Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M4461999-10-20020 October 1999 Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project ML20217J4151999-10-15015 October 1999 Forwards Request for Addl Info Re Util 990624 Application for Amend of TSs That Would Revise TS for Weighing of Ice Condenser Ice Baskets ML18039A9011999-10-15015 October 1999 Forwards RAI Re 990423 Submittal of Proposed risk-informed ISI Program for Plant,Unit 3.Response Requested by 991101 ML20217E0711999-10-14014 October 1999 Grants Approval for Util to Submit Original,One Signed Paper Copy & Six CD-ROM Copies of Updates to FSAR as Listed,Per 10CFR50.4(c),in Response to ML18039A8881999-10-0808 October 1999 Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors ML20217D3261999-10-0808 October 1999 Responds to Re Event Concerning Spent Fuel Pool Water Temperature Being Undetected for Approx Two Days at Browns Ferry Unit 3 ML20217F7751999-10-0808 October 1999 Confirms 991006 Telcon Between T Abney of Licensee Staff & a Belisle of NRC Re Meeting to Be Conducted on 991109 in Atlanta,Ga to Discuss Various Maintenance Issues ML18039A8851999-10-0808 October 1999 Responds to Ltr of 990903 Re Event Last Year at Browns Ferry Unit 3,where Rise in Spent Fuel Pool Water Temp Went Undetected for Approx Two Days.Record Copy ML20217G1141999-10-0707 October 1999 Responds to from P Salas,Providing Response to NRC Risk Determination Associated with 990630 Flooding Event at Sequoyah Facility.Meeting to Discuss Risk Determination Issues Scheduled for 991021 in Atlanta,Ga ML20217B2981999-10-0606 October 1999 Discusses Closeout of GL 92-01,rev 1,suppl 1, Reactor Vessel Integrity, for Sequoyah Nuclear Plant,Units 1 & 2. NRC Also Hereby Solicits Any Written Comments That TVA May Have on Current Rvid Data by 991101 ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams ML20212J5981999-10-0101 October 1999 Forwards SE Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plnat,Unit 1 ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample IR 05000259/19990051999-10-0101 October 1999 Forwards Insp Repts 50-259/99-05,50-260/99-05 & 50-296/99-05 on 990725-0904.No Violations Noted.Conduct of Activities at Browns Ferry Nuclear Facility Generally Characterized by safety-conscious Operations & Sound Engineering ML20217B5481999-10-0101 October 1999 Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20212M1481999-09-28028 September 1999 Refers to Management Meeting Conducted on 990927 at Region II for Presentation of Recent Plant Performance.List of Attendees & Copy of Presentation Handout Encl ML20217A9451999-09-27027 September 1999 Forwards Insp Repts 50-327/99-05 & 50-328/99-05 on 990718- 0828.One Violation Identified & Being Treated as Non-Cited Violation ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band ML20212F4501999-09-23023 September 1999 Forwards Amends 246 & 237 to Licenses DPR-77 & DPR-79, Respectively & Ser.Amends Approve Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20212F0751999-09-23023 September 1999 Forwards SER Granting Util 981021 Request for Relief from ASME Code,Section XI Requirements from Certain Inservice Insp at Sequoyah Nuclear Power Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) ML18039A8731999-09-23023 September 1999 Forwards Suppl to Ser,Approving Amends 259 & 218 to Licenses DPR-52 & DPR-68 Re Approval of 14-day Allowable Outage Time for Emergency Diesel Generators.Suppl Issued to Correct Error Contained in Original SER ML20212F7751999-09-22022 September 1999 Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses ML20212D3651999-09-20020 September 1999 Forwards SE Accepting Licensee 990430 Proposed Rev to Plant, Unit 3 Matl Surveillance Program ML20212A1631999-09-13013 September 1999 Forwards W Rept WCAP-15224, Analysis of Capsule Y from TVA Sequoyah Unit 1 Reactor Vessel Radiation Surveillance Program, Rev 0.Errata Sheet Containing Three Correction Pages to WCAP-15224 Also Encl ML20211Q0311999-09-10010 September 1999 Requests Written Documentation from TVA to Provide Technical Assistance to Region II Re TS Compliance & Ice Condenser Maint Practices at Plant ML18039A8721999-09-10010 September 1999 Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util .Licensee Expects to Resubmit Revised Program within Approx 6 Wks ML20211Q5731999-09-0909 September 1999 Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl ML20216F5441999-09-0707 September 1999 Provides Results of Risk Evaluation of 990630,flooding Event at Sequoyah 1 & 2 Reactor Facilities.Event Was Documented in Insp Rept 50-327/99-04 & 50-328/99-04 & Transmitted in Ltr, ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study ML20211G5881999-08-27027 August 1999 Submits Summary of 990820 Management Meeting Re Plant Performance.List of Attendees & Matl Used