ML18026B120
| ML18026B120 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 07/27/1984 |
| From: | TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML18026B119 | List: |
| References | |
| PROC-840727, NUDOCS 8408020151 | |
| Download: ML18026B120 (14) | |
Text
TENNESSEE VALLEY'AUTHORITY" BFN-IPD
List of Effective Pages Page 1 of 9 06/22/84 BROWNS FERRY NUCLEAR PLANT IHPLEMENTING PROCEDURES DOC LIST OF EFFECTIVE PAGES, This List of Effective Pages must be retained with t Plant Implementing Procedures Documents.
Browns Ferry Nuclear Part roce ure Number Subdivision age.
Number Date/Rev.
No..
BFN IP-1 IP-2 List of Effect e
Pages Table of Contents Preface lof9 2of 9
.3 of 9 4of 9 5of9 6of9 7of9 8of9 9of9 l,of 1 Coversheet
- l. of 1
1 of ll 2 of ii 3 of ll 4 of ll 5 of ll 6of 11
.7 of ll 8 of 'll 9 of 11 10 of ll 11 of 11 Coversheet
'1 of 3 2of3 3 of 3
/
06/22/84 06/22/84 05/14/84 06/i3/84 06/22/84 06/22/84 05/14/84 06/13/84 05/14/84 05/04/84 05/30/84 10/12/83 03/14/84
'03/14/84 10/19/82 04/06/84 10/19/82 04/06/84 10/19/82 10/19/82 05/30'/84 05/30/84
. 03/14/84 04/i7/84 04/17/84 04/i7/84 02/04/83 IP-3
- 8p08020is 05000259 8/0727 pDR ADOcl pDR F
Co'versheet 1 of 3'of 3'of3',
04/i7/84 04/17/84 04/17/84 04/17/84,
0
BFN-IPD List of Effective Pages Page 4 of 9 06/13/84 LIST OF EFFECTIVE PAGES (Con't)
Part Procedure Number Subdivision Page Number Date/Rev.
No.
BFN IP-14 IP-15 IP-16 IP-17 Attachment 1
Attachment 2
Attachment 3
Attachment 4
Attachment 5
Coversheet 1 of 5 2of5 3of5 4of5 5of5 1 of 1
1 of 1
1of1 1'of 1
1 of 1
Coversheet lof4 2of4 3of4 4of4 Coversheet lof2 2of 2 Coversheet 1 of 15 2of 15 3of 15 4of 15 5 of 15 6of 15 7of 15 8of 15 9of 15 10 of 15 11 of '15 12 of 15 13 of 15 14 of 15 15 of 15 05/30/84 10/12/83 05/30/84 05/30/84 01/19/84 05/30/84 01/19/84 01/19/84 Rev.
0 Rev.
0 Rev.
0 06/15/82 Rev.
0 Rev.
0 Rev.
0
, 03/30/82 06/15/82 04/22/82 Rev.
0 05/08/84 05/08/84 03/16/82 04/07/83 03/16/82 01/26/82 03/16/84 01/26/82 10/12/83 05/08/84 04/22/82 04/06/82 01/26/82 01/26/82 04/17/84 10/12/83
I s r)r)css(:e.'ali>.'y Allthor':tv
,(i's')s'lls I'.'i'i'v sf)ruler>i' lai) r l':".>>, Ili'-r>
I'I:
I'I" I l I
f EP, 15 i': 0 I'I:.I<NAYI:4'I' Y,.'>'I'IIV( I'l()>l CIIAYL'I'. IYI'OII!)IA'I'ION insli'notion Numbur O I-I.7 L'niL No. / Z~3 Tish ~O ewcsi ~vgmea7 ~cg
-Kupfjips s
r7l li iuo'.n,i>ov iiovision i,.S~
<m uos>m.va4 I':i;n:s ni foo'iod Lagged o+ /8 (
/ctdlPp'lisiovv oi'iovisiuns
( I'(>i')I. I
'rs<:
Or) ly )
/~u IW J.{)~Q
/
8 (Table 4)
JQ(gg/83
/'15 (Table 10)
////
s
///
s I:. this ch')np'e in r'espor)se to in L.EB, II.'. Ihull(.'til), >sltC Insi)(<<Lion Ilel>oi t,'~l.<<)al;(:ment/.'jul)er visvr Insl>(utiurl, Q()>) Il i)u(lit, <<t<:.".Ycs
>ho
< II y> s,.sf)eclfy do(:(Imer)t ur)>ier' easoii loi l'cvlsiorl. )
<!):)r)p'e in 1)r'o<:<.<Iur';)I (Ictail of I:SAR oi othei liccr)sing (Iocua)<int.".
