ML18026A904
| ML18026A904 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/25/2018 |
| From: | Rauckhorst M Southern Nuclear Operating Co |
| To: | Frederick Brown Document Control Desk, Office of New Reactors |
| Shared Package | |
| ML18026A902 | List: |
| References | |
| ND-18-0034 | |
| Download: ML18026A904 (8) | |
Text
Southern Nuclear Plant Vogtle 3&4 Southern Nuclear Operating Company, Inc.
7825 River Road Mark D. Rauckhorst waynesboro, ga aosao Executive Vice President 706 sab 5500 tei 706 826 5570 fax mdrauckh ©southernco.com January 25, 2018 Docket Nos.:
52-025 ND-18-0034 52-026 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Mr.
Fred Brown Director, Office of New Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Vogtle Electric Generating Plant - Units 3 and 4 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule Ladies and Gentlemen:
The U.S. Nuclear Regulatory Commission (NRC) issued Combined Licenses (COLs) NPF-91 and NPF-92to Southern Nuclear Operating Company (SNC) pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 52.97, "Issuance of combined licenses," on February 10, 2012.
Two license conditions require SNC to submit, no later than twelve months after issuance of the COL, the following:
- Aschedule for implementation of the operational programs listed inthe Final Safety Analysis Report Table 13.4-201, including the associated estimated date for initial loading of fuel (COL section 2.D.(11))
A schedule for implementation of the license conditions listed in COL section 2.D.(12)(f)1-9 In accordance with the license conditions, the schedule shall be updated every six months until twelve months before scheduled fuel loading, and every month thereafter until each license condition has been fully implemented. contains the updated schedule. This information is current as of January 23, 2018.
As is typical with a construction project, the schedule information is dynamic in nature.
SNC's COL Operational Programs and Other License Conditions Implementation Schedule contains confidential commercial information. Pursuant to 10 CFR 2.390, SNC requests that the
U.S. Nuclear Regulatory Commission ND-18-0034 Page 2 of 5 specified information be withfieid from public disclosure. In supportoftfiis request for witfifiolding, SNC has attached to this letter the following documents: contains an Affidavit for withholding executed by SNC and prepared in accordance with 10 CFR 2.390, which specifies the confidential commercial information sought to be withheld and the basis on which the information may be withheld. contains the public, redacted version of SNC's COLOperational Programs and Other License Conditions Implementation Schedule. contains the non-public, non-redacted version of SNC's COLOperational Programs and Other License Conditions Implementation Schedule. contains the public, redacted version of SNC's Preoperational Test Procedure Completion Schedule. contains the non-public, non-redacted version of SNC's Preoperational Test Procedure Completion Schedule. contains a Confidential Commercial Information Notice.
SNC requests that Enclosure 3, COL Operational Programs and Other LicenseConditions Implementation Schedule, and Enclosure5, Preoperational Test Procedure Completion Schedule, be withheld from public disclosure under 10 CFR 2.390. The redacted versions in and Enclosure 4 are suitable for public disclosure.
This letter contains no regulatory commitments.
If you have any questions, please contact Michael Yox at (706)848-6459.
(Oath and Affirmation are provided on the following page.)
U.S. Nuclear Regulatory Commission ND-18-0034 Page 3 of 5 Mr. Mark D. Rauckhorst states that; he is the Executive Vice President of Vogtle 3 &4 of Southern Nuclear Operating Company: he isauthorized to executethisoath on behalf of Southern Nuclear Operating Company; and to the best of his knowledge and belief, the facts set forth in this letter are true.
Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY Sincerely, Mark D. Rauckhorst Executive Vice President of Vogtle 3 & 4 MDR/DWM/amw Sworn to and sutecribed before rnaT!
Notary Public 5
Enclosures 2018 My commission expires:
^ 131, \\^
rfl t
^ Aug. 13,2019 :
B 1.
Affidavit for Withholding
- 2. Redacted COL Operational Programs and Other License Conditions Implementation Schedule 3.
Non-Redacted COLOperational Programs and Other License Conditions Implementation Schedule {Withholdfrom Public Disclosure}
- 4. Redacted PreoperationalTest Procedure Completion Schedule
- 5. Non-Redacted PreoperationalTest Procedure Completion Schedule
{Withhold from Public Disclosure}
6.