in Presentation Enclosed ML20211G6491999-08-26026 August 1999 Confirms Telcon with T Abney on 990824 Re Mgt Meeting Which Has Been re-scheduled from 990830-0927.Purpose of Meeting to Discuss BFN Status & Performance ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c ML18039A8581999-08-23023 August 1999 Forwards Insp Repts 50-259/99-04,50-260/99-04 & 50-296/99-04 on 990613-0724 at Browns Ferry Npp.Four Violations Identified & Being Treated as non-cited Violations ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 ML20210V1471999-08-13013 August 1999 Forwards Insp Repts 50-327/99-04 & 50-328/99-04 on 990601- 0717.One Potentially Safety Significant Issue Identified.On 990630,inadequate Performance of Storm Drain Sys Caused Water from Heavy Rainfall to Backup & Flood Turbine Bldg ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 ML18039A8411999-08-12012 August 1999 Informs of Completion of Acceptance Review of Proposed risk- Based ISI Program for Browns Ferry Unit 3.Determined Application Suitable for Further Evaluation.Suggests That 981023 Application Be Withdrawn & New Application Prepared ML20210Q6931999-08-0909 August 1999 Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants ML18039A8371999-08-0606 August 1999 Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept ML20210Q4421999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006. Authorized Representative of Facility Must Submit Ltr with List of Individuals to Take exam,30 Days Before Exam Date ML20210Q5011999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at Sequoyah Nuclear Plant. Sample Registration Ltr Encl ML18039A8341999-08-0303 August 1999 Discusses Info Provided by TE Abney on 990330 Re Reanalysis of Control Room,Site Boundary & Low Population Zone Doses. Forwards Safety Evaluation,Which Supplements 980811 Safety Evaluation,Supporting New Dose Caluculations ML18039A8291999-08-0202 August 1999 Forwards Amends 259 & 218 to Licenses DPR-52 & DPR-68, Respectively.Amends Change TS Completion Time for Required Action 3.8.1.B.4 from Existing 7 to 14 Days ML20210N1051999-08-0202 August 1999 Forwards SE Accepting Licensee 990326 Request for Relief from ASME B&PV Code,Section XI Requirements.Request for Relief 3-ISI-7,pertains to Second 10-year Interval ISI for Plant,Unit 3 ML20210L4291999-08-0202 August 1999 Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c ML20210L1611999-07-30030 July 1999 Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 ML20210G5301999-07-28028 July 1999 Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 ML20210G8991999-07-28028 July 1999 Discusses 990726 Open Mgt Meeting for Discussion on Plant Engineering Status & Performance.List of Attendees & Presentation Handout Encl 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217M4461999-10-20020 October 1999 Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project ML18039A8881999-10-0808 October 1999 Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample ML20217B5481999-10-0101 October 1999 Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band ML20212F7751999-09-22022 September 1999 Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses ML20212A1631999-09-13013 September 1999 Forwards W Rept WCAP-15224, Analysis of Capsule Y from TVA Sequoyah Unit 1 Reactor Vessel Radiation Surveillance Program, Rev 0.Errata Sheet Containing Three Correction Pages to WCAP-15224 Also Encl ML18039A8721999-09-10010 September 1999 Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util .Licensee Expects to Resubmit Revised Program within Approx 6 Wks ML20211Q5731999-09-0909 September 1999 Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 ML20210Q6931999-08-0909 August 1999 Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants ML18039A8371999-08-0606 August 1999 Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept ML20210L4291999-08-0202 August 1999 Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c ML20210L1611999-07-30030 July 1999 Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 ML20210G5301999-07-28028 July 1999 Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 05000296/LER-1999-004, Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B)1999-07-26026 July 1999 Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B) ML20210F3031999-07-22022 July 1999 Submits Rept Re Impact of Changes or Errors in Methodology Used to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.One Reportable non-significant Error Was Found During Time Period of 980601-990630 ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants ML20196K0381999-06-30030 June 1999 Provides Written Confirmation of Completed Commitment for Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Snp,Per GL 92-08 05000260/LER-1999-004, Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF1999-06-28028 