ML18026A313

From kanterella
Jump to navigation Jump to search
Response in Opposition to Environ Coalition on Nuclear Power 801014 Petition for Review of ALAB-613.Urges Denial of Intervenor Request for Funding.Petition Does Not Raise Issue of Important Legal Matter.W/Appearance & Certificate of Svc
ML18026A313
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/30/1980
From: Laverty J
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To:
NRC COMMISSION (OCM)
References
ALAB-613, NUDOCS 8011050207
Download: ML18026A313 (15)


Text

se" C+

4 "V

UNITED STATES OF AMERICA NUCLEAR-REGULATORY-COMMISSION BEFORE THE COMMISSION

- J

~

Q rj<cy~~e'~

'4

~'n the Matter

)

PENNSYLVANIA POWER AND LIGHT CO.

ALLEGHENY ELECTRIC COOPERATIVE, INC.

(Susquehanna Steam ElectrIc. Stattnn, Units

1. and 2)

)'ocket Nos. 50-387~

50-388 NRC STAFF'S ANSWER IN OPPOSITION TO ECNP'S PETITION FOR. COMMISSION REVIEW. OF ALAB-613

~s Jessfca H. Laverty-Counsel for NRC Staff October 30, 1980 so xxo5 otoF

10/30/80 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of, PENNSYLVANIA POWER AND LIGHT CO.

)

ALLEGHENY ELECTRIC COOPERATIVE, INC.

)

)

(Susquehanna Steam Electric Station, Units 1 and 2)

Docket Nos. 50-.387 50-388 NRC STAFF'S ANSWER IN OPPOSITION TO ECNP'S PETITION FOR COMMISSION REVIEW OF ALAB-613 I.

INTRODUCTION On October 14, 1980, Intervenor Environmental Coalition on Nuclear Power (ECNP) filed a "Petition for Review of ALAB-613 by the NRC Commissioners."

In ALAB-613, the Appeal Board considered ECNP's allegations that the Applicants and the NRC Staff had abused the discovery procedures in order to block ECNP's effective participation in the captioned operating license proceeding.

ECNP further alleged that the Licensing Board had assisted the Applicants'nd the Staff's achievement of, this end.

The Appeal Board concluded that ECNP's complaints we'e not substantiated by the record and denied the relief sought by ECNP.

In its petition, ECNP has asked that the Commission review and reverse the Appeal Board's decision.

For the reasons-=--

set forth below, the Staff opposes the petition for review.

Ql Pennsylvania Power and Light Co.

(Susquehanna Steam Electric Station, Units 1 and 2), ALAB-613, 12 NRC (September 23, 1980).

II.

BACKGROUND In May 1979, the NRC Staff and the Applicants filed their First Round Discovery Requests on ECNP.~

Although ECNP answered some questions, it failed to fully 2j answer many others.

ECNP's continued refusal to properly answer-interrogatories rested on its general objections that the interrogatories were excessive in number and required a detailed response in an extremely limited period of timeP ECNP's continued failure to respond resulted in the filing of several motions by the Staff and the Applicants to compel proper answers and/or to dismiss ECNP from the proceeding-for failure to-make discovery.

In response to these motions, the Licensing Board reduced the number of interrogatories required to be answered by ECNP and extended the time period within which ECNP had to answer while declining to dismiss ECNP and its contentions from the proceeding.

A complete and sequential description of this procedural activity is set out in the Appeal Board's decision.~4/

On March 15, 1980, ECNP filed a petition for review of the Licensing Board's prehearing rulings by the CaanissionP In that petition, ECNP made nine Q2 NR ta s First Round Discovery Requests of the Envirormental Coalition on Nuclear Power (ECNP)" dated May 21, 1979 and

."Applicants'irst Set of Interrogatories to Intervenor ECNP" dated May 25, 1979.

j3 'Petition for Review of ALAB-613 by the NRC Commissioners" dated Octo-

'er 14, 1980.

(ECNP Petition).

Q4 Pennsylvania Power and Light Co.

(Susquehanna Steam Electric Station, Units 1 and 2), ALAB-613, 12 NRC (September 23, 1980).

