ART.81%620 SEX 400 Chestnut Street Tower II October 20, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
In the Matter of the Tennessee Valley Authority Docket Nos.
50-259 50-260 50-296 The purpose of this letter is to formally notify the NRC staff regarding the plans of the Tennessee Valley Authority for performing r eload core design and analyses inhouse and to request a response as explained below.
On October 1,
1981 we met with members of the NRC staff in Bethesda, Maryland, to review TVA's plans for performing reload core design and analysis (RCDA) necessary to support licensing reload fuel cycles for the Browns Ferry Nuclear Plant.
The following is a summary of the pro)ected schedule for submittal of reports to the NRC and the dates by when NRC approval is needed as discussed on October 1,
1981.
The first reload amendment based primarily on TVA analyses will be for cycle 6 of unit 3 and will be submitted in June 1983.
Approval will be needed by October 1983.
The schedule for submittal and review of reports describing TVA analytical methods is as follows.
Analytical Method Report Submittal Date Requested A
roval Date RETRAN-02 (For System Transient Analysis)
General Description of TVA RCDA Methodology 1
Space-Time Kinetics T-H Stability Main Report-January 1982 Supplement July 1982 January 1982 Early 1983 Ear ly 1983 November 1982 Not a Topical Report.
Approval will not be requested.
Within 1 year of submittal Within 1 year of submittal 7
F Lt
Mr. Harold R. Denton October 20, 1981 As discussed during the meeting, approval of RETRAN by November 1982 is of particular significance because the unit 3 cycle 6 analyses will begin at that time.
We believe that review of the TVA RETRAN model will be facilitated by the generic RETRAN review currently in progress and also by the prior review of other utility RETRAN models.
In order to preclude impacting the above schedule, we request that you inform us in writing by December 1,
1981 if our submittals will be reviewed in the time frame requested.
Your cooperation in this matter is greatly appreciated.
Very truly yours, TENNESSEE VALLEY AUTHORITY
. M. Mills, anager Nuclear Regulation and Safety
- E f, (-
fj.
i,Subscrib'~n sworn to ef me,this
~ day of 1981
~
'.Notary Public
/
My Commission Expires JAD RER:SCP cc:
ARMS, 640 CST2-C A. W. Crevasse, 401 UBB-C H. N. Culver, 249A HBB-K H. J. Green, 1750 CST2-C J. A. Raulston, W10C126 C-K H. S. Sanger, Jr.,
E11B33 C-K F. A. Szczepanski, 417 UBB-C Browns Ferry - NRC Inspector s A. T. Mullins, 403 KB-C COORDINATED:
NFPB/JRRatliff memo to LMMills dated 10/6/81
h e
tl
~ ~y e
~
V ~w
~
I I
I I', f
QVA~TT4 (0$ -0.05)
UNITED "TATES GOVERNi~IENT Memorandum TENNESSEE VALLEYA TH RITY TO L. M. Mills, Manager, Nuclear Regulation and Safety, 400 CST2-C F ROTI DATE J.
R. Ratliff, Chief, Nuclear Fuel Branch, 409 KB-C October 6, 1981
SUBJECT:
FOLLOWUP TO OCTOBER 1
NRC HEETXNG As requested by Jim Domer, we have drafted the attached letter which lists the key reports to be submitted to NRC in support of our Reload Core Design and Analysis program.
We understand that you will transmit this letter to NRC after adding a paragraph which requests a formal response to our proposed submittal and approval dates.
Please contact Jerry Robertson at extension 6631 if you have questions.
JRR:JDR:TAC Attachment cc (Attachment):
ARMS, 640 CST2-C
-Ect:-1VE,'D OCT 7 188):
B>vf PRO>fCT SfCTIOTT PCEtVFD CT 07 1981 yGULIITORY STAFF Buy U.S. Savings Bonds Regularly on the Payroll Savings Plan
DRAFT, JDR:TAC, 10/5/81 C
409 Krystal Building October 6, 1981 Nuclear Regulatory Commission Dear TVA and NRC staff met on October 1,
1981, in Bethesda to review TVA's plans for performing reload core design and analysis (RCDA) necessary to support licensing reload fuel cycles for the Browns Ferry 'Nuclear j
Plant.
The first reload amendment to be based primarily on TVA analyses will be for cycle 6 of unit 3 and will be submitted in June 1983.
TVA proposed the following schedules for submittal and review of reports describing TVA analytical methods.
Analytical Method Report Submittal Date Requested RETRAN-02 (For System Transient Analysis)
Hain Report
- January, 1982 Supplement
- July, 1982
- November, 1982 General Description of TVA RCDA Methodology
- January, 1982 Not a Topical Report.
Approval will not be Requested.
Space-Time Kinetics T-H Stability Early 1983 Early'983 Within 1 Year of Submittal Within 1 Year of Submittal As discussed during the meeting, approval of RETRAN by November, 1982, is of particular significance because the unit 3, cycle 6 analyses will begin at that time.
We believe that review of the TVA RETRAN model will be facilitated by the generic RETRAN review currently in progress and also by the prior review of other utility RETRAN models.
Nuclear Regulatory Agency October 5, -1981 (Paragraph to be added by Regulatory Staff to request NRC -concurrence with above schedules.)
Very truly yours, TENNESSEE VALLEY AUTHORITY