ACGESSION NBR FACILE;50 259 50>>260 50-296 AUTH',NAtiE DOMERtJ ~ AD RECIP" NAME'ENTONiH

~ Re REGULATORY FORMATION DISTRIBUTION SY EM (RIDS)

8510010087 DOC,DATE,
85/09/23 NOTARIZED: YES DOCKET' Browns Ferry Nuclear Power, Stationg Unit 1~

Tennessee" 05000259 Browns'erry Nuclear'ower Stations Unit" 2~

Tennessee 05000260 Browns Ferry Nuclear Power Stationi Unit 3< Tennessee 05000296 AUTHOR AFFILIATION Tennessee<

Valley Authority RECIPIENT AFF ILIAT'ION Office of Nuclear Reactor Regulationi Director

SUBJECT:

Requests that review of 891031 10CFRSO~App.,

R submittal be terminated due, to reduction of scope of cable routing mods, New 10CFRSO~App R will. be, submitted by 860115; DISTR'IBUTION CODE !

A006D COPIES RECEI VED: LTR ENCL SIZE:

TITLE::: OR Submitta'l: Fir e Pr otection NOTES:NMSS/FCAF 1cy,. 1cy NMSS/FCAF/PM'L:06'/26/73 NMSS/FCAF 1cy, 1cy NMSS/FCAF/PM'Lc06/28/74 NMSS/FCAF. 1cy ~

1cy NMSS/FCAF/PM ~

OL~:07/02/76'5000259 05000260 05000296 RECIPIENT ID CODE/NAME(

NRRi ORB2 BC 01 INTERNAL: ACRS 11.

ELD/HDS4 NRR STANGgJ 07 NRA/DE CEB 09.

~ IL:

00'OPIES LTTR ENCL" 3

21 2

1 1

RECIPIENT ID CODE/NAME ADM/LFMB I E WHITNEYr L NRR WERMEILg J06'RR/DL DIR RGN2 COPIES'TTR.ENCL 1

1

]

1 1

1 EXTERNAL: 20X NRC PDR NOTES:

02<

LPDR NSIC 03 05 a

TOTAL NUMBER OF COPIES-REQUIRED!" LTTR

'23, ENCL 0

J

~ III l

h II e

III It t

A

TENNESSEE VALLEYAUTHORITY CHATTANOOGA. TENNESSEE 3'7401 400 Chestnut, Street Tower II September 23, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

In the Matter Tennessee Valley Authority Docket Nos. 50-259 50-260 50-296 Please refer to L. M. Mills's letter to you dated October 31, 1984 which transmitted our most recent Appendix R to 10 CFR 50 submittal for Browns Ferry Nuclear Plant.

Since that submittal, TVA staff has been in contact with NRC regarding technical interpretations of such items as spurious actuation, high/low pressure interface, and hot shorts.

As a result of our discussions with NRC, we have applied that information to our proposed Appendix R modifications, Through this review and reanalysis, we, have been able to reduce the scope of our cable routing modifications from appoximately 500 to 70 cables for the entire plant.

This is a very signiEicant reduction in work and, consequently, we have elected to submit another Appendix R submittal to NRC.

We, therefore, request all review of the October 31 submittal be terminated.

Our new Appendix R submittal will be much less complicated and, therefore, easier for NRC review.

We will submit this improved Appendix R submittal to you by January 15, 1986.

This was discussed between Bill Long of your staff and Mike Hellums oE my staEE on September 13, 1985.

During that discussion we also pointed out that this new submittal does not in any way impact our proposed schedular exemption which NRC is reviewing at this time.

We request that NRC expedite its review of the schedular exemption due to the possible future impact upon the restart of unit 2 from the cycle 5 outage.

BSlOOSOO87 850923 PDR ADDCK 06000>59,.

F PDR>> i'1 J

An Equal Opportunity Employer

I I

E EI

[

'I I

K

Mr. Harold R. Denton September 23, 1985 TVA has determined, based upon the reduced scope of the modifications required in this new Appendix R submittal, we now need schedular relief only for unit 2 to cycle 6 outage.

Units 1 and 3 Appendix R modifications will be completed in cycle 6 outages, therefore, no schedular relief will be needed for these two units.

This schedule will be reflected in future integrated schedule submittals.

If you have any questions, please get in touch with Mike Hellums at FTS 858-2695.

Very truly yours,

<<,'i~MS ig Subscribed and sworn to before

~ me'his ~~ day of ling p Notary Public My Commission Expires 1985.

TENNESSEE VALLEY AUTHORITY

. A. Domer, Chief Nuclear Licensing Branch cc:

U.S. Nuclear Regulatory Commission Region II ATTN; Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. R. J. Clark Browns Ferry Project Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue

Bethesda, Maryland 20814

~'

Jl