(Slip opinion at 11 through 20)~

Q5 "Request to the NRC Commissioners for Expedited Consideration of Actions of an Atomic Safety and Licensing Board and Other Matters" dated March 14, 1980.

requests for relief, eight of which sought relief from scheduling and discovery rulings and one of which sought relief from 'the Licensing Board's refusal to certify ECNP's request that a Commissioner sit as a member of the Licensing Board.

In its tray 16, 1980 Order, the Commission refused ECNP's request for Commission involvement in the issuance of discovery protective orders, for disqualifica-tion and reconstitution of the Licensing Board, and for other similar reliefP This refusal was based on the Commission's statement that at that stage of the proceeding, Commission involvement was unwarranted unless exceptional circumstances were present.

Finding no such circumstances, the Comnission referred the matter to the Appeal Board for appropr iate actionP While noting that a Licensing Board's interlocutory rulings can be reviewed by an appeal board only if exceptional and important issues are raised and that questions about the proper scope of discovery normally do not raise such issues, the Appeal Board decided to review the Licensing Board's rulings because ECNP's allegations, if substantiated, would call into question the integrity of Commission licensing proceedings.+

In its decision, the Appeal Board addressed what it perceived to be the three major themes of 6

ennsy vania Power and Light Co.'Susquehanna Steam Electric Station, Units 1 and 2), CLI-80-17, 11 NRC 678 (1980).

Q7 Id. at 679.

Q8 Pennsylvania Power and Light Co.

(Susquehanna Steam Electric Station, Units 1 and 2), ALAB-613, 12 NRC (September 23, 1980).

(Slip opinion at 3-4).

ECNP's petition for review.

These involved (1) the "excessively large" number of interrogatories served upon ECNP, (2) the Licensing Board's failure to protect ECNP from that "abuse" of the discovery process, and (3)

ECNP's belief that, as a "public-interest" litigant, it was unfairly disadvantaged 9/

by the Commission's discovery rules.~

The Appeal Board found that ECNP's contentions put in issue a substantial number of significant matters and that the corresponding interrogatories appropriately reflected the number and complexity of the issues raised.

The Board thus found that the number of interrogatories did not constitute an abuse of the discovery process and that the Licensing Board correctly rejected ECNP's attempts to avoid answering any of the Applicants'nterrogatories.~

Further, the Appeal Board noted 101 that the Licensing Board, by its sympathetic rulings. which had substantially eased ECNP's discovery burden, had not permitted the abuse of ECNP's rights.~

Finally, the Appeal Board observed that ECNP believed that the Commission's discovery rules disadvantaged it because the rules place an equal burden on all parties in responding to discovery requests.

The Appeal Board stated that simply as a matter of fairness, a Licensing Board may not waive the discovery rules for one side and not for the other.~

Thus, on the basis of the above conclusions, the Appeal Board denied the relief requested by ECHP.~

+9 Id. at 21.

~10 Id. at 31.

~11 Id. at 38.

+12 Id.

~13 Id. at 42.

III.

ARGUMENT A.

Commission Review of ALAB-613 Should Not Be Granted 1.

Section

2. 786 b

1 of the Commission's Rules of Practice Precludes this eal ECNP's petition for Commission review of ALAB-613 states that it is filed pursuant to 10 C. F.R.

5 2.786. Section 2.786(b)(1) provides for Commis-14/

sion review of an Appeal Board decision "otherthan-a decision or action on referral or certification under 5 2.718(i) or 3 2.730(f)."

As noted earlier at page 3, the decision in ALAB-613 was rendered after referral from the Commission for appropriate action.~

As the Appeal. Board noted, the Rules 15/

of Practice gave it discretionary authority to review "interrogatory rulings."

They decided to exercise their certification jurisdiction, therefore rendering the decision in ALAB-613 under section 2.718(i).+

Thus, the Commission's Rules of Practice expressly preclude ECNP's request for review.

2.

Section 2.730 f of the Commission's Rules of Practice Precludes Inter-ocutor A

eals of Licensin Board Rulin s to the Commission When this matter first went to the Commission, ECNP labelled its petition as an emergency request and specifically disclaimed its interlocutory nature.

In its order,

however, the Commission implicitly recognized the interlocutory nature of ECNP,'s appeal by citing 10 CFR 2.730(f) and referred it to the 1

CNP etstion at 1.

~15 Pennsylvania Power and Light Co.

