pipe, instruments,

cable, major components, etc.

4.

Actual and proposed craft work force (by major, craft), craft availability, producgivity, potential labor negotiations and problems.

5.

Detailpd review and current status of all large and small bore pi pe hangers, restraints,

snubbers, etc., including desigp, rework, procurement, fabrication, delivery and installagion.

6.

Detai led review of project schedule identifying critical path items, near critical" items, amount of float for various activities, the current critical path to fuel loaging,

, methods of implementation of corrective action for any activities with negative float, and provisions for contingencies.

The estimated project percent complete as of November 1,

1980.

7.

Detailed review and current status of bulk quantities including current estimated quantities, quantities installed to date, quantities scheduled to date, current percent complete for

each, actual versus forecast installation rates, and basis for figures.

(a)

Concrete (CY)

(b)

Process Pipe (LF)

- Large Bore Pipe (2 1/2" and larger)

- Small Bore Pipe 2" and smaller)

(c)

Yard Pipe (LF)

(d)

Large Bore Pipe Hangers, Restraints, Snubbers

[ea)'

< ~

~ t l

$r

'I l,al I

(e)

Small Bore Pipp Hangers, Restraintp (ea)

(f)

Gable Tray (LF)

(g)

Tofal Conduit (LF)

(h)

Total Exposed Metal Conduit (LF)

(i)

Cable (LF)

- Power

- Control

- Security

- Instrumentation

- Pl ant Lighting (j)

Terminatiops (ea)

- Power

- Control

- Security

- instrumentation

- Plant Lighting

{k) Electrical Circuits (ea)

- Power

- Control

>> Security (1)

Instrumentation

{ea) 8.

Detailed review and current status of prepar ation of preop test procedures, integration of preop test activities with construction

schedule, system turnover schedule, preop test
schedule, current and proposed preop teyt program manpower.

(a)

Total number of procedures required for fuel load.

(b)

Nupber of draft procedures not started.

(c)

Number of draft procedures being written.

(d)

Number of procedures approved.

e)

Number of procedures in review.

(f)

Total number of preop tests require) for fuel load.

(g)

Number of preop tests completed.

(h)

Number of preop, tests currently in progress.

(i)

Number of systems turned over to start-up.

~-

~

~

I 7 ~

I

~

~ r 7 ~

~

~

~

P ~,

77, 7

,7

~

~

7 r

~

I ~

~

3 9.

Detailed discussion of potential schedular influence due to changes attribuged to NUREG-0660, NUREG-0694 and 'other recent licensing requirements.

10.

Oetailed discussion qf 50.55E jtems and thei r impact on the schedule.

11.

Site touq an) observation of cqnstruction activitjqs.

~

~ ~

ENCLOSURE 2

LIST OF ATTENDEES Caseload Forecast Meeting November 5, 1980 Nuclear Re ulator Commission R.

Gal lo--

R. Stark W. Lovelace Bechtel G,

D, Pedersen A. F. Bisesti E.

W. Figard J.

W. Peckis M.

N. Mrsir C.

Turnbow Penns lvania Power and Li ht Com an W. E. Barberich J. T. Kauffman S.

HE Cantone H.

W. Keiser N.

W. Curtis R. A. Mazzini Jack Calhoun Duane D. Karchner Bob Feat'enby

~

aw J+

I'.

I II P

4,

MEETING

SUMMARY

DISl'RIBUTION NOV:-v g 19OP

~Docket File NRC PDR Local PDR TIC/NSIC/Tera NRR Reading

=

LBII1 Reading H. Denton E.

Case D. Eisenhut, R. Purple B. J.

Youngblood A. Schwencer F. Miraglia J. Miller G. Lainas R. Vollmer J.

P. Knight R.

Bosnak F. Schauer R.

E. Jackson Project Manager

Attorney, OELD M. Rushbrook OIE (3)

ACRS (16)

R. Tedesco N. Hughes

~RRR ll l.

R. Gallo R. Stark W. Lovelace Sta k

G.

V.

S.

V.

Z.

W.

D.

R.

W.

D.

P.

R.

0.

F.

W.

W.

R.

T.

L.

T.

W.

J.

S.

W.

F.

D.

M.

R.

C.

K.

G.

A.

D.

J, D,

P, D.

Lear Noonan Pawlicki Benaroya Rosztoczy Haass

Muller, Ballard Regan Ross Check Satterfi el d Parr Rosa Butler Kreger'ouston Murphy Rubenstein'peis Johnston Stolz Hanauer Gammill Schroede'r Skovholt Ernst Baer Berlinger Kniel Knighton Thadarli Tondi Kramer.

Vassallo Collins

Ziemann, bcc:

Applicant 5 Service List

,I

'I P

f