Docket Nos.:
50-387 and 50-388 SEP 5 1980 APPLICANT:
Pennsylvania Power and Light Company (PP&L)
FACILITY:
Susquehanna Units 1 and 2
SUBJECT:
SCHEDULE REVIB4 MEETING A schedule review meeting was held on August 21, 1980 in Bethesda, Maryland.
In attendance were Messrs.
Barberich and ttazzini of PP&L and Messrs.
- Gallo, Lovelace and Stark of the NRC.,The appliccant stated, that many system flushes and hydro tests have been completed and that, they were actually ahead of schedule.
PP&L stated that a June
.1, 1981 fue1 load date may be achievable.
A detailed schedule analysis took place during, the meeting.
During the schedule analysis 17 items were,identified phich could slip and thereby delay the applicants June 1, 1981 fuel load target date.
The applicant.
stated that he is attempting to track these, 17 items very closely.
- However, the NRC reviewers were concerned that a slip of
.1 or 2 of the 17 would,delay the fuel load date by several months.
Moreover, if more than 2 were late the fuel load date would slip to December
$981 ichich is the NRC forecasted fuel load date.
As a result, the NRC saw no reason to change the NRC forecasted fuel load date at this time.
OgGlijALSlGNFD BY Richard M. Stark, Project )tanager Licensing Branch No.
1 Division of Licensing gDO9'/Sc ~@p OFFICE)
SURNAME DATE$
,DL.:.LB/i........,.OI.,
RMStark/1 s BJ un ood
'9/31 80 '
'-"'/' '/8 NRC FORM 318 (9.76) NRCM 0240 QU.S. GOVERNMENT PRINTING OFFICE: 1979 289 369
<<f e"
I: 44
'K 1
~ '"> ~
kgA
} ) $,(
a
'R
Hr. Norman W. Curtis Yice President - Engineering and Construction Pennsylvania Power and Light Company 2 North Ninth Street Al 1entown, Pennsyl vania 18101 CC:
Mr. Earle H. Mead Project Engineering Manager Pe'nnsylvania Power
& Light Company 2 North Ninth Street Al I entown, Pennsyl vania 18101 Jay Si1 berg, Esq.
Shaw, Pittman, Potts 8
Trowbridge 1800 H Street, N.
W.
Washington, D. C.
20036 Hr. William E. Barberich, Nuclear Licensing Group Supervisor Pennsylvania Power
& Light Company 2 North Ninth Street Al I entown, Pennsyl vania 18101 Edward M. Nagel, Esquire General Counsel and Secretary Pennsylvania Power
& Light Company 2 North Ninth Street AlIentown, Pennsyl vani a 18101 Bryan Snapp, Esq.
Pennsylvania Power
& Light Company 2 North Ninth Street Al Ientom, Pennsyl vania 18101 Robert M. Gallo Resident Inspector P. 0.
Box 52 Shickshinny, Pennsyl vani a 18655 Susquehanna Environmental Advocates c/o Gerald Schultz, Esq.
500 South River Street Wilkes-Barre, PA 18702 John L. Anderson Oak Ridge National Laboratory Union Carbide Corporation Bldg. 3500, P. 0.
Box X
Oak Ridge, Tennessee 37830 Nr.
E. 8, Poser Project Enqineer Bechtel Power Corporation P, 0.
Box 3965 San Francisco, California 94119 Matias F. Travieso-Diaz, Esq.
Shaw, Pittman, Potts 8
Trowbridge 1800 M Street, N.
W.
Washington, D. C.
20036 Dr. Judith H. Johnsrud Co-Director Environmental Coalition on Nuclear Power 433 Orlando Avenue State College, PA 16801 Hr. Thomas H. Gerusky, Director Bureau of Radiation Protection Department of Environmental Resources Commonwealth of Pennsylvania P. 0.
Box 2063 Harrisburg, PA 17 120 Hs. Colleen Harsh, Box 538A, RDP4 Mountain Top, PA 18707 Hrs. Irene Lemanowicz, Chairperson The Citizens Against Nuclear Dangers P. 0.