(Susquehanna Steam Electric Station, Units 1 and 2), CLI-80-17, ll NRC 678, 679 (1980).

~16 Pennsylvania Power and Light Co.

(Susquehanna Steam Electric Station, Units 1 and 2), ALAB-613, 12 NRC

. (Slip opinion at 3 through 4).

17/

"Request to the NRC Commissioners for Expedited Consideration of Actions of an Atomic Safety and Licensing Board and Other Matters" dated March 14, 1980 at 1 n. 1.

Appeal Board for appropriate action under 10 C. F.R.

5 2.785.

Section 2.730(f) expressly prohibits the taking of an interlocutory appeal to the Commission from a ruling of the presiding officer but does permit a presiding officer to certify such a question if necessary to prevent detriment to the public interest or unusual delay or expense.

The mere fact that the Appeal Board reviewed the Licensing Board's rulings on discovery and scheduling and affirmed their pro-priety does not change their nature.

Such rulings continue to be interlocutory because they neither dispose of any segment of the case nor terminate the right of any party to participate.~

The instant petition is an interlocutory appeal and should not be entertained by the Commission.

3.

No New Circumstances Shown Marrantin Commission Reversal of its Earlier Decision not to Involve Itself While the Commission on its own could undertake to review this matter,~

when earlier presented with the same underlying question the Commission found no exceptional circumstances warranting its involvement.~

ECNP does not allege any new circumstances in this matter relative to those alleged in its March 15, 1980 petition to the Commission.

Thus, the situation remains the same but for the passage of time and the rendering of an Appeal Board decision which found no error in the Licensing Board's discovery rulings.

~18 Toledo Edison Com n

(Davis Besse Power Station),

ALAB-300, 2 NRC 752, 758 1975

~19 10 C.F.R. 5 2.786(a).

See United States Ene Research and Develo ment Administration Pro ect Hana ement Cor oration Tennessee Va11e Authorit Clinch River Breeder Reactor Plant, CLI-76-13, 4 NRC 67, 74-76 1976; Public Service Com an of New Ham shire (Seabrook Station, Units 1 and 2),

LI- -8, 5

NRC 5 3, 516, 517 1977, affirmed New En land Coalition on Nuclear Pol'lution v.

NRC, 582 F.'2d 87 ~1st Cir. 1978 See also, F or>de ower and Li ht Com n

(St. Lucie Plant, Units Nos.

1 and 2~CLI-77-15, 5

NRC 1324, 1325 1977.

~20 Pennsylvania Power and Light Co.

(Susquehanna Steam Electric Station, Units 1 and 2), CLI-80-17,. 11 NRC 678, 679 (1980).

Under the standard enunciated earlier in this case, there is no basis for Commission review of ALAB-613.

4.

ECNP's Petition Does Not Raise a Le al

Factual, or Polic Issue of

~

Sufficient Im ortance Warrantin Commission Review Finally, even if one assumed that ECNP's petiton were permitted by 10 CFR 5 2.786 and that the appeals were not interlocutory in nature, ECNP's peti-tion would still fail to meet the relevant standard.

Section 2.786(b)(1) states that a party may file a petition for review with the Commission on the ground that the decision or action is erroneous with respect to, an important question of fact, law, or policy.

Section 2.786(b)(4)(i) states that a petition for review of matters of law or policy will not ordinarily be granted unless it appears the case

involves, among other things, an important procedural issue.

ECNP claims that,it has raised such an issue.~

Essentially, the issue raised is whether an intervenor should shoulder a

discovery burden equal to that of the other parties to a licensing proceeding.

The policy reasons underlying the Cmeission's discovery rules are of long standing and have been considered and extensively discussed in prior agency decisions.~

The rationale for those discovery rules was discussed at 22/

~1 Moreover, if this petition was assumed to raise an important question of fact, section 2.786(b)(4)(ii) states that a petition for review of matters of fact will not be granted unless it appears the Appeal Board,.has. decided-a factual issue in a clearly erroneous manner contrary to the licensing board's resolution of the same issue.

10 CFR 5 2.786(b)(4)(ii).

Both the Licensing and Appeal Boards resolved the issue in question here con-sistently and thus Commission review should be denied.