June 1999 Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF ML18039A8111999-06-25025 June 1999 Requests Permanent Relief from Inservice Insp Requirements of 10CFR50.55a(g) for Volumetric Exam of Bfn,Unit 3 Circumferential RPV Welds,Per GL 98-05 ML20196F8131999-06-22022 June 1999 Forwards Rev 24 to Security Personnel Training & Qualification Plan,Per 10CFR50.54(p).Rev Withheld 05000260/LER-1999-003, Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept1999-06-22022 June 1999 Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept ML20196G7881999-06-22022 June 1999 Informs NRC of Changes That Util Incorporated Into TS Bases Sections & Trm.Encl Provides Revised TS Bases Pages & TRM Affected by Listed Revs ML20196G1801999-06-21021 June 1999 Requests Termination of SRO License SOP-20751-1,for Lf Hardin,Effective 990611.Subject Individual Resigned from Position at TVA ML18039A8031999-06-18018 June 1999 Responds to NRC Staff Verbal Request Re TS Change TS-376, Originally Submitted on 970312, & Proposed Changes to TS to Extend Current 7-day AOT for EDGs to 14 Days ML20195G1821999-06-0808 June 1999 Requests NRC Review & Approval of ASME Code Relief for ISI Program.Encl 1 Provides Relief Request 1-ISI-14 That Includes Two Attachments.Encl 2 Provides Copy of Related ASME Code Page ML20195E9521999-06-0707 June 1999 Requests Relief from Specific Requirements of ASME Section Xi,Subsection IWE of 1992 Edition,1992 Addenda.Util Has Determined That Proposed Alternatives Would Provide Acceptable Level of Quality & Safety ML20195D3321999-06-0101 June 1999 Informs That Cb Fisher,License OP-5525-4,can No Longer Maintain License at Plant Because of Physical Condition That Causes Licensee to Fail to Meet Requirements of 10CFR55.21 ML18039A7931999-06-0101 June 1999 Provides Summary of Major Activities Performed at BFN During Scheduled Unit 2 Cycle 10 Refueling Outage ML20195B9361999-05-24024 May 1999 Informs That Do Elkins,License SOP-3392-6,no Longer Needs to Maintain License as Position Does Not Require License ML18039A7911999-05-24024 May 1999 Informs That by Meeting Test Criteria Established by Test Based on Ansi/Ans 3.5-1985 (License Amends 254 & 214) power- Uprate Simulation Acceptable for Operator Training ML18039A7891999-05-24024 May 1999 Informs That Oscillation Power Range Monitor Module Has Been Enabled for Current Cycle of Operation Following Unit 2 Cycle 10 Refueling Outage Which Was Completed on 990509 ML20195B3631999-05-21021 May 1999 Requests Termination of SRO License for Tj Van Huis,Per 10CFR50.74(a).TJ Van Huis Retired from Util,Effective 990514 ML20206U6551999-05-14014 May 1999 Informs That ML Meek & Wd Dawson Will No Longer Need to Maintain SRO Licenses at Plant,Due to Termination of Employment,Effective 990521 ML20206Q8791999-05-13013 May 1999 Forwards L36 9990415 802, COLR for Sequoyah Nuclear Plant Unit 2,Cycle 10, IAW Plant TS 6.9.1.14.c 05000327/LER-1999-001, Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)1999-05-11011 May 1999 Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv) ML20206M9341999-05-10010 May 1999 Forwards Rept of SG Tube Plugging During Unit 2 Cycle 9 Refueling Outage,As Required by TS 4.4.5.5.a.ISI of Unit 2 SG Tubes Was Completed on 990503 ML20206Q8421999-05-10010 May 1999 Forwards Medical Info on DM Olive,License SOP-20540-2,in Response to NRC 990428 Telcon.Encl Withheld from Public Disclosure IAW 10CFR2.790(a)(6) 05000296/LER-1999-003, Forwards LER 99-003-00,providing Details Re Plant HPCI Sys Being Declared Inoperable Due to Loose Electrical Connection.Ltr Contains No Commitments1999-05-0606 May 1999 Forwards LER 99-003-00,providing Details Re Plant HPCI Sys Being Declared Inoperable Due to Loose Electrical Connection.Ltr Contains No Commitments ML20206K6271999-05-0606 May 1999 Requests Termination of SRO License for MR Taggart,License SOP-21336 Due to Resignation on 990430 ML20206J2061999-05-0404 May 1999 Requests Relief from Specified ISI Requirements in Section XI of ASME B&PV Code.Tva Requests Approval to Use Wire Type Penetrameters in Lieu of Plaque Type Penetrameters for Performing Radiographic Insps.Specific Relief Request,Encl ML20206H5901999-04-30030 April 1999 Forwards Notification of Revs to BFN Unit 2 Emergency Response Data Sys Data Point Library.Revs Were Implemented on 990413 ML18039A7741999-04-30030 April 1999 Forwards Proposed Rev to BFN Unit 3 RPV Matl Surveillance Program,For NRC Approval ML18039A7591999-04-27027 April 1999 Forwards Annual Radiological Environ Operating Rept Browns Ferry Nuclear Plant 1998. Rept Includes Results of Land Use Censuses,Summarized & Tabulated Results of Radiological Environ Samples in Format of Reg Guide 4.8 & NUREG-1302 1999-09-09