Confidential Commercial Information Notice
U.S. Nuclear Regulatory Commission ND-18-0034 Page 4 of 5 go:
Southern Nuclear Operating Company / Georgia Power Company Mr. 8. E. Kuczynski (w/o enclosures)
Mr. M. D. Rauckhorst Mr. D. G. Bost (w/o enclosures)
Mr. M. D. Meier (w/o enclosures)
Mr. D. H. Jones (w/o enclosures)
Mr. D. L. McKinney (w/o enclosures)
Mr. T.W. Yelverton (w/o enclosures)
Mr. B. H. Whitley Mr. C. R. Pierce Ms. A. G. Aughtman Mr. W. A. Sparkman Ms. A. C. Chamberlain Mr. O. J. Miller Mr. J. D. Williams Mr. M. J. Vox Ms. A. Pugh Ms. K. A. Roberts Ms. K. M. Stacy Mr. M. K. Washington Mr. 0. T. Defnall (w/o enclosures 3&5)
Document Services RTYPE: VND.LI.LOO File AR.01.02.06 Nuclear Reoulatorv Commission Mr.W. Jones (w/o enclosures)
Ms. J. M. Helsserer Mr. C. P. Patel Mr. M. E. Ernstes Mr. G. J. Khourl Mr. T. E. Chandler Ms. S. E. Temple Ms. P. Braxton Mr. T. C. Brimfleld Mr. A. J. Lerch Mr. C. J. Even Mr. B. J. Davis Mr. B. J. Kemker Ms. C.D. Taylor Mr. T. McGlnty Oolethoroe Power Corporation Mr. M. W. Price (w/o enclosures 3&5)
Mr. K. T. Haynes (w/o enclosures 3&5)
U.S. Nuclear Regulatory Commission ND-18-0034 Page 5 of 5 Dalton Utilities Mr. D. Cope (w/o enclosures 3&5)
Westinohouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)
Mr. D. C. Durham (w/o enclosures)
Ms. L. G. Iller Mr. D. Hawkins Mr. C. F. Landon Ms. S. DITommaso Mr. J. L. Coward Mr. M. M. Corletti Other Dr.W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc. (w/o enclosures 3&5)
Mr. S. Roetger, Georgia Public ServiceCommission (w/o enclosures 3&5)
Ms. 8. W. Kemizan, Georgia Public Service Commission (w/o enclosures 3&5)
Mr. K. C. Greene, Troutman Sanders (w/o enclosures 3&5)
Mr. S. Blanton, Balch Bingham
Southern Nuclear Operating Company ND-18-0034 Affidavit for Withholding Prepared In Accordance with 10 CFR 2.390 for Southern Nuclear Operating Company (This Enclosure consists of3 pages, including this cover page)
AFFIDAVIT Before me, the undersigned authority, personally appeared Mark D. Rauckhorst who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Southern Nuclear Operating Company, and that the statements of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief; Mark D. Rauckhorst SWORN to and SUBSCRIBED before me this day of in County Qfumt.
,1ms.
My Commission Expires SA:
EXPIRES
Z-Z
'* ' r.
GEORGIA ;
Aug.13,2019
S STATES THE AFFIANT:
1.
My name is Mark D. Rauckhorst, and I am over the age of 18.
My office is located in Burke County, Georgia. I am employed by Southern Nuclear Operating Company
("SNC") as the Executive Vice President of Vogtle 3&4.
Iam authorized to make this affidavit on behalf of SNC.
2.
I have personal knowledge of the criteria and procedures used by SNC to designate information as trade secrets, privileged or as confidential commercial or financial information.
Page 2 of 3
3.
In accordance with 10 C.F.R. 2.390, I am making this Affidavit to support SNC's request for withholding, contained in the letter accompanying this Affidavit.
The specific information to be withheld is contained on pages 1 - 6 of Enclosure 3 (COL Operational Programs and Other License Conditions Implementation Schedule) and pages 1 - 9 of (Preoperational Test Procedure Completion Schedule).
4.
The information is sought to be withheld under 10 C.F.R. 2.390(a)(4), as it is confidential commercial information. In support of this request for withholding and pursuant to 10 C.F.R. 2.390(b)(4), Istate the following:
SNC has held the information in confidence.
This information is ofa type customarily held inconfidence by SNC.
This information is being transmitted to the NRC inconfidence.
This information is not available in public sources.
The public disclosure of the information sought to be withheld is likely to cause substantial harm to SNC's competitive position. The information sought to be withheld contains aspects of SNC'sdevelopment plans, the release of which will likely cause harm by allowing other entities to gain a competitive advantage through prior knowledge of SNC's construction and procurement plans.
FURTHER AFFIANT SAITH NOT.
ii.
iv.
V.
Page 3 of 3