+22 Boston Edison Co. (Pilgrim Nuclear Generating Station, Unit 2), LBP-75-30,

'!l};Bi }.}Z} } }.}}} }}2}. ALAB-196, 7 AEC 457 1974 length by the Appeal Board in ALAB-613. As expressed in the Appeal Board's

decision, they are (1) the belief that a litigant should not be able to make serious allegations against another party without having to reveal the basis for the allegations and (2) the fact that because contentions merely provide general notice of the issues various discovery devices need to be used to narrow the contentions so that the evidence produced at the hearing relates only to those matters which are actually controverted.~
Thus, the Rules 231 of Practice impose equal burdens on all parties in the interests of fairness and efficiency.

The decision below demonstrates the proper application of established discovery rules and does not raise an issue of important legal, factual, or policy matters warranting Commission review. ECNP s petition for review does not demonstrate otherwise and should be denied. B. Other Matters Raised in ECNP's Petition Do Not Warrant Commission Review or Re uest Relief Which Should Be Denied In its petition for review, ECNP also requested that the Commission (I) clar-ify the term "undue burden" as it is used in 10 C.F.R. 2.740(c), (2) clearly define what constitutes an "acceptable" or "adequate" response to interroga-

tories, (3) include a Commissioner on a reconstituted Licensing Board, (4) suspend further proceedings uritil the Final Safety Analysis Report has been completed and ENCP has had adequate time to review it, and (5) provide adequate intervenor funding.

All of these requests but the fifth were raised previously in ECNP's petition for Commission review of March 14, 1980. 24/ Li h C. tS h S Units I and 2), ALAB-613, 12 NRC (September 23, 1980) (Slip opinion at 40 and 30). ~24 "Request to the NRC Commissioners for Expedited Consideration of Actions of an Atomic Safety and Licensing Board and Other Matters" dated March 14, 1980 at 5.

9 With respect to ECNP's requests for Commission definitions, the Staff notes at the outset that definition of what constitutes "undue burden" or "accept-able/adequate" involves factual determinations; Practically speaking, it, would be difficult for the Commission to develop generic definitions as what may constitute "undue burden" or "acceptable/adequate" in one case may not in another case. In this case, what constitutes "undue burden" or "acceptable/ adequate" was essentially defined by the original Licensing Board rulings which were affirmed by the Appeal Board in their entirety.

Thus, because both the Licensing and Appeal Boards were consistent in this regard, there is no reason for the Commission to involve itself in these questions.

ECNP's request that the Licensing Board be reconstituted so that a Commissioner sits on it is an extraordinary request which was considered by the Commission at the time it referred the matter to the Appeal Board. At 'that time, the Cmmission determined there was no need to involve itself. ECNP presents no additional reasons in its most recent petition for Commission involvement at 'I this time. The Final Safety Analysis Report is continuously amended. Therefore, there is no reason to stay the proceeding until it is completed. There is no preju-dice to ECNP in proceeding with those parts that have already been completed. Again, this question was raised earlier. ECNP has given no additional reasons for the Commission to do more than it did the first time. The question of funding intervenor participation in licensing proceedings has been raised previously before the Commission and it has declined to grant funds to Int'ervenors. Metro olitan Edison Co. (Three Mile Island Station, Unit'No. 1), CLI-80-19, 11 NRC 700 (1980); Financial Assistance to Partici ants in Commission Proceedin s, 4 NRC 494 (1976). In the fiscal 1981 appropriation act, Congress expressly prohibited the use of funds appropriated under that act to pay the expenses of parties intervening in licensing proceedings. Accordingly, ECNP's request for funding should be 25/ denied. IV. CONCLUSION For the reasons stated

above, the Staff urges that Commission review of ALAB-613 should not be granted.
Further, the Staff urges that the Commission find that with regard to the other matters raised in ECNP's petition, either the matter is not appropriate for Commission involvement or that the relief requested is not warranted and should be denied.