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20044A7011990-06-25025 June 1990 Forwards Endorsement 15 to Maelu Policy M-75 ML20245C9081989-04-11011 April 1989 Forwards Endorsements 63 & 64 to Maelu Policy MF-102, Endorsements 71 & 72 to Nelia Policy NF-247.Endorsements 106 & 107 to Nelia Policy NF-198,Endorsement 11 to Nelia Certificates N-38,N-39 & N-40 & Endorsement 10 to MF-75 ML20235K9091989-01-31031 January 1989 Forwards Endorsement 89 to Maelu Policy MF-66 & Endorsement 103 to Nelia Policy NF-198 ML20206F2581988-11-0101 November 1988 Forwards Endorsements 102,67,43,33 to Nelia Policies NF-198, NF-247,NF-256 & NF-258,respectively,Endorsements 88,59 to Maelu Policies MF-66 & MF-102,respectively & Endorsements 9 to Nelia Certificates N-38,N-38,N-40,respectively ML20150E3561988-07-0505 July 1988 Forwards Endorsements 101,87,66,58 & 42 to Nelia Policies NF-198,MF-66,NF-247,MF-102 & NF-256,respectively ML20154P0371988-05-26026 May 1988 Forwards Policy Endorsments,Including Endorsments 51,36,91 & 77 to Nelia Policies NF-252,NF-281,NF-182 & NF-238, Respectively & Endorsements 32,28,72 & 65 to Maelu Policies MF-108,MF-112,MF-61 & MF-93,respectively ML20148A7801988-03-14014 March 1988 Urges That TVA Harassment & Intimidation of TVA & Contractor Engineers Be Reopened as Restart Issue to Assure That Harassment of Workers Not Blocking Identification & Resolution of Serious Safety Problems Prior to Restart ML20150D4821988-02-23023 February 1988 FOIA Request for All Plans (Subsequent to Util 870807 Commitment to Excellence Action Plan) by Util to Commission Re Restart of Facility ML20236F7221987-10-0202 October 1987 Forwards,On Behalf of Util,Request for Exemption Per 10CFR50.12(a)(2)(v).Fee Paid ML20214J5521987-05-21021 May 1987 Forwards Amended Endorsement 53 to Maelu Policy MF-102, Amended Endorsement 61 to Nelia Policy NF-247,Endorsement 52 Tomaelu Policy MF-102 & Endorsement 60 to Nelia Policy NF-247 ML17347A4841987-05-0707 May 1987 Forwards Endorsements 72,104,46,67,83,96 & 59 to Nelia Policies NF-238,NF-215,NF-252,NF-227,NF-185,NF-198 & NF-247 & Endorsements 60,86,27,54,70,82 & 51 to Maelu Policies MF-93,MF-78,MF-108,MF-88,MF-55,MF-66 & MF-102,respectively ML20214M8271986-07-30030 July 1986 Forwards Endorsements 1,34,54 & 91 to Nelia Policies N-104, NF-256,NF-247 & NF-198 & Endorsements 1,47 & 78 to Maelu Policies M-104,MF-102 & MF-66 Respectively ML20211C2281986-05-21021 May 1986 Forwards Endorsements 74,46,45,76,77 & 83 to Maelu Policies MF-66,MF-102,MF-102,MF-66,MF-66 & MF-78,respectively & Endorsements 87,53,52,89,90,33 & 100 to Nelia Policies NF-198,247,247,198,198,256 & 215,respectively ML20211C7541986-05-12012 May 1986 Forwards Endorsements,Including Endorsement 75 to Maelu Policy MF-66,Endorsement 88 to Nelia Policy NF-198, Endorsement 44 to Maelu Policy MF-102,Endorsement 51 to Nelia Policy NF-247 & Endorsement 70 to Maelu Policy MF-90 ML20205J2441986-01-16016 January 1986 Forwards Endorsement 31 to Nelia Policy NF-256 ML17346B1681986-01-0606 January 1986 Forwards Endorsements to Nelia & Maelu Policies,Including Endorsement 22 to Nelia Policy NF-281,Endorsement 15 to Maelu Policy MF-112 & Endorsements 6 to Nelia & Maelu Certificates N-97 & M-97 ML20154B8781985-11-25025 November 1985 FOIA Request for Seven Categories of Documents Re Hydrodynamic Loads in BWR Pressure Suppression Containments ML20125C4351985-06-0707 June 1985 Forwards Endorsement 84 to Nelia Policy NF-198 & Endorsement 71 to Maelu Policy MF-66 ML20117A7061985-05-0101 May 1985 Forwards Endorsements 83 & 70 to Nelia Policy NF-198 & Maelu Policy MF-66,respectively ML20117A6581985-05-0101 May 1985 Forwards Endorsement 48 to Nelia Policy NF-247 & Endorsement 41 to Maelu Policy MF-102 ML20100F3881985-03-27027 March 1985 Forwards Endorsement 82 to Nelia Policy NF-198 ML20100E7441985-03-27027 March 1985 Forwards Endorsement 46 to Nelia Policy NF-247 ML20100E5311985-03-26026 March 1985 Forwards Endorsements 47 & 40 to Nelia Policy NF-247 & Maelu Policy MF-102,respectively ML20107M4971985-02-21021 February 1985 Forwards Endorsement 69 to Maelu Policy MF-66 & Endorsement 81 to Nelia Policy NF-198 ML20106D9991985-02-0505 February 1985 Forwards Endorsements 44 & 45 to Nelia Policy NF-247 & Endorsements 38 & 39 to Maelu Policy MF-102 ML20101T7551985-02-0101 February 1985 Forwards Endorsements 78 & 80 to Nelia Policy NF-198 & Endorsements 66 & 68 to Maelu Policy MF-66 ML20112G0831985-01-11011 January 1985 Forwards Endorsement 79 to Nelia Policy NF-198 & Endorsement 67 to Maelu Policy MF-66 ML20101G8751984-12-20020 December 1984 Forwards Endorsement 5 to Nelia Certificate N-66 & Maelu Certificate M-66 & Endorsement 4 to Nelia Certificate N-75 & Maelu Certificate M-75 ML20101H1251984-12-20020 December 1984 Forwards Endorsement 43 to Nelia Policy NF-247 & Endorsement 37 to Maelu Policy MF-66 ML20101H0151984-12-20020 December 1984 Forwards