Hv X; N<>)v i>>str'uction?
Yes Ho
'If yi s ro 'either'ucstior),;r Ir~(<I) is i c(I(rir'c<I'.)
Is ")iris;i nor'I')1'it) it)iti;)tc(I <:har)<<e')
Yes (N<)r'k I'lan No.
)
I"'ii'i I'rote(:tion System ir)v(>lv(id.
Yes
)No g
.(If ycs, r'cvie)v riri(l
'i)<r):rtur'e of fii'e pr'oLc()Lion <<r)ls'incor is r'(rquir'c(I. )
W/(
I:ir'(: I'r'otccti(sii I:r)gir)e<>r 4ils l his ch')lip'e ills)(le ru I)lc'et rl Y INC c(>li)ll)itme))t".Y(>s iso p.
(If yes, r'efer Lo lhl'.:I f(>r'>r'>>I)er'(lcnlil'ic;ition (>I the <:I);)r)l,"(.'.)
<<(ui it,y'yst'cm i>>volv<(l".Yes
'A()
W (If v(.'s, r'(ivi<<))'lr)cl s I><';rli>I iir e of I'uhlic 8;if(>ty
)t r'vices 'OUI)(!r'visor's r'e(It) ir'ed. )
el+
Public SafeLy Ser'vices
.'>use) viso)
I'r's I >>; r'e
- ".'1>lllitI c(I Ily I)ate ilgii7+
I:
r>
~i>rio>>:
Iio<l,- I.ifetir))<'. I><:SI'>onsil)ility -
I')
< iiiii>>>l (:onL)'
.'>>I> -i-,,'.
i Il'l:... is;i iii i) ii):.ri(rs".i>>r) (i iiisli)r<Lii>ii I(I< lion, <l(>cur))or)t (or)tr'>>I
'. III iil)<lilt<: rile sotll'cc (Ivc(IRl(ir)L l))ill)'Iz.)
rs Vl'slol)
I P
I
Page 1 of 15 BFN - IPD BFN, ZP-17 MAY 8 1984 1.0
- QQQPg, This instruction is used to comply with the requirements of the Emergency Plan for periodic inspection and maintenance of equipmenh and supplies.
The emergency equipment listed in Tables 1, 2, 3, 4, 6, 7 and 8, is stored in cabinets (with the exception of Tables 4, 6, and 7 which are located in continuously occupied areas) and the door sealed with a lead seal.
These seals provide a means of determining that the cabinet has not been opened.
An inventory list of the equipment is posted on the outside and inside of the cabinet.
The five cabinets are located in:
( 1) Main control room cooridor, (2) Communication room, (3) Central Alarm Station, (4) Health Physics
- Lab, and (5) Hallway outside the Lunch Room.
The stretchers are located ad)acent to the cabinets.
The radiation monitoring instruments and self-contained breathing devices are also available for use.
Five (5) additional self-contained breathing units (with an addi-tional air bottle for each unit) are permanently stored in the con-trol room area for employees who must continuously man the control room.
These self-contained breathing units shall be labeled "FOR CONTROL ROOM USE ONLY. N Table 10 lists the supplies in the REP van.
2.0
- 2. 1 The nurse shall be responsible for inventory and inspection of emergency medical supplies located in the medical treatment area.
2.2 The individuals performing the inventory inspection of all other emergency equipment and supplies shall submit results to the health physics supervisor, who shall review this information and make arrangements to correct deficiencies, and file the data in the health physics files. '
0
. ZBE~BKX 3.1 Each cabinet and storage location, including the medical treat-ment area, shall be inventoried and required equipment inspected and checked for operation and/or condition each calendar quarter.
<<Revision
tI
~ 'FN-IPD List of Effective Pages
~
Page 1 of 9 08/04/84 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT IMPLEMENTING PROCEDURES DOCUMENT LIST OF EFFECTIVE PAGES This List of Effective Pages must be retained with the Browns Ferry Nuclear Plant Implementing Procedures Documents.
Part Procedure Number Subdivision Page Number Date/Rev.
No.
