ML18029A217

From kanterella
Jump to navigation Jump to search
Corrected Amend 111 to License DPR-33,renumbering Pages of Original Issuance Covering Surveillance Requirements for Primary Containment & Reactor Bldg Isolation Instrumentation
ML18029A217
Person / Time
Site: Browns Ferry 
Issue date: 10/10/1984
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML18029A218 List:
References
DPR-33-A-111 NUDOCS 8411010136
Download: ML18029A217 (4)


Text

CORRECTION TO LICENSE AMENDMENT NO.

111 FACILITY OPERATING LICENSE NO.

DPR-33 DOCKET NO. 50-259 1.

Replace page 85 (September 4,

198<) with the identically number page attached.

2.

Disregard the instruction in the September 4,

1984 letter to replace page 110.

Page 110 (Amendment No. 102) remains effective.-

3.

Include attached page 110a as a part of Amendment No.

111.

BOSia<O>36 84<0>0 PDR ADOCK 05000259 P

PDR

F J,

P

ln~ Lcuacnt ChcctL ci)thratlon Ccequency functional Teat RUklvt1LlJHC R RRQU ttltNsnx 5 loQ e

SARLC I.).L ptiuRT conrAtnt~tnl a~in REAcioa RU)cottl4 )JOLAzloQ lttsrRwtrttfAt)OH 1

runct )on

)netcu~ot Cbanne)

R ~ actor 1QM ttc ter Cee ~ 1 lL)4-)-10)L-D~ Ott 0" 1) loett~nt Cttannel Reactot Sigh

~ ceeauce Inettueent Channel "

Reactot lov tta ter Leeel

)Lls-)-l)R-D, Ru I 1) lnetc~na Channel Rtgh Ptyuell treeeute leS-lt-Sla-D)

)net rumnt Channel Rl gh Rail ~ Lion Hain Rte~

LlAe Sunna l

1) I-once(3 months (29) once/l aonthe once/ l month once/day none once/day ones/4ay lnettueent Channel

()>I'-f-$5,-'fh,-b2,-06}

once/3 mont)is (2l) (29)

Dict /cot rcttjrtg cycle (28) nos ~

lnetcu~nt Channel once/3 monttts Qlgb f LORY ttaln stean Line

( APL'-l-l3A-D,-25A-D,-36A-D,-50A"D) lnetrveent Chalul ~ 1 Hc)n Stean Line y~el Rlsh OnCe/3 mOnthS yeepeC' ture (29) once/operat ln) cycl ~

none (27) (29)

OnCe/Ogeratiaq CyCle (28)

~ice/4ay ln ~tr~nt Channel Recctuc Rul)4tng V~ntllatlon sigh Ra4) at ton Reactof lun ~

Ill )1< ) I)>)..

once/)

nontha once/4ay fl)

HO '

OR TAZL:-S h. 2.A ~OUGH

< ~ 2.H (Contiru~d) 27

~

unctional test consists of the '-]ection of a simulated signal 'nto the e ectronic trip circuitry in place of the sensor signal to verify operability of the t=ip and alarm functions.

2S' Calibration consists of the ad5usanent of the priory sensor and associated components so that they. correspond within acceptable range and accuracy to knox values of the parameter which the channel monitors, including ad]ustment of the electronic trip circuitry, so that 's output relay cmnges state at o-more conservatively than the analog equivalent or the trip level setting.

29.

The functional test frequency decreased to oncel3 months to reduce challenges to relief valves per NUREG-0737, Zeem EE.K.3.)6.

llOa Amendment 'lo. PT, i