Endorsement 5 to Nelia Certificates N-38,N-39 & N-40 & Maelu Certificates M-38,M-39 & M-40 ML20101F8011984-12-18018 December 1984 Forwards Endorsements 76 & 77 to Nelia Policy NF-198 & Endorsements 64 & 65 to Maelu Policy MF-66 ML20092M5881984-06-25025 June 1984 Forwards Endorsements 75 & 63 to Nelia Policy NF-198 & Maelu Policy MF-66,respectively ML20092J2331984-06-18018 June 1984 Forwards Endorsements 42 & 36 to Nelia Policy,NF-247 & Maelu Policy MF-102,respectively ML20084J1971984-05-0303 May 1984 Forwards Endorsements 41 & 35 to Nelia Policy NF-247 & Maelu Policy MF-102,respectively ML20084J1911984-05-0202 May 1984 Forwards Endorsements 74 & 62 to Nelia Policy NF-198 & Maelu Policy MF-66,respectively ML20086U1421984-03-0101 March 1984 Forwards Endorsement 34 to Maelu Policy MF-102,correcting Policy Number on Endorsement 33 from MF-77 to MF-102 ML20086T2611984-02-28028 February 1984 Forwards Endorsement 40 to Nelia Policy NF-247 ML20086T4341984-02-28028 February 1984 Forwards Endorsement 73 to Nelia Policy NF-198 ML20080M6741984-02-13013 February 1984 Forwards Endorsements 71 & 72 to Nelia Policy NF-198 & Endorsements 60 & 61 to Maelu Policy MF-66.Amended Site Description Also Encl ML20083F1731983-12-23023 December 1983 Forwards Endorsements 36 & 37 to Nelia Policy NF-247, Endorsements 30 & 31 to Maelu Policy MF-102,Endorsements 4 & 3 to Nelia Certificates N-66 & N-75 & Endorsements 4 & 3 to Maelu Certificates M-66 & M-75 ML20083F1341983-12-23023 December 1983 Forwards Endorsements 4 to Maelu Certificates M-40,M-39 & M-38,Endorsements 4 to Nelia Certificates N-40,N-39 & N-38, Endorsements 59 & 58 to Maelu Policy MF-66 & Endorsements 70 & 69 to Nelia Policy NF-198 ML20076B6841983-08-16016 August 1983 Requests to Be Informed of Anticipated Date of Fr Notice on Util 821227 Request for License Amend for Use of Vol Reduction & Solidification Sys ML20077G6591983-08-0101 August 1983 Forwards Endorsement 35 to Nelia Policy NF-247 & Endorsement 29 to Maelu Policy MF-102 ML20076L8411983-07-15015 July 1983 Forwards Endorsement 34 to Nelia Policy NF-247 & Endorsement 28 to Maelu Policy MF-102 ML20076M0941983-07-15015 July 1983 Forwards Endorsement 68 to Nelia Policy NF-198 & Endorsement 57 to Maelu Policy MF-66 ML20024C7671983-07-0505 July 1983 Forwards Endorsements 66 & 67 to Nelia Policy NF-198 & Endorsements 55 & 56 to Maelu Policy MF-66 ML20076K0831983-06-30030 June 1983 Forwards Endorsement 33 to Nelia Policy NF-47 & Endorsement 27 to Maelu Policy MF-102 ML20074A7211983-05-0303 May 1983 Forwards Endorsements 65 & 54 to Nelia Policy NF-198 & Maelu Policy MF-66,respectively ML20073R4981983-04-29029 April 1983 Forwards Endorsements 32 & 26 to Nelia Policy NF-247 & Maelu Policy MF-102,respectively ML20072H3901983-03-15015 March 1983 Forwards Endorsement 31 to Nelia Policy NF-247 1990-06-25
[Table view] |
Text
a
-r REGULATORY I.'~FOR. IA T ION DISTR IOUT ION SYSTEi~
(R IDS)
ACCESSION;uBR FACII:50 259 50-260 50-296 50-327 50 328 A U T H ~ t'i A &E FIELDERS J REC IP ~ "iA~E DINITZg I ~
- 8010150ii20 DOC ~ DATE: 80/10/08 NOTARIZED:
NO DOCKET 6rowns Ferry l4uclear Power Stations Unit li Tennessee 0500025 Browns Ferry 'nuclear Power Stations Jnit 2i Tennessee 0500026 8rowns Ferry nuclear Power Stations Unit 3r Tennessee 002 Seouoyah
'Nuclear Planti Unit lr Tennessee Valley Auth Ob 2
Sequoyah
'nuclear Planti Unit 2i Tennessee Valley Auth 0500032 AU THOR aFF ILI A T ION
,'>a rsh K PlcLennani Inc ~ ~
i1 3
induc I ear Consul t ants i Inc ~
D i v.
RECIPIENT AFFILIATION Utility Finance Branch
SUBJECT:
For waras Endorsement 38 to "iAELU Policy NF 19'raft f.orwardi 0 1ST'UUT ION CODE:
i0015
.COP I TITLE: Insurance:
Indemni ty/En 9 to A'~l Poli'cy NF-247iEndorsements 3u HF-bb 8
Endorsement Wl to ANI Policy ng 1 t rs enc 1
~
ES RECEIVED: L TR
<ENCL SIZE' 8 dorsement Agreements NOTES 'i Cunningham all amends to FSAR 8
cnanges to 1'ech Specs.
Cunningham all amends to FSAR a changes to Tech Specs'500032 0500032 REC IP I E,u I ID COBE/XA~>E I'iTERVAL: A/D E 'S.G 07 c'(
FI 01 U
t Al BR 08 COPIES LTTR ENCL 1
0 1
1 1
1 REC I P IF ri T ID CUOE/~'iA~lE rJRC POR 02 SOULESgJ
~
06 COPIES LT1 R ENCL 1
1 1
1 EXTERNAL: LPOH v3
[NS I C 0Q 1
1 OCT 16 1980 TOTAL i'4UNdER OF CUP IES REQUIRED:
L T T R ~
Ei'>CL
0 V
l
IW
~ IVI4 ~ l 'lllUIV
\\A~
Dalias, Texas?5~
Telepiione 214 i~~-1941 October 8, 1980 Hr. Ira Dintz Office of Antitrust
& Indemnity Nuclear Reactor Regulation Nuclear Regulatory Commission Washington, D.
C.
20555 Tennessee Valley Authority Browns Ferry Nuclear Plant Endorsements 34,38 to LLL'-66 Endorsement 41 to NF-198 Endorsement 9 to NF-247 Your letter to Tennessee Valley Authority 24 Se tember 1980
Dear Hr. Dinitz:
This is to follow up our telephone conversation of October 7,
1980 and your letter to Tennessee Valley Authority dated September 24, 1980.
