Forwards Addl Info on Implementation of App R,Item Iii.J Re Emergency Lighting,Per DB Vassallo to Hg Parris. Schedule for Item Also Contained in Lm Mills
ML18025B851
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/17/1982
From: Kammer D
TENNESSEE VALLEY AUTHORITY
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8208230351
Download: ML18025B851 (6)


Text

)

gl a '~l A CC E'S S I ON N BR:

I FAGIL:50 259 50"260 50 296 AUTH'AME KAMh'ERgD ~ ST RECIP.NAME DENTONgH ~ RE

~

REGULATORY ORMATION DISTRIBUTION SY (RIDS) 8208230351 DOC. DATE: 82/08/17 NOTARIZED:

YES DOCKET Browns Ferry Nuclear Power Station~

Unit 1> Tennessee 05000259 Browns Fer ry induc l ear Power Stations Uni t 2<

Tennessee

~EKED Browns Ferry Nuclear Power Station< Unit 3>

Tennessee 05000296

~ AUTHuR AFFILIATION Tennessee Valley Authority RECIPIENT AFFILIATION Office of Nuclear Reactor Requlationt Director

SUBJECT:

For wards addi info on implementation of App R~ Item III~ J re emergency ligntingiper DB Vassallo 820622 ltr to HG Parris, Schedule for item also contained in LM Hills 820715 ltd DISTRIBUTION CODE:

AOOoS COPIES RECEIVED:LTR J EiXCL g SIZE:

TITLE:

OR Submittal: Fire Protection NGTES:NMSS/FCAF 1cy ~

NMSS/FCAF 1cy, NMSS/FCAF 1cy ~

05000259 05000260 05000296 RECIPIENT ID CODE/NAME ORb rr2 BC 01 INTERhAL: ELD/HOSE NRR FIORAVANT07 NRR/DE/CEB 09 OQ COPIES LTTR ENCL 3

3 1

0 2

2 2

1 1

RECIPIENT ID CODE/NAb'E IE F ILE NRR

'WAMBACH NRR/DL DIR RGN2 06 COPIES LTTR ENCL 1

1 1

0 1

1 1

1 EXTERNAL: ACHS NRC PDR NTIS NOTES:

11 02 3

1 1

1 1

1 1

LPDR NSIC 03 05 1

1 1

1 TOTAL NUMBER OF COP IES RE4IUL Rt. D:

LT TR 21 ENCL 19

(

f

TEi~NESSEE VALLEYAUTHORtTW CHATTANOOGA. TENNESSEE 37401 400 Chestnut Street Tower II August 17, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

In the Matter of the Tennessee Valley Authority

)

Docket Nos. 50-259

)

50-260 50-296 As requested in D. B. Vassallo's letter dated June 22, 1982 to H. G. Parris, we are providing the enclosed additional information for Browns Ferry regarding the implementation of Appendix R, Item III.J, emergency lighting.

Our schedule for this item is also contained in L. M. Mills'uly 15, 1982 letter to you on the Browns Ferry integrated schedule.

Very truly yours, TENNESSEE VALLEY AUTHORITY D '5 D. S.

Kammer Nuclear Engineer Subscribed ayd sworn t before me this

~

day of 1982.

Notary Public My Commission Expires Enclosure cc (Enclosure):

U.S. Nuclear Regulatory Commission Region II ATTN:

James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Mr. R. J. Clark Browns Ferry Project Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue

Bethesda, Maryland 20014 8208230351 820817 PDR ADOCK 05000259 F

PDR An ="qua!Gcpcr:un>tv =molcyer

/

I

ENCLOSURE 2 ~

\\ ~

RESPONSE

TO D. B. VASSALLO'S LETTER TO H. G. PARRIS DATED JUNE 22, 1982 ADDITIONAL INFORMATION REGARDING EMERGENCY LIGHTING AT BROMNS FERRY NUCLEAR PLANT APPENDIX R, ITEM III.J In response to your request, the following list includes the number of lights scheduled for installation and the number of mounting brackets installed.

Unit Location Total Li hts Brackets Installed 42 17 6

40 16 3

41 17 9

9 43 26 8

40 28 3

42 31

.11'9 1

Reactor Building Control Bay 1

Turbine Building 2

Reactor Building 2

Conrrol Bay 2

Turbdne BaQ.ddnB 3

Reactor Building 3

Control Bay 3..

- Turbine Building 1&2 Diesel Generator Building e Build 0

2 Radwast ing Totals 243 200 Although brackets have been lnstalled in preparation for installing additional emergency lights, the lights themselves have not been installed.

Very few ean be installed during unit operation since conduit and cable installations, including electrical tie-ins, could compromise safety systems because of intexference from x;igging and. scaffolding as well as from the movement of tools, equipment, and personnel.

Lights which could be installed during operation, if the manpower and associated resources were avaQ.able, axe those lights in the diesel generator and xadwaste buildings and some lights in the turbine building.

The schedule for installation of the eight-houx'mergency lighting to meet the requirements of 10 CFR 50, Appendix R, Section III.J, was submitted on October 28, 1981 as part of our integrated deferral schedul~.

Revision 1 to the integrated schedule was submitted July 15, 1982 and provided the schedule presently in use for allocation of resources needed to perform commitment modifications.

This schedule shows the installation of lights, battery pack, conduit and cable to main powex feeds to be completed during the unit 2, cycle 4; unit 1, cycle 5; and unft 3, cycle 5 outages for the respective units.

L a ~