Respectfully submitted, Jessica H. Laverty Counsel for NRC Staff Dated at Bethesda, Maryland this 30th day of October, 1980 ~25 Pub. L. No. 96-367, 94 Stat. 1331 (1980). Section 502 in relevant part states: "None of the funds in this Act shall be used to pay the expenses of, or otherwise compensate, parties intervening in regulatory or adjudicatory proceedings funded in this Act. "

UNITED STATES OF AMERICA NUCLEAR REGULATORY, COMMISSION BEFORE THE COMMISSION In the Matter of PENNSYLVANIA POWER AND LIGHT CO. ALLEGHENY ELECTRIC COOPERATIVE, INC. (Susquehanna Steam Electric Station, Units 1 and 2) Docket Nos. 50-387 50-388 NOTICE OF APPEARANCE Notice is hereby given that the undersigned attorney herewith enters an appearance in the captioned matter. In accordance with 62.713(a), 10 CFR Part 2, the following information is provided: Name Address Telephone Number Admission Name of Party Jessica H. Laverty U.S. Nuclear Regulatory Commission Office of the Executive Legal Director Washington, DC 20555 Area Code 301 - 492-7657 Supreme Court of the State of Virginia NRC Staff U.S. Nuclear Regulatory Commission Washington, DC 20555 Dated at Bethesda, Maryland this 29th day of October, 1980 J ssica H. Laverty Counsel for NRC Staff

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of PENNSYLVANIA POWER Af<D LIGHT CO. ALLEGHENY ELECTRIC COOPERATIVE, INC. ) (Susquehanna Steam Electric Station, Units I and 2) Docket Nos. 50-387 50-388 CERTIFICATE OF SERVICE I hereby certify that copies of "NRC STAFF'S ANSWER IN OPPOSITION TO ECNP'S PETITION FOR COMMISSION REVIEW OF ALAB-613" and "NOTICE OF APPEARANCE" for Jessica H. Laverty, both in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class, or, as indicated by an asterisk, through deposit in the Nuclear Regulatory Commis-sion's internal mail system, this 30th day of October, 1980: Samuel J. Chilk* Secretary of the Commission U.S. Nuclear Regulatory Commission Mashington, DC 20555 Leonard Bickwit* General Counsel Office of the General Counsel U.S. Nuclear Regulatory Commission Washington, DC 20555

  • Richard S. Salzman, Esq.,

Chairman Atomic Safety 8 Licensing Appeal Board U.S. NucIear Regulatory Commission Mashington, D.C. 20555

  • Dr. John H. Buck, flember Atomic Safety 8 Licensing Appeal Board U.S. Nuclear Regulatory Commission Washington, D.C.

20555 <<Mr. Thomas S. Moore, Member Atomic Safety 5 Licensing Appeal Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Jay Silberg, Esq. Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.M. Washington, D.C. 20036 Bryan A. Snapp, Esq. Pennsylvania Power tt Light Company Two North Ninth Street Allentown, Pennsylvania 18101 Dr. Judith H. Johnsrud Co-Director Environmental Coalition on Nuclear Power 433 Orlando Avenue State College, Pennsylvania 16801 Mr. Thomas M. Gerusky, Director Bur eau of Radiation Protection Department of Environmental Resources Commonwealth of Pennsylvania P. 0. Box 2063 Harrisburg, Pennsylvania 17120 Ms. Colleen Marsh Box 538A, RD84 Mountain Top, Pennsylvania 18707 Mrs. Irene Lemanowicz, Chairperson The Citizens Against nuclear Dangers P. 0. Box 377 RDr.1 Berwick, Pennsylvania 18503

  • Charles Bechhoefer, Esq.,

Chairman Atomic Safety & Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Glenn 0. Bright, Member Atomic Safety & Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555

  • Dr. Oscar H. Paris, Member Atomic Safety 8 Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.

20555 ~Atomic Safety & Licensing Board Panel U.S. Nuclear Regulatory Comnission Washington, D.C. 20555 ~Atomic Safety & Licensing Appeal Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Susquehanna Environmental Advocates c/o Gerald Schultz, Esq. P. 0. Box 1560 Wilkes-Barre, PA 18703 Mr. Robert M. Gallo Resident Inspector P. 0. Box 52 Shickshinny, Pennsylvania 18655 Karin W. Carter, Esq. Department of Environmental Resources 505 Executive House P. 0. Box 2357 Harrisburg, Pennsylvania 17120 Docketing and Service Section (12) Office of the Secretary U.S. Nuclear Regulatory Commission Washington, DC 20555 L~vc~ essica H. Laverty Counsel for NRC Staff}}