Enclosed are the following items:
A copy of Endorsement 89 to ANI Policy NF-247 on Sequoyah Nuclear Plant and a copy of our 1/5/78 transmittal letter to the NRC.
A copy of Endorsement 834 to PAELU Policy Wi -66 on Browns Ferry Nuclear Plant and our transmittal of 2/9/78 to the NRC.
A copy of Endorsement 838 to MELU Policy i~iP-66 on Browns Ferry Nuclear Plant and our transmittal letter of 1/17/79 to tEe NRC.
A copy of Endorsement:r41 to duXI Policy NF-198 on the Browns Ferry Nuclear Plant and our transmittal letter to the NRC dated 1/5/78.
A copy of our letter to 'Ar. Dodson dated 10/30/79 regarding the Fndorse-ments
!234 and 841 listed above.
The Endorsement 840 to rvatts Bar Nuclear Plant ANZ Policy NF-256 was requested,
- however, the last endorsement issued on that policy was
-'9 and a copy of our transmittal letter to the NRC dated 2/>3/80 is enclosed.
Should you have any questions regarding any of these endorsements, please let us know.
Sincerely,
~ '
-! / ir:,g% -~ ~(.
g< Jean Fielder cc: L. L. Snell, J.
R.
Honahan A technicai service of i4arsh 8 McLennan. Incorporated QRO p
ok
4 t
5Qp+p1 Looc elvcloAt ~ja 504 t
!IN'Lvto Loia of Pureluaa in'snnecc see Vid.lov Author ty 633 Cars tout Gtcaat C'aCtaaooga~
ance.ccsac
- 37401, uyoc q<l 1 rgl l h,'ucl~R9'J.O1t Fndorselacclt 634 i,c'6
~wc>XL' 0 '>r DlC'.l:
cPw PQ~
tn COT! ilaK Pv Ef Shr~O Oi~RS~
Wh<s
- ou.-r.l c 'o"na.d t
- :rt ci;c "..:"..;:s:c! loca@
c! t;lo coat=a:lclc.'r, 'orac-,-.c::t:; ~
i 18ll8o ilhvQ.ix' J, i., Pot oA so i..fox'c.'c c! ~
i'lease lc "-
..".c! '.:.no.r 'f "u.;lee oo":i. tallco i.- <<c cu'ro::,,'.Cl..
Vcr:: tZuly 7O r",
JOilP.
Lao IJuCVe y J>>
~
CC Vo C~ Olin J ~
..C SPQ O~ p'
y~~~rv 3.
Xn>>g
.'!r. Jerome Sa'aiga-...
hicE Office cf Antitrust F Inde',nity
- nuclear Peactor
.,e~ula"ion lluclen Re".,ulato; Cor:=ission
>nc Uashinpton.
D. C.
-'"- 5=
Tennessee Valley Authority Sequoyah huclear Plant
>~<",L4. Pacilitv Pol>>cy 'T-2l>7 Lndorserent 89 Cert'ied Cooies
Dear Jerry:
closec for your files are eipnt Advance Prmiua ndorsenent P9 to Policy ".~~-"47.
certified copies of the 1978 is Secuoynh
'.I L~k 2'acility Very truly yours, John P.. DucI;, Jr.
cc:
C.
P..
Dodson E. J.
Brooks C.. Bollrmn
I
N I I
~
I
')
1 )
AOVANC I
0 ANOARO PREP Iup ENOORSEl&NT 2)
CHANGES UBS RIBING COMPANIES ANO IN THEIR PROPORTIONATE LIABILITYENDORSEMENT r
I
~
Calendar Year 197S,~
~
,r J
~
la.
ADVANCE PREMIUM: It is agreed that the Advance Premium due the companies
~II i I
I:
I P
9 b.
STANDARD PREMIUM ANO RESERVE PREMIUM:
In the absence of a change in the Advance Premium indicated above, it is agreed that, subject to the pro-visions of the Industry Credit Rating Plan, the Standard Premium is said Advance Premium and the Reserve Premium is:
I
~
I l~
)~
2.
It is agreed that with respect to bodily injury or property damage caused,.
during the effective period of this endorsement, by the nuclear energy.
hazard:
a.
The word "companies" whe'rever used in the policy means the '.
subscribing companies listed on the reverse side of this ".)
- ~
- ,:::. 'b.
The policy shall be binding on such companie's only.'-"-'-"'t.::
~ ".
.-~-';
Each such company shall be liable only for its proportion of any obligation assumed or expense incurred under the,.';,
policy because of such 'bodily injury or property damage - -: ""-
as designated on the reverse, side of this endorsement'..:
3.;-": It is agreed that the effective period of this endorsement is from the beginning of the effective date of this endorsement stated below to the,,,-,'.:
';.'.:~:::
close of December 31st of the Calendar Year designated in the caption above, or to the time of. the termination or cancellation of the policy,-,.;.
>f sooner.
I
~
~
)
J
~ A ~ ~
~
PINK COPY A6ENT/BROKER' Effective Date of January
]
] 97/
this Endorsement t2.01 A.M. Standard Time issued to' t r 't e r
V,,1]ov A that'gatv
~ )
'ate of issue December 20 1977' For the su cri co ies D
To form a part of Policy No I
~
~ )
-'. ~
~
~
Endorsement No
~
~
I NE-3S (Il1r7S)
~
(
9 I
I I
I I
By
"~if'ountersigned by I
Generai Manage
0 4'g
?='-error'w SaltzrLan Office of r'itrust h lrcie~ity buclen>> eactor Replllation
- .uclecr Pagulatory Co~'.ission Pashin.ton, D.
