ML18026A030

From kanterella
Jump to navigation Jump to search
Letter Requesting That the Commission Suspend Operations at Peach Bottom Units 2 and 3 and That the Control Wiring to Be Installed at Limerick 1 and 2 and Berwick 1 and 2 Be Fireproof Also
ML18026A030
Person / Time
Site: Peach Bottom, Susquehanna, Limerick  Constellation icon.png
Issue date: 03/31/1975
From: Lochstet W
Central Pennsylvania Committee On Nuclear Power
To:
Office of Nuclear Reactor Regulation
References
Download: ML18026A030 (2)


Text

r e

s.'" '"g, lG>p'~~'rsr> el >,'rr e('Rrtjlys""~'p>>, r+

covcREEM rterrrrrirlrrororrrrlcker89&M40$+4eesrE s

Central, PennSy3VaniajECOmm.r;On

NuClear, Power,,:State'"Crollege,'a."'".,'r,';

"=,,'"';,"j",

TO Dir. of Regul'ation CONTROL NUM8ER - * -'.

-'-'" 8463

'.'ATE OF' OCUMENT'-

'3/31/75

='

AC'%ION PROCESSING DATES

~

'r Ackno'Erledged-r Qsinterim Reply:

'Final FILE LOCATION ACTION COMPLETION DEADLINE.

4/11/75 PREPARE FOR SIGNATURE OFt

-r s

Choirman Director of Regulotlon-

",'tssrbusss REFERRED'TO; r',';.* '"- >.'ATE Giambusso.:.-'f/action

< '4/4/75 IS. NOTIFICATIONTO THE JCAE RECOMMENDED.'

\\

I s

'.."'.f Docket-" Piles) 277

'.".:PDR '-'.;

50-278 50-352 50-353 50-387~

50-388 DESCRIPTION

'r'-Ltr-,',

E Q@rfginofrr'~ I

', QCopyr'N',"~'",-'Errr>rQOther ':

Req suspension-of 'operationsr at Peach Bottom 2 and 3 and construction 'of $imerick,and Berwick'until control REMARKS

~ E'r" '-

s r

'IZDR?

N *"

DO NOT DETACH THIS COPY M

DIRECTOR OF REGULATION COMMUNICATIONS CONTROL Form HQ-32 (1-73)

USAEC

Central Pennsylvania Committee'n Nuclear Poorer

,119 -. charon Grave

..State
College, Pa.,

16801 31 l~~arch 1975 Directorate of Regulation U.S.

'A~uclear Regulatory Commission

?.'ashinrton, D.C., 20"L5 Gentl men:

n vie+ of the fire which burned control cables of the emergency core cooling srsten at the HIro:ms Ferrv aslant on 22 ~:.arch 19/5, and th=t the

~each Bottom units 2 and 3

located in '%br'ounty,

."a.

are of ident'cal "'esi n s3.

np tne Central Pen~svlvania Co;.",?.".ittee onnuclear Po;,-er

~e? ueste r

that vou suspend operations at

?'each Bottom uni"s 2::- d 3

until such ti."ie as the control ~r.'irinp; can oe made firenroo~

..er".ore sine"-.

=our

-. o"e identic 1 units are under const;ruc o

~ n P.>.s rlv-".;"a at

? Ont.=ov;= v Cour tv Limerick 1 and 2 ~

a.?d Luserne Count;y: Bervrick 1 and 2, the >entral

. ennsvlv"? ia Y

.o~.";;i.tee on Kuc =-";".=o';.er re'u ~"-

w 4 that the control rririnz to 'oe installed in these plants be fireoroo also.

These requests are made in light of your po?'er under 10 C."..R.

50,,100 to revoke lic nses and re mi s and t?.,e arovisions of th.'-'.dministrative Procedure

'.ct.

dincerelg 'ours,

.'.. Loch tet Cha pro'w,

~<xe cu";."=ve

~oa r0 Central Co.-:;~.

on.".ucleer

""o::;or