BFN IP-1 IP-2 IP-3 List of Effective Pages Table of Contents Preface lof9 2 of 9 3of9 4of9 5of9 6 of 9 7of9 8 of 9 9of9 1 of 1
Coversheet 1 of 1
1 of 11 2 of ll 3 of ll 4 of ll 5 of ll 6 of ll 7 of ll 8 of ll 9 of 11 10 of ll ll of 11 Coversheet lof3 2 of 3 3of3 Coversheet lof3 2of3 3of3 08/04/84 06/22/84 05/14/84 08/04/84
'6/22/84 06/22/84 05/14/84 06/13/84 05/14/84 05/04/84 05/30/84 10/12/83 03/14/84 03/14/84 10/19/82 04/06/84 10/19/82 04/06/84 10/19/82 10/19/82 05/30/84 05/30/84 03/14/84 04/17/84 04/17/84 04/17/84 02/04/83 04/17/84 04/17/84 04/17/84 04/17/84
BFN-IPD List of Effective Pages Page 8 of 9 06/13/84 LIST OF EFFECTIVE PAGES (Con't)
Part Procedure Number Subdivision Page.
Number Date/Rev.
No.
BFN IP-24 (Cont'd) 4 Attachment A
(Cont'd) 18 of 31 19 of 31 20 of 31 21 of.31.
22 of 31 23 of 31 24 of 31 25 of 31 26 of 31 27 of 31 28 of 31 29 of 31 30 of 31 31 of 31 11/04/83 11/04/83 ll/04/83 11/04/83 11/04/83 ii/04/83 ll/04/83 11/04/83 il/04/83 ii/04/83 ll/04/83 li/04/83 ll/04/83 11/04/83 BFN BFN BFN IP-25 IP-26 IP-27 Attachment 1,
Attachment 2
Attachment 3
Attachment 4
Attachment 5
Attachment 6
Coversheet lof2 2of2 Coversheet lof4 2of4 3of4 4of4 Coversheet lof6 2of6 3of 6 4of 6 5of6 6of6 i of 1
\\
lof3 2of 3 3of3 i of 1
lof 1 lof 1
lof 1 01/12/84 04/07/83 01/12/84 05/30/84 05/30/84 05/30/84 05/30/84 05/30/84 05/04/84 05/04/84 05/04/84 05/04/84 05/04/84 05/04/84 05/04/84 05/04/84 05/04/84 05/04/84 05/04/84 05/04/84 05/04/84 05/04184 05/04/84
e g
Pl V
14 ~
V RADIOCHEMICAL LABORATORY PROCEDURE
+ Page 1 of 2 BFN - IPD
.APR O'E 3SS3 ZHZQBE This procedure outlines the actions to be followed by Radiochemical Laboratory personnel during an emergency involving radiochemical problems'.
Natural phenomena, security threats, or other events not involving radiochemistry could be the cause for the emergency.
This procedure describes those Radiochemical Laboratory actionsrequired during an'mergency involving radiochemical problems.
KQQ."
Shift Engineer's clerk will initiate IP-25 by calling the Radiochemical Shift Supervisor.
2.0 0
C 0
0 E T 2.1 No offsite radiochemical problems are postulated during a NOTIFICATION OF UNUSUAL EVENT.
This situation should not have any ma)or impact on the Radiochemical Laboratory.
2.2 Although the lab will not automatically be called, should assistance be
- needed, RLAS will follow standard practices and procedures during any response work.
3.0
~aza.L A limited release is possible during an ALERT situation.
Significant loss of fuel cladding, small line breaks, fuel handling accidents, or high radiation levels are examples.
LKLTXKLR 3.1 3 02 All RLAS report to the radiochemical lab.
Prepare to implement RLM Radiological Emergency Sampling and Analysis Procedures.
3.3 3.4 Verify proper operation of laboratory assigned survey instruments.
4 An ALERT may require the evacuation of a certain plant area and/or building. If the lab must be evacuated, See Section 7.0.
4,p EME E
C Shear 4 A SITE AREA EMERGENCY may require extensive Radiochemical Laboratory response.
A LOCA or maJor fuel handling accident are examples of a SITE AREA EMERGENCY.
4.1 RLAS report to the lab.
4.2 Prepare to implement RLM Radiological Emergency Sampling and Analysis Procedures.
4.3 Verify proper operation of laboratory assigned survey instruments.
0
'