C.
20555 Tennessee Valley Au hority Drowns Parry;ucleer Power Station ZIP~ ?olicir ~ 55
.;ndorsenent 3~!
'advance "re-.,iur.. 197~
Dear i',
- r. S&~tznan:
=.ncloseci are Gight certified copies of Znc'.crsezent
."3<. tc !~.LU's Policy!:P-66 to the 3rovns Perr, Nuclear ?o~er Station o
VA.
Sho '1" you have any question~~
please let us knox.
ery truly yours, John P.. Duck, Jr.
cc'>>
J
~ Brooks G
C. '". Bollman C.
".i. Dccison Encioaare
0
NVCLRAR ENERGY I lABtLlYY1NSURANgg NVYUAL ATOMIC ENERGY LIABILlTYUNDKRVfRlTRR5 ADVANCE PRLMIUM ENDORSEMENT and STANDARD PREMIUM L'NDORSFHFNT
.Ca I.ender Year 1978 1.
ADVANCE PREMIUM It is agreed that the Advance Premium due the companies for the calendar year designated above is
$ 98.178 75 2.
STANDARD PREMIUM AND RESERVE PREMIUM In the absence of a change in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Industry Credit Rating Plan, the Standard Premium and Reserve Premium are:
Standard Premium Reserve Premium 7>i94D 85 Egective Date o]
January 1,
1 9 78 this Endorsement To cform 4 part MF-66 ot Policy No Tennessee Valley Authority Issued to January Qg,l-, $978 D4+ Of Jy
~co 'W TU+I lRUi CU~" "'
.,l RGB l'G<lGY
~tlt~gAR
, p. h'.-... k4" - "
For the Subscrlblng Compdnlei i
!MQTU~~OMlC ENERGY LIhBlLITYUNDERWRITERS I
~
('.GQQ)hg've, 'bI RltaARP t.:o UNDtRyRlIUZ
~
~
LgltRQ< l lAQLUTi hUTUAl. A 0 Countersigned hy AUTlloHlxKU1lK1'dl'Ai:8Th'nvl:
jo
ai1el
~
g ~tits'v par~
a y~cuit) offic~
p+~ugetgon Qo~gggon Reactor Nuc3ea Onq q ennessee 4alley Aucnor w~o~~
BroRls ie-ry Liuclenr c OUQ Scc
~on vance Premiu-.
157""
Endorsement
.'".3C Polic7 "P-66 P~ITl~+~
/%Q~g~(%
Dear ~'v Sal"wan:
F l >
re e~*'a" cer"XZie"'ozies o."-.nclorsc;"en"
= 'o
-'.90,17G. 75.
S incer ely)
Jean Fielcer cc:
J..'!. ilcSveeny rt T
v ~ '. ~
~o >c,s s'
Sr.j'tne nclosures
~\\
~ ~
rh A
~
~
I'Oi<I[C I'ii r BCzW I I A.. If I' Y )!.'Rh'tf
" I'fiS r'.I')<'r'.'i(-'fi I'Hf'.i'lfU.'.! r'if ')
S I r'if'l3r'iiif> I'<(li.".'Ii.i.'. l'.i'IJ(J'ft.'!:..'.!f:.
I/i ~(<I)S I; <
i5 <.<,'r'.i('I(f1'.law(r (~V.'.Il r <'iO f." I I !'.If(
I'f~('I'Or"'IC< AT:- I.fr'. ILI Y I'. D('RSri""-i' Cal n(.'ar Yc=v
-a
~
)
~
- i. i i '
1
~
~
i
- sDK A<'
<1 't;:i:,I;<..' 's a~! c<.'(< ','illi 'I.c ri(;v;11!Ce: c. 1! <<::! dllc tt!Q co!1'<i)il:)i<:s I('1'.')Q i)cv!o(i ties! <<'<a tc(
a<)ovo is:
~
98 i I, r 8 e
( 0
>>C <.: i< eD <fxD ! IIV.ai!IVI.f rial
)
ii<4 V!i R iaifft"~:
I'l t<'lc aOSQi.c(! 0'l c'.".anf.c in tflo:K(!Va:)cc !)vc:.".i<<:n ind!cate(! ai;o.<:, it is a"reed t!:a:1 I
~
~
sl!Oicct to !Ilc;)1ovisions ol
'.I:Q Ir)(!"st! y C) (:<'i'. Batini; n!Ian, 1!)c St
~ (!avd
< vcn:i<<':: i';ii(lr'i(.v;il!cc I v<:::)i"::1 a:ld !nc !'.Qscl vc i"!Q<vi"m is:
73, 940. S5 I 1 1 s:l('1'CCd i!iil Cill!s< ii Cl t!1 1!1 I 1!Elcl iav c::c!.gy t;i!t!; vcsocc'.
to bodily injt:vy ov f)vo:)c: tv
<..agc
~ ~:nc <'!fcciivc t)c!'i<>('f ti!.s Qrdorsc.-.!Qnt, ioy t!!Q Ililaill (::
~
~
a
~
1!'c 'ivol co!<)pan!Qs':ncvcvc>>
(1scd 1!1 tnc
)0<le" n! Cans thc
<<;)scr!bll)g col!<)anl< s i!stot oil tll( 1<<(
bc Glc c ol
'.his endor'nlcnt.
b.