Box 377 RDOI
- Berwick, PA 18503 Hr. J.
W. Millard Project Manager Mail Code 394 General Electric Comoany 175 Curtner Avenue San Jose, California 95125
t! 'h"g$ g(g'$!."! Lk~N MEETING SUN%BY DISTRIBUTION SEP 5 1980
&Docket-F-i-1 e NRC PDR Local PDR TIC NRR Reading LBP1 Reading H. Denton E.
Case D. Eisenhut R. Purple B. J.
Youngblood A. Schwencer Branch Chief,'LB83 J. Hiller G. Lainas R. Vollmer J.
P. Knight R.
Bosnak F. Schauer R.
E. Jackson Project Manager R.
M. Stark Attorney.,
OELD M. Rushbrook OiE (3)
ACRS (16)
R.
Tedesco BCC:
Applicant
& Service List G. Lear V. Noonan S. Pawlicki V. Benaroya Z. Rosztoczy W. Haass D. Muller R. Ballard W. Regan D.
Ross P.
Check R. Satterfield
- 0. Parr F.
Rosa W. Butler W
Kreger R. Houston T. Murphy L. Rubenstein T. Soeis Branch Chief, J. Stol z S.
Hanauer W. Gammill R. Mattson F. Schroeder D. Skovholt H. Ernst Baer C. Berlinqer K. Kniel G. Knighton Branch Chief, D. Tondi Core Performance Rel.
& Risk Assessment Br.
4 f
/
4
$9BO l,
V lA '4 44'4 4 U
Docket IIoa.:
50-387 and 50-388 SEP 5 1S80 APPLICANT:
Pennsylvania Power and Light Company (PPI.)
FACILITY:
Susquehanna Units 1 and 2
SUBJECT:
SCHEDULE REYIEM MEETING A schedule review meeting was held on August 21, 1980 in Bethesda.
tlaryland.
In attendance were Messrs.
Barberich ando ftazzini of PPRL, and Messrs.
- Gallo, Lovelace and Stark of the NRC.
The,applicant stated that many system flushes and hydro tests have been completed and that, they were actually ahead of schedule.
PP8L stated that a June 1, 1981 fuel load date may 5e achievable.
A detailed schedule analysis took place during pie meeting.
During the schedule analysis 17 items were identified which could s'lip and thereby delay the applicants June 1, 1981 fuel load target date.
The applicant stated that he is attempting tq track these 17 items very closely.
- However, the NRC reviewers were concerned that a slip of 1 or 2 of the 17 would delay the fuel load date by several months.
Horeover, if more than 2 were late the fuel load date would slip to December
)981 >chich is the NRC forecasted fuel load date'.
As a result, the<<NRC saw,no reason to,change the NRC forecasted fuel load date at this time.
ggLil
. ggSla>>I>>
Richard II. Stark, Prospect IIanager
, Licensing Branch No.
1 Division of Licensing OFFICE SURNAME DATE
'. L93mf1"".
HStark/1 s.
/3/80 J.o gblood
/
/80 c
~
ee
<
3 J. Miller G. Lainas R. Vollmer J. P. Knight R. Bosnak F. Schauer R. E. Jackson Project Manager
- Attorney, OELD M. Rushbrook OiE (3)
ACRS (16) R. Tedesco M. Stark BCC: Aoplicant & Service List G. Lear V. Noonan S. Pawlicki V. Benaroya Z. Rosztoczy W. Haass D. Muller R. Ballard W. Regan D. Ross P. Check R. Satterfield
- 0. Parr F.
Rosa W. Butler W. Kreger R. Houston T. Murphy L. Rubenstein T. Speis Branch Chief, Core Performance J. Stolz S. Hanauer W. Gammill R. Mattson F. Schroeder 0, Skovholt M. Ernst R. Baer C. Berlinger K. Kniel G. Knighton Branch Chief, Rel. & Risk Asses D. Tondi sment Br. '7 4t