~ Ilc policy silall BQ I'Indin<~ on st!CI! co<!'.;)anics orly 1
c.
"ac!1 "1!cil c ~<) pary
!:all a<! 'iaI)lc o:11.,
fov it'ro<i)or;!On 1
u! any O'if.",<t!on ss(',Ale(i ov c.;oQ sc I"cl!1'1'cc ';
~dc '
lc i)ol:cy ')Qci".il!)c of stlc+ I)od!;v 'n;<iv'r ol')vo r(!1ty damage as dc '1<'.naicd ol'. '..Q 1 Qvcvsc sldc ol tnfs
(!'.'1 ovscr.!<'nt.
3.
It is a, v<<cti 1!:at t!!c Q.".Qc'.ivc yc! iod of t!!is Q<!d<)vscr.:Qnt is f!Onl the bcg!nl)l!)g oi t!1(: <if'ice!1vc ()ati! Qf i!!s Q!'!dol s('<rent Gtl<t<!(! bcloiv to t!!c c!Osc of Deco::;bcr 3ls: of thc Calo"der Year <<!Qsi~natcd in t'.c ca" tion a ovc, ov to t!!c "..r!Q o. tl!c tovminaio~gEgmt(taacsd~~t cn o.'l:c i)o 1 1cy, 1 f scone..
- <UE COPY Of E!NOII.BK~TI:3
- ,AOE PART Of Rbvleeg P~ <~Y PAC<tflYf0'O.&~~0.
'SUMCE 5 ARO~ CRT TM TRUE COPY.
<<!!Oct!VQ Date 0!
- I:is I!dol sc::!Qnt T"n<<avy I
~
19 <9 IZ: 01 r'i.hf. Standard
'i'i:;:c TT<.OOm CECA. KCRO4Vf MUTUAtATOM!C EhRGT t!A4"JIY NOEW<TERRS I
a !)a)'t ol I <)1!c";io
<ss<<Qd o
T<.nn<.s sec i':1'.icy iU nw) ritv Da'tc of Iss< c
<:ccn)l)Q v )~
107$
3H C
uciear Encl gy Liabiiityinsur NUCLEAR EflERGY LIABILITYINSURANCE,DISSOCIATION 1)
ADVANCE PREMIUM AND STANDARD PREMIUM ENDORSEMENT 2)
CHANGES IN SU8SCRISING COMPANIES AND III THEIR PROPORTIONATE LIABILITY EI;OORSEMENT Calendar Year 1978 la.
ADVANCE PREMIUM: It is agreed that the Advance Premium due the companies for tne per1od designated above is:
338,171.25 b.
STANDARD PREMIUM ANO RESERVE PREMIUM:
In the absence of a change in the Advance Premium indicated above, it is agreed that, subject to the pro-visions of the Industry Credit Rating Plan, the Standard Premium is said Advance Premium and the Reserve Premium is:
S 254,685.15 2.
It is agreed that with respect to bodily injury or property damage
- caused, during the effective period of this endorsement, by the nuclear energy hazard:
a.
The word "companies" wherever used in the policy means the subscribing companies listed on the reverse side of this endorsement.
b.
The policy shall be binding on such companies only.
c.
Each such company shall be liable only for its proportion of any obligation assumed or expense incurred under the policy because of such bodily injury or property damage
~ -
as designated on the reverse side of this endorsement.
3.
It is agreed that the effective period of this endorsement is from the beginnirg of the effective date of this endorsement stated below to the close of December 31st of the Calendar Year designated in the caption above, or to the time of the termination or cancellation of the policy, if sooner.
(Over)
Effective Date of January
],, 1978
'hts Endorsement 12:01 A.M. Standard Time issued to Tennessee Val 1 e Authorit Date of Issue December 20 1977 To form a part of Policy No or the su cribing cor panies Endorsement No NE-35 (1/1/78) 41 By Countersigned by General Manager
P
~ ~ roooao v 9 t Jerome Salt ran WL cc oC r~atitrust 6 Xndrrnfti i;uclear Peactor
."..ecula+~ on
- nuclear Le~ul torr "o
~o'~
so~on a ~
mpn'lessee
~g lie.q ~u-nority crowns terry '!ucleer Plan" ac'-l C
-"ncorse-.;.en=
..i~1 Cer"i ied Conies Deer Jerr~:
nclosed
~or or.sour i es ere ai~ht car"i"iefi conies c
10 o
t zj 7 ores Ferr:
.'ULLED tf'e y truly yours, 2'oim P..
Duc!: Jr.
cc:
C.
":.. Doason
"~ e J o orooc's C.. Boll=an
4J lpga t'
1
Q t~
vie o~ 'c'Yi~G3.09
'Ee~nesoee
',~a'Iav Aec~orie~.
> " 'F"ci'~"v ~c ~ic..
-t'.ciossa;,>n::~
'i "i ie~<<'GLt: T'D I
se L 'r eQr reeve p e pi g eep~ig>>
0 a.c Leg'%esse@;Q gp)+
';gt <<g+~q
- vis e"..dcrsmac is the 19";0 Atv
- .rec.
~eandarR ar.d Reserve ~~%4 GiTlCGre sesn Pie2.car (:frs.)